Request for Additional Information, License Amendment Request to Change the Reactor Trip System Allowed Outage Time and Surveillance Intervals (TAC Nos. MD8135 & MD8136)
ML082530013
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/10/2008
From: Jervey R A
Plant Licensing Branch II
To: Johnson J R
Southern Nuclear Operating Co
Jervey, Richard 301-415-2728
References
TAC MD8135, TAC MD8136
Download: ML082530013 (4)


Text

September 10, 2008

Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)

Dear Mr. Johnson,

The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter. Sincerely,

/RA/ R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Request for Additional Information

cc w/encl: See next page September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)

Dear Mr. Johnson,

The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter. Sincerely,

/RA/ R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Request for Additional Information cc w/encl: See next page

Distribution

PUBLIC RidsNrrDorlLpl2-1Resource LPL2-1 R/F RidsOgcRpResource RidsNrrLAGLappertResource RidsAcrsAcnw_MailCTRResource RidsNrrPMRJerveyResource RidsRgn2MailCenterResource RidsNrrDorlDprResource RidsNrrDeEicb Accession Number: ML082530013 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME RJervey GLappert MWong DATE 9/9/08 9/9/08 9/10/08 OFFICIAL RECORD COPY

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGE ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVAL EXTENSIONS TAC NOS. MD8135 and MD8136 The license amendment request (LAR) proposes Technical Specification (TS) changes that would revise allowed outage times (AOT), bypass test times, and surveillance test interval (STI) extensions for TS 3.3.1, "Reactor Trip System (RTS) Instrumentation," TS 3.3.2, "Engineered Safety Features Actuation System (ESFAS) Instrumentation," TS 3.3.6, "Containment Purge and Exhaust Isolation Instrumentation," TS 3.3.7, "Control Room Emergency Filtration Pressurization System (CREFS) Actuation Instrumentation," and TS 3.38, "Penetration Room Filtration (PRF) System Actuation Instrumentation." The proposed revisions are based on WCAP-14333-P-A, Revision 1, "Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times," dated October 1998, WCAP-15376-P-A, Revision 1, "Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times," dated March 2003, TSTF-242, Revision 1, "Increase the time to perform a COT on Power Range and Intermediate Range Instruments," and TSTF-246, "RTS Instrumentation, 3.3.1 Condition F Completion Time."

To support the U.S. Nuclear Regulatory Commission's assessment of the acceptability of the LAR in regard to AOT, bypass test times, and STI extensions, please provide the following:

1. The majority of the plant specific responses to WCAP-14333 and WCAP-15376 are included in the proprietary portion of the LAR. Please provide a non-proprietary summary of the plant specific responses to each of the two conditions in the July 15, 1998 safety evaluation for WCAP-14333 and the five conditions in the December 20, 2002 safety evaluation for WCAP-15376.

Joseph M. Farley Nuclear Plant, Units 1 & 2 cc: Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe St. Montgomery, AL 36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.

P.O. Box 470 Ashford, AL 36312