JPM JOB PERFORMANCE MEASURE Page 1 of 13 JPM TITLE: Manually Makeup to the VCT JPM NUMBER: PBN JPM P004.027b.COT REV. 7 TASK NUMBER(S) / PBN P004.027.COT / Manually Blend to the VCT / RWST TASK TITLE(S):
K/A NUMBERS: 004 A4.12 K/A VALUE: 3.8 / 3.3 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 15 Minutes Time Critical: No Alternate Path [NRC]: Yes Alternate Path [INPO]: Yes TR-AA-230-1003-F10, Revision 2
PBN JPM P004.027b.COT, Manually Makeup to the VCT, JPM Rev. 7 Page 5 of 13 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Unit 1 Operator at the Controls.
- Leakage at the charging pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
- The CVCS system is in its normal at-power alignment with a single letdown orifice in service.
- The on-service boric acid storage tank, T-6A, concentration is 3.75%.
- Unit 1 Letdown Gas Stripper is on-line.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to raise VCT level approximately 15% at the current RCS boron concentration per OP 5B, Blender Operation / Dilution / Boration, Attachment G, Manual Blend to the RCS.
- NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
PBN JPM P004.027b.COT, Manually Makeup to the VCT, JPM Rev. 7 Page 6 of 13 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 4.1 DETERMINE the desired blender output concentration.
Critical N Standard: The examinee determines the existing acid and water flow setpoints for the present boron concentration by referencing:
Operating experience, or Using the Blender Data Manual Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 2 4.2 SET HC-111, RMUW Flow Controller, to desired FLOWRATE.
Critical Y The examinee determines that controller HC-111 is set at 50 gpm and Standard:
resets to 40 gpm.
Evaluator Note: If the examinee leaves the RMUW controller set at 50 gpm, then this step becomes NOT critical and step 3 becomes critical.
Evaluator Cue: If the incorrect controller setting for 1HC-111, RMUW Flow controller, is reported to OS1, then acknowledge the report and direct the examinee to set the controller to the correct setting and continue making up to the VCT.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P004.027b.COT, Manually Makeup to the VCT, JPM Rev. 7 Page 7 of 13 Performance Step: 3 4.3 SET HC-110, Boric Acid Flow Hand Controller, to desired Critical N FLOWRATE.
Standard: The examinee determines that no adjustment of controller 1HC-110 is necessary.
Evaluator Note: The dial should remain unchanged if the RMUW controller is adjusted to 40 gpm in the previous step, (then this step is NOT critical).
This step becomes CRITICAL if the RMUW controller is left at 50 gpm. Then the boric acid controller should be set at approximately 8.5 gpm.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 4 4.4 ENSURE the following valve control switch positions:
Critical N
- CV-111, RMW to Z-1 BA Blender Flow Control, in AUTO
- CV-110A, BA TO Z-1 BA Blender Inlet FCV, in AUTO
- CV-110C, T-4 VCT Boric Acid Inlet Flow Control in AUTO or if VCT BYPASSED, THEN OPEN (circle one).
Standard: The examinee determines:
- 1CV-111, RMW to Z-1 BA Blender Flow Control is in AUTO
- 1CV-110C, T-4 VCT Boric Acid Inlet Flow Control is in AUTO Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P004.027b.COT, Manually Makeup to the VCT, JPM Rev. 7 Page 8 of 13 Performance Step: 5 4.5 PLACE the Reactor Makeup Mode Selector Switch to BLEND.
Critical Y Standard: The examinee places the Reactor Makeup Mode Selector Switch to the BLEND position.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 6 4.6 PLACE the Reactor Makeup Control Switch to START.
Critical Y Standard: The examinee places the Reactor Makeup Control Switch to the START position and ensures the RED light is LIT.
Evaluator Note: Verification of the RED light is NOT critical.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 7 4.7 WHEN required to maintain VCT pressure and level, THEN Critical N PLACE CV-112A, VCT Level Control Divert, to DIVERT.
Standard: The examinee acknowledges the guidance of this step and returns to it as it is needed to control VCT pressure and level, and moves on with the procedure.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P004.027b.COT, Manually Makeup to the VCT, JPM Rev. 7 Page 9 of 13 Performance Step: 8 4.8 While CONTINUING with this procedure, CHECK system for Critical N proper response AND MONITOR the following parameters:
- VCT level / pressure
- RCP seal leakoff flow
- Rx power / Count Rate
- RCS temperature Standard: The examinee monitors the listed parameters.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
NOTE: AFTER THE BLEND IS STARTED AND IS STABLE, THEN INSERT TRIGGER 1 TO CAUSE THE RMUW CONTROLLER TO FAIL. DO NOT INSERT THE MALFUNCTION UNTIL THE BLEND IS STARTED AND STABLE.
Performance Step: 9 The examinee responds to the RMUW deviation alarm or increased Critical Y dilution rate and takes action to secure makeup to the VCT or takes manual control of 1HC-111 and adjusts RMW flow to ~40 gpm.
Standard: The examinee secures makeup to the VCT or takes manual control of 1HC-111 and adjusts RMW flow to ~40 gpm prior to VCT level rise of
> 15%.
Evaluator Note: ARB 1C04 1C 3-8, Reactor Makeup Water Flow Deviation, allows either option to respond.
The RMW deviation alarm may NOT actuate if makeup is promptly secured.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Terminating Cues: This completes the JPM.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 12 JPM TITLE: Raise Pressurizer Level in Manual JPM NUMBER: PBN JPM P002.009.COT REV. 0 TASK NUMBER(S) / PBN P002.009.COT / Fill and Vent the RCS TASK TITLE(S):
K/A NUMBERS: 002.A1.02 K/A VALUE: 3.6/3.9 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform:
EVALUATION LOCATION: In-Plant: Control Room:
Simulator: Other:
Lab:
Time for Completion: 15 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by: Andrew Zommers Instructor/Developer Date Reviewed by: Jeff Hinze Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10 Revision 2
PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 JPM Page 5 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Balance of Plant Operator.
- Unit 1 is coming out of an outage filling and venting the RCS per OP 4A, Filling and Venting Reactor Coolant System.
- Pressurizer Level is 58% Cold Cal, and needs to be raised for the next shift.
- Purification flow is approximately 42 gpm.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to raise Pressurizer level to 60% Cold Cal with 1P-2A Charging Pump from the VCT using OP 4A, Filling and Venting Reactor Coolant System starting with Step 5.10.15.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 Revision 2
PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 JPM Page 6 of 12 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical N COMPLETE the following steps:
- a. SHUT CV-135, LP Letdown Line Backpressure CV, to secure Letdown flow.
Standard: Examinee shuts 1CV-135 by ensuring controller is in Manual and Shut.
Evaluator Note: The following may actuate when CV-135 is shut:
- PPCS Priority Alarm - Letdown Line Flow
- Annunciator: 1C03 1D 2-1, 1P-1A or B RCP Labyr Seal P Low Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 JPM Page 7 of 12 Performance Step: 2 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical Y COMPLETE the following steps:
- b. PERFORM one of the following (N/A option NOT used):
- OPEN CV-112C, T-4 VCT Outlet To Chg Pump Suct MOV Standard: Examinee opens 1CV-112C and N/As opening CV-112B.
Evaluator Note: Documenting N/A for opening 1CV-112B is not critical.
The following may clear when 1CV-112C opens:
Evaluator Note:
- Annunciator: 1C03 1D 2-1, 1P-1A or B RCP Labyr Seal P Low Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 JPM Page 8 of 12 Performance Step: 3 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical Y COMPLETE the following steps:
- c. START a Charging Pump to raise Pressurizer level (VCT level will also lower if CV-112C is OPEN)
Standard: Examinee should start 1P-2A Charging pump per turnover.
Evaluator Note: PPCS VCT Pressure Low Alarm may be received.
Evaluator Cue: If asked, PAB AO reports and pre-start checks of 1P-2A Charging Pump are satisfactory.
If asked, PAB AO reports back any post-start checks of 1P-2A Charging Pump are satisfactory.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical Y COMPLETE the following steps:
- d. WHEN desired level is attained, THEN STOP Charging Pump.
Standard: Examinee stops 1P-2A Charging Pump.
The following may alarm when the charging pump is secured:
Evaluator Note:
- Annunciator: 1C03 1D 2-1, 1P-1A or B RCP Labyr Seal P Low Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 JPM Page 9 of 12 Performance Step: 5 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical N COMPLETE the following steps:
- e. IF CV-112C is OPEN, THEN OPEN CV-112B (Mark N/A if CV-112C is SHUT)
Standard: Examinee opens 1CV-112B.
The following may clear when CV-112B is opened:
Evaluator Note:
- Annunciator: 1C03 1D 2-1, 1P-1A or B RCP Labyr Seal P Low Evaluator Note: 1CV-112B is opened to satisfy an interlock which allows closing of 1CV-112C.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical N COMPLETE the following steps:
Standard: Examinee shuts 1CV-112C.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
JPM PBN JPM P002.009.COT / Raise Pressurizer Level In Manual, Rev. 0 Page 10 of 12 Performance Step: 7 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical N COMPLETE the following steps:
Standard: Examinee shuts 1CV-112B.
The following may alarm when CV-112B is closed:
Evaluator Note:
- Annunciator: 1C03 1D 2-1, 1P-1A or B RCP Labyr Seal P Low Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 5.10.15 IF necessary to raise Pressurizer level OR reduce VCT level, THEN Critical N COMPLETE the following steps:
- h. ADJUST CV-135, LP Letdown Line Backpress CV, to attain desired purification flow rate.
Standard: Examinee should stabilize pressurizer level and establish about 42 gpm purification flow.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: THIS COMPLETES THE JPM NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10 Revision 2
JPM Page 12 of 12 TURNOVER SHEET INITIAL CONDITIONS:
- You are the Balance of Plant Operator.
- Unit 1 is coming out of an outage filling and venting the RCS per OP 4A, Filling and Venting Reactor Coolant System.
- Pressurizer Level is 58% Cold Cal, and needs to be raised for the next shift.
- Purification flow is approximately 42 gpm.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to raise Pressurizer level to 60% Cold Cal with 1P-2A Charging Pump from the VCT using OP 4A, Filling and Venting Reactor Coolant System starting with Step 5.10.15.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 17 JPM TITLE: Respond to a Loss of Reactor Coolant to a Shutdown Unit JPM NUMBER: PBN JPM P000.046.COT REV. 7 TASK NUMBER(S) / PBN P000.046.COT / Respond to a loss of coolant accident in a shutdown unit.
TASK TITLE(S):
009 EA1.01 009 EA1.04 4.4 / 4.3 3.7 / 3.5 K/A NUMBERS: 009 EA1.08 009 EA1.16 K/A VALUE: 4.0 / 4.1 4.2 / 4.2 009 EA2.01 009 EA2.39 4.2 / 4.8 4.3 / 4.7 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform:
EVALUATION LOCATION: In-Plant: Control Room:
Simulator: Other:
Lab:
Time for Completion: 20 Minutes Time Critical: Yes No Alternate Path [NRC]: Yes No Alternate Path [INPO]: Yes No Developed by: Andrew Zommers Instructor/Developer Date Reviewed by: Jeff Hinze Instructor (Instructional Review) Date Validated by:
SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 5 of 17 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 is in the process of cooling down from hot standby to cold shutdown.
- OP-3C Unit 1, Hot Standby to Cold Shutdown Unit 1 in progress; completed through Step 5.21, ready to place RHR in operation.
- RCS temperature is approximately 340 °F.
- RCS pressure is approximately 300 psig.
- Pressurizer level suddenly begins to lower.
INITIATING CUES (IF APPLICABLE):
- The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 6 of 17 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 SEP-2 Unit 1 Shutdown LOCA Analysis Critical N 1. Check both SI Accumulators - ISOLATED Standard: The Examinee checks both SI accumulators isolated by checking the accumulator MOVs, 1SI-841A and 1SI-841B deenergized and the SI Spray Ready Status Lights for 1SI-841A and 1SI-841B lit.
Evaluator Note: Only provide the Examinee with SEP-2, then provide the next reference when requested (SEP-2.1, SEP-2.2 or SEP-2.3)
Evaluator Note: If asked an extra operator will ACKNOWLEDGE PPCS alarms Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 7 of 17 Performance Step: 2 SEP-2 Unit 1 Shutdown LOCA Analysis Critical Y 2. Check One Train of RHR Aligned For Decay Heat Removal Standard:
- The Examinee checks that RHR is not aligned for decay heat removal by checking the status of 1P-10A&B RHR pumps suction header MOVs, 1RH-700 and 1RH-701 and the RHR return to RC MOV, 1RH-720 and
Evaluator Note:
- SEP-2.2 and SEP-2.3 are available is an incorrect transition is made.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 SEP-2.1, Shutdown LOCA with RHR Aligned for Low Head Injection Critical N 1. Isolate RCS Letdown:
- a. Shut letdown orifice outlet valves
- 1CV-200C Standard: The Examinee places the control switches for the letdown orifice outlet valves, 1CV-200A, 1CV-200B and 1CV-220C to the close position and verifies they go shut.
Evaluator Note: The orifice outlet valves may already be shut due to low pressurizer level and interlock with 1RC-427.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 8 of 17 Performance Step: 4 1. Isolate RCS Letdown:
Critical N b. Shut RCS loop B cold leg to CVCS letdown isolation
- 1RC-427 Standard: The Examinee places the control switch for the RCS loop B cold leg to CVCS letdown isolation, 1RC-427 to the close position and verifies it goes shut.
Evaluator Note: 1RC-427, RCS loop B cold leg to CVCS letdown isolation may already be shut due to low pressurizer level.
Performance:
SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 2. Establish Design Charging Flow Rate Using RWST Suction:
Critical Y a. Open RWST charging pump suction
- 1CV-112B Standard: The Examinee places the control switch for the RWST charging pump suction, 1CV-112B to the open position and verifies it goes open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 2. Establish Design Charging Flow Rate Using RWST Suction:
Critical Y b. Shut VCT outlet valve
- 1CV-112C Standard: The Examinee places the control switch for the VCT outlet valve, 1CV-112C to the close position and verifies it shut.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 9 of 17 Performance Step: 7 2. Establish Design Charging Flow Rate Using RWST Suction:
Critical Y c. Establish 76 gpm charging flow Standard: The Examinee adjusts running charging pump(s) speed and 1HC-142 valve position to establish 76 gpm charging flow.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 3. Check Leak Rate - GREATER THAN CHARGING FLOW:
Critical N o PZR LEVEL TRENDING LOWER OR o PZR level less than [32%] 13%
- 1LI-433 OR o RCS subcooling based on core exit thermocouples less than [74°F]
35°F Standard: The Examinee checks pressurizer level trending lower or less than [32%] 10%
on 1LI-433 or RCS subcooling less than [74°F] 35°F.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 4. Establish Maximum Charging Flow:
Critical Y a. Fully open charging flow control valve
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 10 of 17 Performance Step: 10 4. Establish Maximum Charging Flow:
Critical Y b. Start additional charging pumps
- 1P-2C Standard: The Examine starts additional available charging pumps, 1P-2A, 1P-2B and 1P-2C by placing the control switch(es) to the Start position.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 4. Establish Maximum Charging Flow:
Critical Y c. Limit charging flow to less than 140 gpm by adjusting charging pump speed as necessary Standard: The Examinee adjusts running charging pump(s) speed to limit charging flow to less than 140 gpm.
Evaluator Cue: If asked, Charging Pump 1P-2B can be run.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 5. Initiate Containment Isolation Critical N Standard: The Examinee depresses both containment isolation pushbuttons and acknowledges the annunciator Unit 1 Containment Isolation (C01B 2-5).
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 11 of 17 Performance Step: 13 6. Stop RCPs Critical Y
- 1P-1B Standard: The Examinee places the control switches for reactor coolant pumps, 1P-1A and 1P-1B to the stop position and verifies they are secured.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 14 7. Initiate the following actions Critical N a. Evacuate Containment Standard: The Examinee performs containment evacuation.
Evaluator Note: Examinee to sound plant evacuation alarm and announce that personnel to leave unit 1 containment.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 15 7. Initiate the following actions Critical N b. Notify DCS and implement Emergency Plan Standard: The Examinee directs the OS1/SM to notify the DCS and implement the Emergency Plan.
Evaluator Cue: I will notify the DCS and implement emergency plan.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 12 of 17 Performance Step: 16 8. Check Low Temperature Overpressure Protection In Service Critical N Standard: The Examinee checks Low Temperature Overpressure Protection In Service by:
- Checking Key #3(s) installed and in the on position,
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 17 9. Establish Flow From One SI Pump:
Critical N a. Open both RWST outlet to SI pump valves
- 1SI-825B Standard: The Examinee verifies 1SI-825A and 1SI-825B RWST outlet to SI pump valves are open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 18 9. Establish Flow From One SI Pump:
Critical Y b. Open both train B reactor vessel injection valves
- 1SI-878C Standard: The Examinee places the control switches for the train B reactor vessel injection valves, 1SI-878A and 1SI-878C to the open position and verifies they open.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 13 of 17 Performance Step: 19 9. Establish Flow From One SI Pump:
Critical Y c. Start SI pump B
- 1P-15B Standard: The Examinee places the control switch for the SI pump B, 1P-15B to the start position and verifies pump starts and has proper discharge pressure and flow.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 20 9. Establish Flow From One SI Pump:
Critical N d. Throttle train B SI pump discharge header as necessary to maintain subcooling greater than [74°F] 35°F
- 1SI-866B Standard: The Examinee throttles train B SI pump discharge header, 1SI-866B as necessary to maintain subcooling greater than [74°F] 35°F.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 21 10. Check If Low Head SI Flow Is Required:
Critical N a. RCS subcooling based on core exit thermocouples less than [74°F]
35°F Standard:
- The Examinee checks subcooling greater than [74°F] 35°F and
- Goes to Step 12.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 14 of 17 Performance Step: 22 12. Verify Containment Sump Recirculation Not Required:
Critical N a. Check RWST level - GREATER THAN OR EQUAL TO 60%
Standard: The Examinee checks RWST level greater than 60%.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 23 13. Verify Adequate Injection Flow:
Critical N a. Check reactor vessel level narrow range - GREATER THAN 20 FT Standard: The Examinee checks reactor vessel level narrow range on 1C20 greater than 20 feet.
Evaluator Note: This is a continuous action step.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10 Revision 2
PBN JPM P000.046.COT, Respond to a Loss of Reactor Coolant to a JPM Shutdown Unit, Rev. 7 Page 15 of 17 Performance Step: 24 13. Verify Adequate Injection Flow:
Critical N b. Check core exit thermocouples STABLE OR TRENDING LOWER Standard: The Examinee checks core exit thermocouples at 1C20 stable or trending lower.
Evaluator Note: This is a continuous action step.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: The evolution is complete.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10 Revision 2
JPM Page 17 of 17 TURNOVER SHEET INITIAL CONDITIONS:
- Unit 1 is in the process of cooling down from hot standby to cold shutdown.
- OP-3C Unit 1, Hot Standby to Cold Shutdown Unit 1 in progress; completed through Step 5.20, ready to place RHR in operation.
- RCS temperature is approximately 340 °F.
- RCS pressure is approximately 300 psig.
- Pressurizer level suddenly begins to lower.
INITIATING CUES (IF APPLICABLE):
- The OS1 directs you to respond to the loss of pressurizer level in accordance with SEP-2 Unit 1, Shutdown LOCA Analysis.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10 Revision 2
JPM JOB PERFORMANCE MEASURE Page 1 of 15 JPM TITLE: RAISE STEAM GENERATOR WATER LEVEL USING AUXILIARY FEEDWATER JPM NUMBER: PBN JPM P061.007A.COT REV. 1 TASK NUMBER(S) / PBN P061.007.COT / RAISE STEAM GENERATOR WATER TASK TITLE(S): LEVEL USING AUXILIARY FEEDWATER K/A NUMBERS: 061.A2.05 K/A VALUE: 3.1/3.4 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 15 Minutes Time Critical: No Alternate Path [NRC]: Yes Alternate Path [INPO]: Yes Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 6 of 15 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- P-38A SSG Feed Pump is OOS for maintenance.
- Unit 1 is in Mode 5, Cold Shutdown.
- Chemistry requests that Steam Generator A level be raised to support performing a S/G bleed and feed.
- A flow rate of 150 to 200 gpm is desired when raising level.
- Starting duty limitations for 1P-53, Motor Driven Auxiliary Feedwater Pump, are met.
- The 4th License will monitor pump bearing temperatures on 1TR-2000B.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to raise Unit 1 Steam Generator A level to 90-95% NR in accordance with 1-SOP-AF-001, Auxiliary Feedwater System Operation - Motor Driven, Section 5.3.
- All applicable Initial Conditions in Section 4.0 are met.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 7 of 15 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Unit 1 in Mode 5, 6 or DEFUELED Critical N Standard: The Examinee signs off step per information given in turnover.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 Align the SG to receive water:
Critical N a. Ensure vent path available for Steam Generator(s) to be filled.
- b. UPDATE CL 1E, Containment Closure Checklist Unit 1.
Standard: The Examinee aligns vent path and verifies CL 1E updated.
Evaluator Cue: If asked, the OS directs examinee to use 1MS-2016, A S/G Atmospheric for a vent path.
If asked, the OS informs examinee CL 1E will be updated by the 4th license for the Unit 1 a S/G Atmospheric.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 8 of 15 Performance Step: 3 START 1P-53, Motor-Driven Aux Feed Pump (1C03).
Critical Y
- RECORD start time.
Standard: The Examinee places the control switch for 1P-53 to the Start position and records time.
Evaluator Note: Time recording is not critical for this step.
Evaluator Cue: If asked, the AO reports normal pre-start checks for 1P-53.
If asked the AO reports normal post-start of 1P-53.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 CHECK AFP recirc valves are OPEN.
Critical N
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 9 of 15 Performance Step: 5 SELECT and PLACE required flow indicator controller(s) to MANUAL:
Critical Y (N/A if not selected)
- 1AF-4074B, 1P-53 AFP to HX-1B Flow Control Standard: The Examinee places the controller 1AF-4074A to MANUAL and N/As 1AF-4074B.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 SELECT and ADJUST AFW flow to obtain desired fill rate to selected Critical N Steam Generators: (N/A if not selected)
- 1AF-4074B, 1P-53 AFP to HX-1B Flow Control Standard: The Examinee adjusts controller 1AF-4074A to obtain 150-200 GPM feed flow and N/As 1AF-4074B.
Evaluator Note: Ensure TRIGGER 11 inserted after AFW flow was raised to greater than 150 gpm. This will cause annunciator C01 A 4-9, Aux Feed Pump Suction Pressure Low and 1C03 1D 1-8, 1P-53 Low Suction Pressure Trip to actuate Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 10 of 15 Performance Step: 7 At 1C03 MONITOR 1P-53, Unit 1 Aux Feedwater Motor-driven Pump, Critical N for proper operation:
Standard: The Examinee will monitor 1P-53 parameters trying to adjust flow to establish a flow rate of 150-200 gpm as specified in the Initiating Cue.
Evaluator Cue: Inform Examinee that the 4th License will monitor bearing temperatures on 1TR-2000B (recorder is on a back panel) AND check PPCS Data.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 DISPATCH AO to locally MONITOR 1P-53, AFW Motor-driven Pump Critical N for proper operation.
Standard: The Examinee informs AO to monitor pump locally.
Evaluator Cue: All indications are normal (noise, packing leakage, oil levels) and step is SAT per AO.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 11 of 15 Performance Step: 9 At 1C03 MONITOR 1P-53, Unit 1 Aux Feedwater Motor-driven Critical N Pump, for proper operation:
Standard: The Examinee acknowledges and references ARP C01 A 4-9, Aux Feed Pump Suction Pressure Low Evaluator Note: If the examinee references ARP 1C03 1D 1-8 first, go to Step 11 Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 ARP C01 A 4-9 Aux Feed Pump Suction Pressure Low Critical N 3.1 Check Condensate Storage Tank Level 3.2 Determine which Aux Feedwater Pump caused the alarm 3.3 Check Technical Specification requirements, Section 3.7.6 Standard: The Examinee 1 Checks CST level satisfactory 2 Determines 1P-53 is the cause of the alarm 3 Informs OS1 to check Technical Specification requirements, Section 3.7.6 Evaluator Cue: If informed to check tech specs, acknowledge.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 12 of 15 Performance Step: 11 At 1C03 MONITOR 1P-53, Unit 1 Aux Feedwater Motor-driven Critical N Pump, for proper operation:
Standard: The Examinee acknowledges and references ARP 1C03 1D 1-8, 1P-53 Low Suction Pressure Trip Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 12 ARP 1C03 1D 1-8, 1P-53 Low Suction Pressure Trip Critical Y 3.1 Ensure 1P-53 is NOT running Standard: The Examinee stops 1P-53 Evaluator Cue: If asked for a prompt from OS1 to secure 1P-53, instruct the Examinee to follow the directions contained in the ARP.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P061.007ACOT, Raise Steam Generator Water JPM Level Using Auxiliary Feedwater, Rev. 1 Page 13 of 15 Performance Step: 13 Inform the OS1 of present plant conditions.
Critical N Standard: The Examinee informs the OS1 that:
- 1P-53 MDAFP experienced a low suction pressure condition and was secured.
Evaluator Cue: OS1 acknowledges your report.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: The JPM is complete.
Stop Time:
TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 15 of 15 TURNOVER SHEET INITIAL CONDITIONS:
- P-38A SSG Feed Pump is OOS for maintenance.
- Unit 1 is in Mode 5, Cold Shutdown.
- Chemistry requests that Steam Generator "A" level be raised to support performing a S/G bleed and feed.
- A flow rate of 150 to 200 gpm is desired when raising level.
- All applicable Initial Conditions in Section 4.0 are met.
- Starting duty limitations for 1P-53, Motor Driven Auxiliary Feedwater Pump, are met.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to raise Unit 1 "A" steam generator level to 90-95% NR in accordance with 1-SOP-AF-001, Auxiliary Feedwater System Operation - Motor Driven, Section 5.3.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
JPM JOB PERFORMANCE MEASURE Page 1 of 17 JPM TITLE: Align Containment Spray Pump for Containment Sump Recirculation with Suction Supplied by the RHR Pump JPM NUMBER: PBN JPM P000.055a.COT REV. 1 TASK NUMBER(S) / PBN P000.055.COT / Transfer to Sump Recirculation TASK TITLE(S):
026 K4.01 4.2 / 4.3 K/A NUMBERS: K/A VALUE:
026 A4.01 4.5 / 4.3 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: Yes Alternate Path [NRC]: Yes Alternate Path [INPO]: Yes TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 6 of 17 Supplied by the RHR Pump, Rev. 1 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- You are the Balance of Plant Operator.
- A large break LOCA has occurred on Unit 1.
- EOP actions up to step 33, Align Containment Spray for Recirculation, of EOP-1.3, Transfer to Containment Sump Recirculation - Low Head Injection, are complete.
- Containment Spray Pumps have just been placed in PULL OUT per EOP-1.3 foldout page criteria.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to align Train A of Containment Spray for Sump Recirculation per EOP-1.3 Attachment B, Containment Spray Lineup for Sump Recirculation - Two Trains of RHR.
NOTE: THIS JPM IS TIME CRITICAL.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 7 of 17 Supplied by the RHR Pump, Rev. 1 JPM PERFORMANCE INFORMATION Start Time: Evaluator! - Ensure JPM Start Time is documented.
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
EVALUATOR NOTE: This JPM is Time Critical.
Ensure the JPM Start Time AND the Containment Spray Pump Start Time is documented.
Performance Step: 1 B1 Check if Containment Spray should be Aligned for Recirculation:
Critical N a. RWST level - LESS THAN 17%
- b. One RHR train - AVAILABLE FOR CONTAINMENT SPRAY RECIRCULATION
- RHR pump - ONE RUNNING ON RECIRCULATION
- RHR pump - ONE NOT RUNNING AND AVAILABLE Standard: The examinee verifies:
- RWST level is less than 17%
- ' A'RHR train is available for Containment Spray Recirculation Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 8 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 2 B2 Verify Containment Spray has been Stopped:
Critical Y a. Ensure containment spray signal - RESET
- b. Ensure both containment spray pumps - IN PULL OUT
- c. Ensure both containment spray pump RWST suction MOVs - SHUT
- d. Ensure both spray additive eductor suction valves - SHUT
- 1SI-836B The examinee:
- a. Ensures the Containment Spray signal is RESET
- b. Verifies BOTH Unit 1 Containment Spray Pumps are in PULL OUT Standard: c. Shuts both 1SI-870A and 1SI-870B MOVs. (1SI-870A is CRITICAL)
- d. Ensures both 1SI-836A and 1SI-836B, spray eductor valves are shut Evaluator Note: Steps B2 a, b, and d are NOT critical.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 9 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 3 B3 Determine Train of Containment Spray to Place on Recirculation:
Critical Y a. Check containment spray train - SAME TRAIN AVAILABLE AS AVAILABLE RHR PUMP TRAIN
- b. Ensure containment spray discharge valves for selected train aligned as follows:
Train A
- 1SI-860A - SHUT
- 1SI-860B - OPEN Train B
- 1SI-860C - SHUT
- 1SI-860D - OPEN Standard: The examinee:
- a. Verifies Train A of containment spray is AVAILABLE
- b. Aligns Train A spray discharge MOVs (selected Train):
- 1SI-860A - SHUT (CRITICAL)
- 1SI-860B - OPEN Evaluator Cue: If asked, A is preferred per the NOTE.
Evaluator Note: Step B3 a. is NOT critical.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 10 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 4 B4 Ensure Following Pumps for Selected Train are Stopped and Critical N Place in PULL OUT:
- a. SI Pump
- b. RHR Pump Standard: The examinee verifies '
A'Train ECCS pumps in PULL OUT.
- a. 1P-15A - PULL OUT
- b. 1P-10A - PULL OUT Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 5 B5 Open Containment Spray Pump RHR Suction MOV for selected Critical Y Train:
- a. 1SI-871A, Train A
- b. 1SI-871B, Train B Standard: The examinee OPENS 1SI-871A, Containment Spray Pump suction from RHR Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 6 B6 Shut RHR Heat Exchanger Outlet to SI Pump Suction Valve for Critical N Selected Train:
- a. 1SI-857A, Train A
- b. 1SI-857B, Train B Standard: The examinee verifies 1SI-857A, RHR HX Outlet to SI Pump Suction MOV is SHUT.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 11 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 7 B7 Establish Containment Spray on Recirculation:
Critical Y a. Momentarily place selected train RV Injection MOV to the SHUT position: (amber light ON)
- 1SI-852A, Train A
- 1SI-852B, Train B
- b. Start RHR pump for selected Train:
- 1P-10A, Train A
- 1P-10B, Train B
- c. Start containment spray pump for Selected Train:
- 1P-14A, Train A
- 1P-14B, Train B Standard: The examinee:
- a. Sets 1SI-852A to its pre-throttled position (amber light ON) -
CRITICAL
- c. Starts 1P-14A, Containment Spray Pump - CRITICAL Spray Pump Start Time: _____________.
Evaluator! - Record the time the Spray Pump is started.
The maximum allowed time from JPM Start to the Spray Pump Start Evaluator Note: is 20 min.
_______________ - ____________ = _____________ (must be
<20 min.)
(1P-14A Start Time) - (JPM Start Time) = Total Elapsed Time Reference OM 4.3.8, Attachment B-5 Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 12 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 8 B8 Momentarily place opposite train RV Injection MOV to the SHUT Critical N position: (amber light ON)
- a. 1SI-852A, Train A
- b. 1SI-852B, Train B Standard: The examinee attempts to set 1SI-852B to its pre-determined throttle position (amber light ON) by momentarily taking the switch to CLOSE then release.
Evaluator Note: A conditional trigger should go ACTIVE when the examinee takes the 1SI-852B Control Switch to CLOSE that causes control power to be lost to 1SI-852B. All valve position indications will be lost. The examinee should implement the RNO actions.
Evaluator Cue: If the examinee asks for a local report on 1SI-852B breaker status, provide the cue that "Local report is: 1B52-421F, 1SI-852B supply breaker has a burnt smell, otherwise appears normal."
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 9 B8 RNO: Throttle opposite train RHR heat exchanger outlet flow Critical Y control valve to establish maximum RHR pump flow less than 1550 gpm:
Train A
- Valve - 1RH-624
- Valve - 1RH-625
- Flow - 1FI-928 + 1FI-963 Standard: The examinee throttles 1RH-625, RHR HX Outlet Flow Control Valve to establish maximum RHR flow less than 1550 gpm.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.055a.COT, Align Containment Spray Pump for Containment Sump Recirculation with Suction JPM Page 13 of 17 Supplied by the RHR Pump, Rev. 1 Performance Step: 10 B9 Record the time Containment Spray is placed on Recirculation.
Critical N Time: _____________
Standard: The examinee records the time.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Performance Step: 11 B10 Return To Procedure And Step In Effect.
Critical N Standard: The examinee reports to OS1 that '
A'Train of Containment Spray is on Sump Recirculation.
Evaluator Cue: OS1 acknowledges your report.
Performance: SATISFACTORY UNSATISFACTORY Comments: ______________________________________________________
Terminating Cues: JPM is complete NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10, Revision 2
JPM JOB PERFORMANCE MEASURE Page 15 of 17 TURNOVER SHEET INITIAL CONDITIONS:
- You are the Balance of Plant Operator.
- A large break LOCA has occurred on Unit 1.
- EOP actions up to step 33, Align Containment Spray for Recirculation, of EOP-1.3, Transfer to Containment Sump Recirculation - Low Head Injection, are complete.
- Containment Spray Pumps have just been placed in PULL OUT per EOP-1.3 foldout page criteria.
INITIATING CUES (IF APPLICABLE):
- OS1 directs you to align Train A of Containment Spray for Sump Recirculation per EOP-1.3 Attachment B, Containment Spray Lineup for Sump Recirculation - Two Trains of RHR.
NOTE: THIS JPM IS TIME CRITICAL.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
JPM JOB PERFORMANCE MEASURE Page 1 of 12 JPM TITLE: Transfer an Instrument Bus JPM NUMBER: PBN JPM P062.011.COT REV. 6 TASK NUMBER(S) / P062.011.COT / Transfer an instrument Bus TASK TITLE(S):
K/A NUMBERS: 062 A2.10 K/A VALUE: 3.0/3.3 Justification (FOR K/A VALUES <3.0): N/A TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 15 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 5 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 1 is at 100% steady-state conditions.
- Maintenance is required on inverter 1DY-01.
- The Unit 1 Auxiliary Operator has completed the field portion of shifting 1Y-101 to DY-0A in accordance with 1-SOP-Y-001, Shifting 120V RPS/Safeguards Instrument Buses.
- No analog or trip testing for reactor protection and safeguards instrumentation is in progress.
- 1-SOP-Y-001 has been completed through Step 5.1.8.
- Control rods are in manual per 1-SOP-Y-001 Step 5.1.1.d INITIATING CUES (IF APPLICABLE):
- OS1 directs you to complete the shifting of instrument bus 1Y-01 to inverter DY-0A in accordance with 1-SOP-Y-001, Shifting 120V RPS/Safeguards Instrument Buses, beginning at Step 5.1.9.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 6 of 12 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Perform the following at 1TB-215, 1-43/Y-01 TRANSFER SWITCH Critical N BOX (Control Room)
- a. ENSURE the indicating light for the desired source is ON.
Standard: The Examinee checks that the amber indicating light for the desired source, DY-0A is on.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 7 of 12 Performance Step: 2 Perform the following at 1TB-215, 1-43/Y-01 TRANSFER SWITCH Critical N TERMINAL BOX (Control Room)
- b. MONITOR the phase voltage difference between the running and oncoming inverters.
Standard: The Examinee monitors the phase voltage difference between the running and oncoming inverters.
Evaluator Note: The Examinee may depress the meter TEST pushbutton to verify the meter is functioning (moving).
Evaluator Cue: The meter is accurate; use of a more accurate voltmeter is not required (If asked).
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Perform the following at 1TB-215, 1-43/Y-01 TRANSFER SWITCH Critical Y TERMINAL BOX (Control Room)
- c. WHEN the phase voltage differential is acceptable, THEN PLACE 1-43/Y-01, 1Y-01 RED 120VAC VITAL INSTRUMENT PANEL POWER SUPPLY TRANSFER SWITCH, to either:
- DY-0A, ALTERNATE INVERTER Standard: The Examinee places the 1-43/Y-01, 1Y-01 RED 120VAC VITAL INSTRUMENT PANEL POWER SUPPLY TRANSFER SWITCH to the DY-0A, alternate inverter position.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 8 of 12 Performance Step: 4 IF Inverter DY-0A is supplying 1Y-01, THEN INSTALL the Critical Y magnetic administrative control tags on 2TB-215, 2-43/Y-01 Transfer Switch Terminal Box Standard: Installs magnetic administrative control tags on 2TB-215, 2-43/Y-01 Transfer Switch Terminal Box since DY-0A is supplying 1Y-01 Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 5 IF Inverter DY-0A is NOT supplying 1Y-01, THEN REMOVE the Critical N magnetic administrative control tags from 2TB-215, 2-43/Y-01 Transfer Switch Terminal Box Standard: Determines step is N/A since DY-0A is supplying 1Y-01.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 ENSURE Instrument Bus 1Y-01 voltage is 115-125 vac on 1Y Critical N VM, BUS VOLTMETER, (on 2C20).
Standard: The Examinee ensures instrument bus 1Y-01 voltage is 115-125 vac on 1Y-01-VM, bus voltmeter on 2C20.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 9 of 12 Performance Step: 7 CHECK control boards for normal conditions.
Critical N Standard: The Examinee checks the control boards for normal conditions.
Evaluator Cue: As OS1 report that C01 has performed control board checks and conditions are satisfactory.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 IF the Inverter now supplying the bus has transferred to the Critical N alternate source, (INVERTER TROUBLE ANNUNCIATOR on 2C20 is in ALARM), THEN:
- a. DECLARE the inverter INOPERABLE AND enter Action Condition for TS LCO 3.8.7 or 3.8.8.
- b. DEPRESS the INVERTER TO LOAD pushbutton on the inverter.
- c. ENSURE the Inverter transfers to INVERTER SUPPLYING LOAD.
- e. CHECK control boards for normal conditions.
Standard: The Examinee checks the INVERTER TROUBLE ANNUNCIATOR on 2C20 not lit.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P062.011.COT, Transfer an Instrument Bus, JPM Rev. 6 Page 10 of 12 Performance Step: 9 PLACE the Unit 1 Rod Control Selector Switch in the as found Critical Y position recorded in Step 5.1.1 Standard: Unit 1 rod selector switch returned to auto Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 Inform OS1 that you have completed the Control Room portion of Critical N shifting instrument bus 1Y01 to inverter DY-0A in accordance with 1-SOP-Y- 001, Shifting 120V RPS/Safeguards Instrument Buses Standard: The Examinee informs OS1 that he has completed the Control Room portion of shifting instrument bus 1Y01 to inverter DY-0A in accordance with 1-SOP-Y-001, Shifting 120V RPS/Safeguards Instrument Buses Evaluator Cue: Acknowledge the report.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues: That completes this JPM.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10, Revision 2
JPM JOB PERFORMANCE MEASURE Page 12 of 12 TURNOVER SHEET INITIAL CONDITIONS:
- Unit 1 is at 100% steady-state conditions.
- Maintenance is required on inverter 1DY-01.
- The Unit 1 Auxiliary Operator has completed the field portion of shifting 1Y-101 to DY-0A in accordance with 1-SOP-Y-001, Shifting 120V RPS/Safeguards Instrument Buses.
- No analog or trip testing for reactor protection and safeguards instrumentation is in progress.
- 1-SOP-Y-001 has been completed through Step 5.1.8.
- Control rods are in manual per 1-SOP-Y-001 Step 5.1.1.d INITIATING CUES (IF APPLICABLE):
- OS1 directs you to complete the shifting of instrument bus 1Y-01 to inverter DY-0A in accordance with 1-SOP-Y-001, Shifting 120V RPS/Safeguards Instrument Buses, beginning at Step 5.1.9.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 12 JPM TITLE: RESTORE PT-431 TO SERVICE JPM NUMBER: PBN JPM P012.001c.COT REV. 3 TASK NUMBER(S) / P012.001c.COT TASK TITLE(S): Place Reactor Protection Channels in the Tripped Condition K/A NUMBERS: 012 A4.04 K/A VALUE: 3.3/3.3 Justification (FOR K/A VALUES <3.0):
TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 15 Minutes Time Critical: No Alternate Path [NRC]: No Alternate Path [INPO]: No Developed by: Jeffrey Hinze Instructor/Developer Date Reviewed by: Andrew Zommers Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 5 of 12 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- 1PT-431 BLUE Pressurizer Pressure Instrument was removed from service for repairs per 0-SOP-IC-001 BLUE, ROUTINE MAINTENANCE PROCEDURE REMOVAL OF SAFEGUARDS OR PROTECTION SENSOR FROM SERVICE - BLUE CHANNELS.
- You are the 4th License on shift.
- Operator at the controls will acknowledge any alarms.
INITIATING CUES:
- OS1 has directed you to return 1PT-431 to service per 0-SOP-IC-001 BLUE, ROUTINE MAINTENANCE PROCEDURE REMOVAL OF SAFEGUARDS OR PROTECTION SENSOR FROM SERVICE - BLUE CHANNELS and establish AUTO operation of related components.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 6 of 12 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 In cabinet C-116, place the following bistable trip switches to Critical Y NORMAL (toggle switch down) AND check expected response.
- Overtemperature Trip
- Overtemperature Rod Stop
- High Pressure Trip
- Low Pressure Trip
Evaluator Note: Checking expected responses is NOT critical.
Restoring each bistable is a critical step.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 7 of 12 Performance Step: 2 Place RC-430, Pressurizer PORV in the CLOSE position.
Critical N Standard: RC-430 PORV control switch to CLOSE.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 3 Place RC-431C, Pressurizer PORV in the CLOSE position.
Critical N Standard: RC-431C PORV control switch to CLOSE.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 Place HC-431K, Pressurizer pressure controller in MANUAL.
Critical N Standard: Balance HC-431K Pressurizer Pressure controller to get a bumpless transfer when placing in MANUAL.
Evaluator Cue: If asked, the OATC will monitor Pressurizer Pressure Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 8 of 12 Performance Step: 5 In cabinet C-110, place the Pressurizer Pressure Defeat Switch Critical Y P/429A to OPERATE (429 CH I/449 CH IV).
Standard: Pressurizer Pressure defeat switch selected to OPERATE.
Evaluator Note: If asked, inform examinee another operator will stay and monitor pressurizer pressure while examinee goes behind the boards.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 Place HC-431K, Pressurizer pressure controller in AUTO unless Critical Y otherwise directed by Shift Manager.
Standard: HC-431K Pressurizer Pressure controller to AUTO.
Evaluator Note: If asked, Shift Manager directs placing HC-431K in AUTO.
Critical step if repositioned to MANUAL earlier in JPM.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 9 of 12 Performance Step: 7 Place RC-431C, Pressurizer PORV in the AUTO unless otherwise Critical Y directed by Shift Manager.
Standard: RC-431C PORV in AUTO.
Evaluator Note: If asked, Shift Manager directs placing RC-431C in AUTO Critical step if repositioned to CLOSE earlier in JPM.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 Place RC-430, Pressurizer PORV in the AUTO unless otherwise Critical Y directed by Shift Manager.
Standard: RC-430 PORV in AUTO.
Evaluator Note: If asked, Shift Manager directs placing RC-430 in AUTO Critical step if repositioned to CLOSE earlier in JPM.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 9 Return to scan PPCS point ID PT431, PZR P 3 BLU.
Critical N Standard: 1PT-431 returned to SCAN.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
JPM PBN JPM P012.001c.COT, Restore PT-431 to Service, Rev. 3 Page 10 of 12 Performance Step: 10 Inform OS1 of plant status Critical N Standard: Examinee reports that 1PT-431 has been returned to service per 0-SOP-IC-001 BLUE.
Evaluator Cue: OS1 acknowledges report Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10, Revision 2
Job Performance Measure JPM Page 12 of 12 TURNOVER SHEET INITIAL CONDITIONS:
- 1PT-431 BLUE Pressurizer Pressure Instrument was removed from service for repairs per 0-SOP-IC-001 BLUE, ROUTINE MAINTENANCE PROCEDURE REMOVAL OF SAFEGUARDS OR PROTECTION SENSOR FROM SERVICE - BLUE CHANNELS.
- You are the 4th License on shift.
- Operator at the controls will acknowledge any alarms.
INITIATING CUES:
- OS1 has directed you to return 1PT-431 to service per 0-SOP-IC-001 BLUE, ROUTINE MAINTENANCE PROCEDURE REMOVAL OF SAFEGUARDS OR PROTECTION SENSOR FROM SERVICE - BLUE CHANNELS and establish AUTO operation of related components.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
JOB PERFORMANCE MEASURE JPM Page 1 of 18 JPM TITLE: Respond to Circulating Water Malfunction JPM NUMBER: PBN JPM P000.052.COT REV. 0 TASK NUMBER(S) / PBN P000.052.COT Respond to Circulating Water System Malfunctions TASK TITLE(S):
K/A NUMBERS: 075.A2.02 K/A VALUE: 2.5/2.7 Justification (FOR K/A VALUES <3.0): JPM to be used for ILT Exam TASK APPLICABILITY:
RO SRO STA Non-Lic SRO CERT OTHER:
APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:
Simulator: X Other:
Lab:
Time for Completion: 20 Minutes Time Critical: NO Alternate Path [NRC]: YES Alternate Path [INPO]: YES Developed by: Andrew Zommers Instructor/Developer Date Reviewed by: Jeffrey Hinze Instructor (Instructional Review) Date Validated by: Jeff Baugniet SME (Technical Review) Date Approved by: Randy Amundson Training Supervision Date Approved by: Tom Larson Training Program Owner Date TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 5 of 18 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
- Unit 2 is on Ice Melt per OI 38, Circulating Water System Operations
- 2CW-1 Ice Melt Valve is 100% Open
- 2CW-3 Seal Well Outlet Valve is Closed
- Due to lowering circulating water temperatures and Forebay/Pumpbay level alarms, AOP 13A Circulating Water System Malfunction was entered by OS1 INITIATING CUES (IF APPLICABLE):
- OS1 Directs you to start implementing AOP 13A, starting with Step 1, while he starts making notifications.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 6 of 18 JPM PERFORMANCE INFORMATION Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1 Review Cautions, Notes and Foldout Page information Critical N Standard: Examinee reviews cautions, notes and foldout page prior step 1.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 2 1. Circulating Water System - INTACT Critical N Standard: Verify Circ Water System Intact, no turbine hall alarms lit in Control.
Evaluator Cue: No reports from the field of pipe ruptures.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 7 of 18 Performance Step: 3 2. Check Circulating Water Pumps - ONLY ONE RUNNING PER UNIT Critical N
- 1P-30A or B
- 2P-30A or B Standard: Examinee verifies only one Circulating Pump running per unit.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 4 3. Check Forebay Level - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies Forebay Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 8 of 18 Performance Step: 5 4. Check Forebay Level - GREATER THAN -13 FEET Critical N
- YR-5832 Standard: Examinee verifies Forebay Level > -13 ft.
Evaluator Note: Enter the malfunction required to lower Forebay and Pump bay levels.
This will cause the following annunciators to actuate C01A 4-5, Traveling Screen Differential Level High C01A 4-6, Traveling Screen Start Failure The Examinee may address these ARBs, no actions are expected to be taken due to those ABRs.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 6 5. Check South Pumpbay Level - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies South Pumpbay Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 9 of 18 Performance Step: 7 6. Check North Pumpbay Level - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies North Pumpbay Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 8 7. Check Level in Both Pumpbays - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies Both Pumpbays Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 10 of 18 Performance Step: 9 8. Check Forebay AND BOTH Pumpbay Levels - GREATER THAN -11.5 Critical N FEET
- YR-5832 Standard: Examinee verifies Forebay AND BOTH Pumpbays Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 10 9. Check at Least One Unit At Power Critical N Standard: Examinee verifies both units are at power.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 11 10. Stop Liquid Discharges Critical N Standard: Examinee determines no discharges need to be stopped.
Evaluator Cue: When asked, there are no discharges currently in progress.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 11 of 18 Performance Step: 12 11. Check Any Unit Aligned For Ice Melt Operation Critical N Standard: Examinee determines Unit 2 aligned for ice melt operations.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 13 12. Check Circulating Water Inlet Temperature - Greater Than 38ºF Critical N
- YR-5832 Standard: Examinee determines temperature is below 38ºF and transitions to RNO.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 14 12. RNO Raise intake crib temperature Critical N
- Fully open ice melt valve - CW-1
- Throttle seal well outlet valve to establish intake temperature greater than 38ºF - CW-3 Standard: Examinee notes CW-1 is fully open and CW-3 is fully closed.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 12 of 18 Performance Step: 15 Foldout Page monitored to determine Forebay or Pump Bay levels less than -
Critical N 11.5 feet Standard: Examinee determines Forebay and/or Pump Bay level < -11.5 feet and returns back to Step 1 Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 16 1. Circulating Water System - INTACT Critical N Standard: Verify Circ Water System Intact, no turbine hall sump alarms in Control.
Evaluator Cue: No reports from the field of pipe ruptures.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 17 2. Check Circulating Water Pumps - ONLY ONE RUNNING PER UNIT Critical N
- 1P-30A or B
- 2P-30A or B Standard: Examinee verifies only one Circulating Pump running per unit Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 13 of 18 Performance Step: 18 3. Check Forebay Level - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies Forebay Level > -11.5 ft.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 19 4. Check Forebay Level - GREATER THAN -13 FEET Critical N
- YR-5832 Standard: Examinee verifies Forebay Level > -13 ft Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 14 of 18 Performance Step: 20 5. Check South Pumpbay Level - GREATER THAN -11.5 FEET Critical N
- YR-5832 Standard: Examinee verifies Forebay Level is less than -11.5 ft and goes to the RNO Evaluator Note: Only RNO steps requiring actions are contained in the following steps.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 21 Step 5 RNO Critical N Perform the following:
- a. Enter TRM TLCO 3.7.7 action condition B for both units.
- b. Enter TS LCO 3.6.6 action condition C for both units.
Standard: The Examinee inform the OS of the need to enter TRM TLCO 3.7.7 action condition B for both units and, TS LCO 3.6.6 action condition C for both units.
Evaluator Cue: If directed, acknowledge the need to enter TRM TLCO 3.7.7 action condition B for both units and, TS LCO 3.6.6 action condition C for both units.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 15 of 18 Performance Step: 22 Step 5 RNO Critical Y Perform the following:
- e. Trip Unit 1 reactor Standard: Examinee trips Unit 1 reactor Evaluator Cue: If asked, the Examinee is directed to carry out the RNO Actions.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Performance Step: 23 Step 5 RNO Critical Y f. Stabilize plant using EOPs while continuing with this procedure Standard: Examinee performs immediate actions of EOP 0 for Unit 1.
- Reactor Tripped - yes
- Turbine Tripped - yes
- Safeguards Busses Energized - yes from offsite
- Check if SI is required - not required Evaluator Cue: Cue examinee after completion of immediate actions, that they have been verified so continue with AOP-13A actions.
Performance: SATISFACTORY UNSATISFACTORY Comments:
TR-AA-230-1003-F10, Revision 2
PBN JPM P000.052.COT Respond to Circulating Water System JPM Malfunctions, Rev. 0 Page 16 of 18 Performance Step: 23 Step 5 RNO Critical Y g. Shut tripped unit MSIVs
- MS-2018
- MS-2017 Standard: Examinee shuts MSIVs after immediate actions completed.
Performance: SATISFACTORY UNSATISFACTORY Comments:
Terminating Cues:
This Completes the JPM NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
Stop Time:
TR-AA-230-1003-F10, Revision 2
JPM Page 18 of 18 TURNOVER SHEET INITIAL CONDITIONS:
- Unit 2 is on Ice Melt per OI 38, Circulating Water System Operations
- 2CW-1 Ice Melt Valve is 100% Open
- 2CW-3 Seal Well Outlet Valve is Closed
- Due to lowering circulating water temperatures and Forebay/Pumpbay level alarms, AOP 13A Circulating Water System Malfunction was entered by OS1 INITIATING CUES (IF APPLICABLE):
- OS1 Directs you to start implementing AOP 13A, starting with Step 1, while he starts making notifications.
NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.
TR-AA-230-1003-F10, Revision 2