Category:Memoranda
MONTHYEARML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20150A4732020-05-29029 May 2020 EOC Meeting Summary ML19330G0542019-11-22022 November 2019 Reconciliation - Analysis of EDO Response to ACRS Ltr - Response to ACRS Report on the Safety Aspects of the SLR Application of the Turkey Point Nuclear Generating Units 3 & 4 - December 2019 Fc Meeting ML19121A6072019-05-0101 May 2019 Summary of Public Meeting with Turkey Point Nuclear Plant to Discuss Annual Assessment of the Turkey Point Nuclear Plant with Public for Period of January 1, 2018 - December 31, 2018 ML18360A4452018-12-26026 December 2018 06/18/18 Summary of Interagency Meeting Related to Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML18221A2652018-08-0909 August 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board Panel ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval ML18187A0332016-07-19019 July 2016 County Resolution to Seek a Commitment from FPL to Discontinue Use of the Cooling Canal System at the Turkey Point Power Plant ML16097A1402016-04-0404 April 2016 March 30, 2016, Summary of Public Meeting Turkey Point Nuclear Plant ML23333A0162016-03-0707 March 2016 Att H - MDC Report on Biscayne Bay Wq at Turkey Point CCS (March 4, 2016)-1 ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML1117101092011-06-22022 June 2011 Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation ML11160A0482011-06-10010 June 2011 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss Turkey Point Extended Power Uprate License Amendment Request Currently Under Review ML1107405982011-03-16016 March 2011 Notice of Forthcoming Meeting with Florida Power & Light, Turkey Point, Units 3 & 4, to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review ML1106104272011-03-0707 March 2011 Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions ML1031205002010-11-10010 November 2010 Notice of Forthcoming Teleconference with Florida Power & Light to Discuss Differences Between the Turkey Point Spent Fuel Pool Criticality Analysis License Amendment Request Currently Under Review & Draft Division of Safety Systems Interim ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair ML1030100892010-11-0505 November 2010 Verbal Authorization of Relief Request No. 8, Transfer Canal Drain Line Piping Repairs ML1025601362010-09-0707 September 2010 Notice of Meeting with Florida Power & Light Company to Discuss the Florida Power & Light Company'S Forthcoming Applications for the Extended Power Uprates of St. Lucie Units 1 & 2 and Turkey Point Units 3 & 4, Focusing on the Topic of Spen ML1019405202010-07-14014 July 2010 Notice of Conference Call with Florida Power and Light Company to Discuss Draft Responses to NRC Requests for Additional Information for Generic Letter 2004-02 ML1018806202010-07-0808 July 2010 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss with Representatives of Florida Power & Light Company (FPL) the Turkey Point, Units 3 and 4 Proposed Extended Power Uprate License Amendment Request ML1016704282010-06-17017 June 2010 Meeting Summary Notice ML1014501902010-05-26026 May 2010 Notice of Meeting with Florida Power & Light to Discuss the Turkey Point Alternative Source Term License Amendment Request That Is Currently Under Review ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1001900112010-01-19019 January 2010 Notice of Conference Call with Florida Power & Light Concerning Turkey Point Generic Letter 2004-02 Response ML1000800922010-01-0808 January 2010 Notice of Meeting with Florida Power & Light - Turkey Point Units 3 and 4, to Discuss Proposed License Amendment Request to Update Turkey Point Unit 3 Spent Fuel Pool Licensing Basis ML0934911442009-12-16016 December 2009 Summary of Category 2 Public Meeting with Nuclear Energy Institute to Discuss Health Physics Issues for New Reactors ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0921805182009-08-0606 August 2009 Notice of Public Meeting with Florida Power & Light Energy IR 05000250/20090032009-07-30030 July 2009 IR 05000250-09-003, 05000251-09-003, on 04/01/2009 - 06/30/2009; Turkey Point Nuclear Power Plant, Units 3 and 4; Equipment Alignment, Fire Protection, Maintenance Effectiveness, Plant Modifications, Refueling and Other Outage Activities ML0910302212009-04-13013 April 2009 Meeting Notice, Meeting with Florida Power & Light Company Turkey Point Nuclear Plant, Units 3 and 4 ML0832502332008-12-0202 December 2008 Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0614505922006-05-26026 May 2006 Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report ML0518904892005-07-14014 July 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0506300702005-03-0202 March 2005 January Monthly Report on the Status of Open TIAs Assigned to NRR 2023-06-15
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 November 5, 2010 MEMORANDUM TO: Douglas A. Broaddus, Chief Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Regulation i i Jason C. Paige, Project Manager Plant Licensing Branch 11-2 ' '" Division of Operating Reactor Office of Nuclear Reactor Regulation TURKEY POINT UNIT 3 -VERBAL AUTHORIZATION OF RELIEF REQUEST NO.8, TRANSFER CANAL DRAIN LINE PIPING REPAIRS (TAC NO. ME4901) .By letter dated October 21, 2010, Florida Power and Light (FPL), the licensee for Turkey Point Unit 3, submitted Relief Request No.8, Transfer Canal Drain Line Piping Repairs. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a, FPL requested Nuclear Regulatory Commission (NRC) approval of an alternative to the requirements of IWA-4000, "Repair/Replacement Activities," of the American Society of Mechanical Engineers (ASME) Code,Section XI. The relief request is related to the delayed repair of a non-isolable through-wall flaw on the spent fuel pool transfer canal drain piping at Turkey Point Unit 3. The licensee proposed to use the alternative in ASME Code Case N-513-2 for the repair of the degraded transfer channel drain piping. Code Case N-513-2 requires that repair or replacement be performed no later than when the predicted flaw size exceeds the acceptance criteria or the next scheduled outage, whichever occurs first. However, the licensee requested modification to Code Case N-513-2 to defer the repair from the current refueling outage because the subject piping is needed to be operable during the refueling outage. The licensee proposed to complete the Code repair by December 31,2010. The NRC staff reviewed the licensee's submittal and determined that the proposed alternative will provide an acceptable level of quality and safety. During a conference call with the licensee on October 27, 2010, the NRC staff granted a verbal authorization on the use of Relief Request NO.8 in accordance with 10 CFR 5.55a(g)(6)(i).
The script for the verbal authorization is enclosed.
NRC Licensee Participants:
D.
B. Tomonto T. P. Barnes J. A. Dunstan J. S. Mihalakea Docket No. 50-250
Enclosure:
Verbal Authorization Script VERBAL AUTHORIZATION FOR RELIEF REQUEST NO.8 REPAIR OF SPENT FUEL POOL TRANSFER CANAL DRAIN PIPING TURKEY POINT UNIT 3 By letter dated October 21, 2010, Florida Power and Light Company submitted Relief Request No.8 for Nuclear Regulatory Commission (NRC) review and approval for an alternative to the requirements of IWA-4000, "Repair/Replacement Activities," of the American Society of Mechanical Engineers (ASME) Code,Section XI. The relief request is related to the delayed repair of a non-isolable through-wall flaw on the spent fuel pool transfer canal drain piping at Turkey Point Unit 3. The licensee proposed to use the alternative in ASME Code Case N-513-2 for the repair of the degraded transfer canal drain piping. However, the licensee requested modification to Code Case N-513-2 to defer the repair from the current refueling outage because the subject piping is needed to be operable during the refueling outage. The licensee proposed to complete the Code repair by December 31, 2010. On October 27,2010, the NRC staff held a teleconference with the licensee to obtain clarification on the technical basis of the proposed relief request. The NRC staff finds that it is more appropriate to review the relief request under the impracticality basis of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(6)(i) in lieu of under the level-of-quality-and-safety basis of 10 CFR 50.55a(a)(3)(i).
The licensee has no objection with the staff suggested impracticality basis. The licensee also stated that until the degraded pipe is repaired, it will perform daily walkdowns while the spent fuel pool canal is filled and monthly ultrasonic examinations of the through-wall flaw unless the pipe is tagged out-of-service.
The licensee has performed Prompt Operability Determination, CR 2010-2246, which includes the flaw evaluation of the degraded pipe. On the basis of the NRC staff evaluation, pursuant to 10 CFR 50.55a(g)(6)(i), the NRC verbally authorizes the use of Relief Request No.8 for the repair of the degraded spent fuel pool transfer canal drain pipe as of October 27,2010. Relief Request No.8 is authorized to be effective from October 27,2010, to December 31,2010. According to 10 CFR 50.55a(g)(6)(i), the Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed at Turkey Point Unit 3. This verbal authorization does not preclude the NRC staff from asking additional clarification questions regarding Relief Request No.8 while preparing the subsequent written safety evaluation (SE). The written SE should be issued within 150 days in accordance with Office of Nuclear Reactor Regulation standards.
This verbal authorization summary will be publicly available in the NRC ADAMS in the next few days. Enclosure November 5, 2010 MEMORANDUM Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Jason C. Paige, Project Manager IRA! Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation TURKEY POINT UNIT 3 -VERBAL AUTHORIZATION OF RELIEF REQUEST NO.8, TRANSFER CANAL DRAIN LINE PIPING REPAIRS (TAC NO. ME4901) By letter dated October 21, 2010, Florida Power and Light (FPL), the licensee for Turkey Point, Unit 3, submitted Relief Request No.8, Transfer Canal Drain Line Piping Repairs. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a, FPL requested Nuclear Regulatory Commission (NRC) approval of an alternative to the requirements of IWA-4000, "Repair/Replacement Activities," of the American Society of Mechanical Engineers (ASME) Code,Section XI. The relief request is related to the delayed repair of a non-isolable through-wall flaw on the spent fuel pool transfer canal drain piping at Turkey Point Unit 3. The licensee proposed to use the alternative in ASME Code Case N-513-2 for the repair of the degraded transfer channel drain piping. Code Case N-513-2 requires that repair or replacement be performed no later than when the predicted flaw size exceeds the acceptance criteria or the next scheduled outage, whichever occurs first. However, the licensee requested modification to Code Case N-513-2 to defer the repair from the current refueling outage because the subject piping is needed to be operable during the refueling outage. The licensee proposed to complete the Code repair by December 31, 2010. The NRC staff reviewed the licensee's submittal and determined that the proposed alternative will provide an acceptable level of quality and safety. During a conference call with the licensee on October 27, 2010, the NRC staff granted a verbal authorization on the use of Relief Request NO.8 in accordance with 10 CFR 5.55a(g)(6)(i).
The script for the verbal authorization is enclosed.
NRC Licensee Participants:
D.
B. Tomonto T. P. Barnes J. A. Dunstan J. S. Mihalakea Docket No. 50-250
Enclosure:
Verbal Authorization Script DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrPMTurkey Point RidsNrrDorlLpl2-2 RidsNrrDciCpnb RidsRgn2MailCenter JTsao, NRR RidsNrrLABClayton ADAMS Accession No'.. ML 103010089 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME JPaige BClayton DBroaddus(CGratton for) DATE 11/5/10 11/5/10 11/5/10 OFFICIAL RECORD COpy