05000275/FIN-2010006-05

From kanterella
Revision as of 16:49, 8 October 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
05
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2010006 Section 4OA2
Date counted Sep 30, 2010 (2010Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71152
Inspectors (proximate) R Taylor
T Brown
M Hay
A Fairbanks
S Hedger
CCA P.2, Evaluation
INPO aspect PI.2
'