ULNRC-05973, Transmittal of Nuclear Property Insurance Reporting

From kanterella
Revision as of 15:41, 29 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Nuclear Property Insurance Reporting
ML13081A227
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/21/2013
From: Maglio S A
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05973
Download: ML13081A227 (5)


Text

MISSOURI March 21, 2013 ULNRC-05973 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 50.54(w) DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING Callaway Plant In accordance with established federal nuclear property insurance reporting requirements of 10 CFR 50.54(w), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant. This letter does not contain new commitments.

lfthere are any questions concerning this letter, contact Scott Maglio at 573-676-8719.

EMP/nls Enclosure

.........................................................................................................................

Sincerely, A<'<>ti A. v;_? Scott A. Maglio, Regulatory Affairs Manager PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05973 March 21, 2012 Page2 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 ULNRC-05973 March 21,2012 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo NSRB Secretary Mr. Don King, Director (SEMA)* Mr. Thomas Mohr, Senior REP Planner (SEMA)* Mr. Tom Masso, REP Planner (SEMA)* Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Mr. Mark Morgan (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Mr. Dru Buntin (DNR)*

Mr. T. B. Elwood: March 15,2013 Re: Nuclear Property Insurance NRC Property Rule 10 CFR 50.54 (W) Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force. Attached is a schedule I have prepared for the current year's filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure.

Accordingly, please file the original at the appropriate time and make the necessary distribution of copies. MEB/bjl Attachment cc with attachment:

A. C. Heflin A. Schnitz UNION ELECTRIC COMPANY-CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE

-April1, 2013 10 CFR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements

[ 10 CFR 50.54(W)], this is to advise that on April1, 2013, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant. MEB/bjl 1. Primary Nuclear Property Insurance

a. Nuclear Electric Insurance, Ltd. 2. Excess Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. Grand Total Nuclear Events $ 500,000,000

$2,250,000,000

$2,750,000,000 Mark E. Blair Director -Insurance Risk Management Non Nuclear Events $500,000,000

$1 ,000,000,000

$1 ,500,000,000