ML15076A521

From kanterella
Jump to navigation Jump to search
2015 Point Beach Nuclear Plant Initial License Examination Form ES-401-6
ML15076A521
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML14328A661 List:
References
50-266/15-301, 50-301/15-301
Download: ML15076A521 (1)


Text

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Point Beach U1 /U2 Date of Exam: February 23, 2015 Exam Level: RO IBJ SRO IBJ Initial Item Description a b* c#

1. Questions and answers are technical! accurate and a licable to the facilit . ~
2. a. NRC K/As are referenced for all questions.
b. Facilit learnin ob'ectives are referenced as available. ~
3. SRO questions are a propriate in accordance with Section D.2.d of ES-401 1L ~
4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensin exams, consult the NRR OL ro ram office).

fL ~

5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

_ the audit exam was systematically and randomly developed; or

_ the audit exam was completed before the license exam was started; or

_ the examinations were developed independently; or

_x the licensee certifies that there is no duplication; or

_other (explain)

6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SRO-only 40 I 10 12 I 6 23 I 9 question distribution(s) at ri ht.
7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly 45% I 32% 55% I 68%

selected K/As support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at ri ht.

8. References/handouts rovided do not ive awa answers or aid in the elimination of distractors.
9. Question content conforms with specific KIA statements in the previously approved examination outline and is a ro riate for the tier to which the are assi ned; deviations are *ustified.

10.

11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.

Date

a. Author
b. Facility Reviewer(*)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Note:
  • The facility reviewer's initials/signature are not applicable for NRG-developed examinations.
  1. Independen t NRC reviewer initial items in Column "c"; chief examiner concurrence required .