ULNRC-05135, Nuclear Property Insurance Reporting
| ML050910137 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/21/2005 |
| From: | Keith Young AmerenUE, Union Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-05135 | |
| Download: ML050910137 (3) | |
Text
Union Electric One Ameren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MlO 631666149 314.52132 March 21, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:
ULNRC-05 135 WAmeren UFE DOCKET NUMBER 50-483 CALLAWAY PLANT UNION ELECTRIC COMPANY NUCLEAR PROPERTY INSURANCE REPORTING In accordance with established federal nuclear property insurance reporting requirements (10 CFR 50.54(w)) the attached report provides the present level of insurance and the sources of the insurance which are applicable to the Callaway Plant.
Sincerely, M
gith D. Young Manager, Regulatory Affairs DJW/jdg Attachment YSIO1 a
subsidiary olAmeren Corporation
ULNRC-05135 March 21, 2005 Page 2 cc:
U.S. Nuclear Regulatory Commission (Original and 1 copy)
Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360
UNION ELECTRIC COMPANY - CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE - April 1, 2005 10 CFR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2005, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
- 1. Primary Nuclear Property Insurance
- a. Nuclear Electric Insurance, Ltd.
$ 500,000.000
- 2.
Excess Nuclear Property Insurance
- a. Nuclear Electric Insurance, Ltd.
Grand Total
$2,250,000.000
$2,750,000,000 Ma E. Blair Managing Supervisor MEB/bjI