Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E, BVY 06-076, 2006/08/10-Vermont Yankee - License Renewal Application, Amendment 8, BVY 06-079, 2006/08/22-Vermont Yankee License Renewal Application, Amendment 11, BVY 06-083, 2006/09/05-Vermont Yankee License Renewal Application, Amendment 12, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY 06-096, 2006/10/20-Vermont Yankee - License Renewal Application, Amendment No. 17, BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19, BVY 06-098, E-mail: (PA-LR) Copy of Vhs RAI Response, BVY 07-003, Email: (PA-LR) Vermont Yankee Nuclear Power Station License Renewal Commitment List, Rev. 5, BVY 07-009, License Renewal Application, Amendment 24, BVY 07-018, License Renewal Application, Amendment 26, BVY 07-034, License Renewal Application Annual Update, BVY 07-035, (PA-LR) Bvy 07-035 VY Lr SER Comments, BVY 07-047, License Renewal Application, Amendment 27, Submitted on January 25, 2006, BVY 07-058, License Renewal Application, Amendment 29, BVY 07-062, License Renewal Application, Amendment 30, BVY 07-066, License Renewal Application, Amendment 31, BVY 08-016, (PA-LR) Emailing Bvy 08-016 Final SER Review Comments, BVY 10-069, License Renewal Application Annual Update Information, ML060950195, ML060950215, ML060950218, ML060950220, ML060950224, ML060950235, ML060950250, ML060950258, ML060950262, ML060950269, ML060950271, ML060950277, ML060950279, ML060950284, ML060950290, ML060950301, ML060950311, ML060950323, ML060950328, ML060950331, ML060950347, ML060950351, ML060950356, ML060950364, ML060950370, ML060950372, ML060950375, ML060950540, ML060950549, ML060950559, ML060950567... further results
|
MONTHYEARML0629203681987-12-31031 December 1987 VY Annual Ecological Studies of the CT River Report 16-final.pdf Project stage: Other ML0629203651989-12-31031 December 1989 VY Annual Ecological Reports from the 1980's (1989) Project stage: Other ML0609503511998-02-28028 February 1998 GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other BVY 06-009, 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E2006-01-25025 January 2006 2006/01/25-Vermont Yankee Nuclear Power Station Applicant'S Environmental Report Operating License Renewal Stage, Appendix E Project stage: Other ML0609506372006-03-22022 March 2006 GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506322006-03-22022 March 2006 GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506292006-03-22022 March 2006 GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506202006-03-22022 March 2006 GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502792006-03-22022 March 2006 GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505962006-03-22022 March 2006 GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505872006-03-22022 March 2006 GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505822006-03-22022 March 2006 GALL AMP: XI.M25, BWR Reactor Water Cleanup System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505792006-03-22022 March 2006 GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505592006-03-22022 March 2006 GALL AMP: XI.M20, Open-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505402006-03-22022 March 2006 GALL AMP: XI.M18, Bolting Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503702006-03-22022 March 2006 GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502182006-03-22022 March 2006 GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609501952006-03-22022 March 2006 GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP) Project stage: Other ML0610001472006-03-22022 March 2006 GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001432006-03-22022 March 2006 GALL AMP: XI.S7, Rg 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001382006-03-22022 March 2006 GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001342006-03-22022 March 2006 GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001262006-03-22022 March 2006 GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP) Project stage: Other ML0610001012006-03-22022 March 2006 GALL AMP: XI.S2, ASME Section XI, Subsection Iwl (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000962006-03-22022 March 2006 GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503232006-03-22022 March 2006 GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503112006-03-22022 March 2006 GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503012006-03-22022 March 2006 GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors Project stage: Other ML0609503722006-03-22022 March 2006 GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503752006-03-22022 March 2006 GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) Project stage: Other ML0609505672006-03-22022 March 2006 GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) Project stage: Other ML0609505732006-03-22022 March 2006 GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506102006-03-22022 March 2006 GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) Project stage: Other ML0609506342006-03-22022 March 2006 GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP) Project stage: Other ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0610000782006-03-22022 March 2006 GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502242006-03-22022 March 2006 GALL AMP: XI.E1, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502352006-03-22022 March 2006 GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) Project stage: Other ML0609502692006-03-22022 March 2006 GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP) Project stage: Other 1998-02-28
[Table View] |
|
---|
Category:Report
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 20-026, Defueled Safety Analysis Report, Revision 22020-09-23023 September 2020 Defueled Safety Analysis Report, Revision 2 BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML19198A2522019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML15266A4302015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 24, Flow Diagram Instrument Air System. Sheet 2 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15266A4452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 2 ML15266A4442015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191163, Rev. 51, Flow Diagram Fire Protection System Inner Loop. Sheet 1 ML15266A4402015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 8 ML15266A4362015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 7 ML15266A4352015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 6 ML15266A4342015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 5 ML15266A4332015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 25, Flow Diagram Instrument Air System. Sheet 4 ML15266A4322015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 31, Flow Diagram Instrument Air System. Sheet 3 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 22015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15266A4292015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191160, Rev. 37, Flow Diagram Instrument Air System. Sheet 1 ML15266A4282015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 100, Flow Diagram Service Water System. Sheet 2 ML15266A4272015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191159, Rev. 92, Flow Diagram Service Water System. Sheet 1 ML15266A4262015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191152, Rev. 14, General Arrangement Radwaste Building Section. ML15266A4252015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191151, Rev 19, General Arrangement Radwaste Building Plans. ML15266A4242015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191150, Rev. 20, General Arrangement Reactor Building Section. ML15266A4232015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191149, Rev. 27, General Arrangement Reactor Building Plans Sheet 2. ML15266A4222015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191148, Rev. 23, General Arrangement Reactor Building Plans Sheet 1. ML15266A2722015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report - List of Effective Pages BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 52015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15266A2832015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Drawing List BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15266A2712015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, DSAR Changes ML15266A2732015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, UFSAR to DSAR Conversion Matrix ML15267A6092015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 3 BVY 15-046, Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf.2015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-200347, Circulating Water System Aerating Structure-MAS & Reinf. ML15267A6612015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191595, Control Room Bldg. Ext. Wall Elevs.-M. ML15267A6592015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191592, Control Room Building Fl Plan El 248.50 & Fdn Plan-R, Sheet 1 ML15267A6562015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191529, Reactor Building Reactor Vessel Pedestal Mat - M&R. ML15267A6542015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. ML15267A6512015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191463, Circulating Water System Discharge Structure Reinf, Sheet 2 ML15267A6492015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 ML15267A6472015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191453, Circulating Water System Intake Structure-M, Sheet 3 ML15267A6452015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191452, Circulating Water System Intake Structure-V, Sheet 2 ML15267A6412015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191451, Circulating Water System Intake Structure-M, Sheet 1 ML15267A6112015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 24V DC Neutron Monitoring & 120V AC RPS One Line Diagram, Sheet 5 ML15267A6102015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 120/240V Vital AC and Instrument AC One Line Diagram, Sheet 4 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6082015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, 125V DC One Line Diagram, Sheet 2 ML15267A6072015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191372, Rev. 72, 125VDC One Line Wiring Diagram. Sheet 1 ML15267A6062015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 39, 480V Aux. One Line Diagram MCC-9B, 9D, 89A. Sheet 2 ML15267A6052015-09-0101 September 2015 Rev. 0 to Defueled Safety Analysis Report, Drawing G-191301, Rev. 30, 480V Aux. One Line Diagram Swgr BUS-9, MCC-9A, 9C. Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 12015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191461, Circulating Water System Discharge Structure - Sections, Sheet 1 BVY 15-046, Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R.2015-09-0101 September 2015 Vermont Yankee Nuclear Power Station, Rev. 0 to Defueled Safety Analysis Report, Drawing G-191483, Reactor Building Foundation Mat Plan - M&R. 2021-03-15
[Table view] Category:Miscellaneous
MONTHYEARML21075A1772021-03-15015 March 2021 Response to Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request BVY 19-020, 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 20192019-06-20020 June 2019 72.48 Summary Report for the Reporting Period March 2, 2017 Through March 2, 2019 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum BVY 15-049, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2015-08-19019 August 2015 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 15-018, Transmittal of Biennial 10 CFR 50.59 Report2015-03-0202 March 2015 Transmittal of Biennial 10 CFR 50.59 Report BVY 14-085, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2014-12-19019 December 2014 Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) BVY 14-011, Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ...2014-02-25025 February 2014 Revision to Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima ... BVY 13-090, Submittal of 10 CFR 71.95 Report Involving 8-120B Cask2013-10-0202 October 2013 Submittal of 10 CFR 71.95 Report Involving 8-120B Cask BVY 12-081, Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-21021 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML12160A3732012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daichii Nuclear Plant Accident TAC No. ME8747) ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants BVY 07-079, Update of Aging Management Program Audit Q&A Database2007-11-14014 November 2007 Update of Aging Management Program Audit Q&A Database BVY 07-004, Emergency Response Data System (ERDS) Data Point Library Update2007-06-21021 June 2007 Emergency Response Data System (ERDS) Data Point Library Update ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 L-87-005, Various CRS 08/09/2005 to 02/08/20072007-02-0808 February 2007 Various CRS 08/09/2005 to 02/08/2007 ML0706703802007-02-0101 February 2007 NDE Reports 07-001 Thru 07-008 ML0701705912007-01-0909 January 2007 VYNPS - SEIS Web Reference - Us Census Glossary ML0701701982006-12-15015 December 2006 VYNPS - SEIS Web Reference - Connecticut River Migratory Fish Counts 1967-2005 ML0629204232006-10-0303 October 2006 (E-Mail) Cooling Tower Report for VY ML0629203422006-09-18018 September 2006 (E-Mail) Air Emissions Inventory Report for 2005 and MSDS for Nalco H-550 ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 20062006-08-29029 August 2006 Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 BVY 06-068, Cycle 25 Startup Test Report Following Power Ascension and Testing2006-08-0101 August 2006 Cycle 25 Startup Test Report Following Power Ascension and Testing CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee ML0618803852006-05-22022 May 2006 Windham Regional Plan Draft, May 22, 2006 ML0704404852006-05-12012 May 2006 AMRM-16, Revision 0, Aging Management Review of the Instrument Air System. ML0704404832006-05-12012 May 2006 AMRM-15, Revision 0, Aging Management Review of the Fuel Oil System. ML0704404782006-05-12012 May 2006 AMRM-15, Aging Management Review of the Fuel Oil System ML0704404742006-05-12012 May 2006 AMRM-12, Aging Management Review of the Reactor Building Closed Cooling Water System ML0704404862006-05-11011 May 2006 AMRM-30, Rev. 01, Aging Management Review of Ns Systems Affecting Safety Systems BVY 06-033, Cycle 24 10 CFR 50.59 Report2006-04-24024 April 2006 Cycle 24 10 CFR 50.59 Report BVY 06-031, Revision 1 to Steam Dryer Monitoring Plan2006-03-26026 March 2006 Revision 1 to Steam Dryer Monitoring Plan ML0609503562006-03-22022 March 2006 GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP) ML0609503642006-03-22022 March 2006 GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP) ML0609502712006-03-22022 March 2006 GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections Iwb, Iwc, and Iwd (Audit Worksheet, GALL Report AMP) ML0609505492006-03-22022 March 2006 GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP) ML0609502772006-03-22022 March 2006 GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP) ML0609502152006-03-22022 March 2006 GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP) ML0609505702006-03-22022 March 2006 GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP) ML0609502202006-03-22022 March 2006 GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP) ML0609502502006-03-22022 March 2006 GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP) ML0609502582006-03-22022 March 2006 GALL AMP: XI.E4, Metal Enclosed Bus (Audit Worksheet GALL Report AMP) ML0609502622006-03-22022 March 2006 GALL AMP: XI.E5, Fuse Holder (Audit Worksheet GALL Report AMP) ML0609503472006-03-22022 March 2006 GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors ML0609506062006-03-22022 March 2006 GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP) ML0609506242006-03-22022 March 2006 GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP) ML0609502902006-03-22022 March 2006 GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) ML0610000902006-03-22022 March 2006 GALL AMP: XI.M39, Lubricating Oil Analysis Program (Audit Worksheet GALL Report AMP) ML0609503312006-03-22022 March 2006 GALL AMP: XI.M10, Boric Acid Corrosion (Audit Worksheet GALL Report AMP) 2021-03-15
[Table view] |
Text
XI.M18 Bolting Integrity 1 AUDIT W ORKSHEET GALL R EPORT AMP PLANT: ______________________________
LRA AMP: __________________________
R EVIEWER: ______________________
GALL AMP: XI.M18, Bolting Integrity DATE: __________________________
Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. The program relies on recommendations for a comprehensive bolting integrity program, as delineated in NUREG-1339, and industry recommendations, as delineated in the Electric Power Research Institute (EPRI) NP-5769, with the exceptions noted in NUREG-1339 for safety-related bolting. The program relies on industry recommendations for comprehensive bolting maintenance, as delineated in EPRI TR-104213 for pressure retaining bolting and structural bolting. The program generally includes periodic inspection of closure bolting for indication of loss of preload, cracking, and loss of material due to corrosion, rust, etc. The program also includes preventive measures to preclude or minimize loss of preload and cracking. Other aging management programs, such as XI.M1, "ASME Section XI Inservice Inspection (ISI) Subsections IWB, IWC, and IWD" and XI.S3, "ASME Section XI Subsection IWF" also manage inspection of safety-related bolting and supplement this bolting integrity program. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 1. Scope of Program A. This program covers bolting within the scope of license renewal, including: 1) safety-related bolting, 2) bolting for nuclear steam supply system (NSSS) component supports, 3) bolting for other pressure retaining components, including non-safety-related bolting, and 4) structural bolting (actual measured yield strength 150 ksi). The aging management of reactor head closure studs is addressed by XI.M3, and is not included in this Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment XI.M18 Bolting Integrity 2 Program Element Auditable GALL Criteria Documentation of Audit Finding program. " B. The staff's recommendations and guidelines for comprehensive bolting integrity programs that encompass all safety-related bolting are delineated in NUREG-1339, which include the criteria established in the 1995 edition through the 1996 addenda of ASME Code Section XI. The industry's technical basis for the program for safety-related bolting and guidelines for material selection and testing, bolting preload control, ISI, plant operation, and maintenance, and evaluation of the structural integrity of bolted joints, are outlined in EPRI NP-5769, with the exceptions noted in NUREG-1339. For other bolting, this information is set forth in EPRI TR-104213. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 2. Preventive Actions A. Selection of bolting material and the use of lubricants and sealants is in accordance with the guidelines of EPRI NP-5769, and the additional recommendations of NUREG-1339, to prevent or mitigate degradation and failure of safety-related bolting (see element 10, below). NUREG-1339 takes exception to certain items in EPRI NP-5769, and recommends additional measures with regard to them. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " B. Bolting replacement activities include proper torquing of the bolts and checking for uniformity of the gasket compression after assembly. Maintenance practices require the application of an appropriate preload, based on EPRI documents. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 3. Parameters Monitored/ Inspected A. This program monitors the effects of aging on the intended function of bolting. Specifically, bolting for safety-related pressure retaining components is inspected for leakage, loss of material, cracking, and loss of preload/loss of prestress. Bolting for other pressure retaining components is inspected for signs of leakage. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " B. High strength bolts (actual yield strength ~150 ksi) used in NSSS component supports are monitored for cracking. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
XI.M18 Bolting Integrity 3 Program Element Auditable GALL Criteria Documentation of Audit Finding Structural bolts and fasteners are inspected for indication of potential problems including loss of material, cracking, loss of coating integrity, and obvious signs of corrosion, rust, etc.
Comment: 4. Detection of Aging Effects A. Inspection requirements are in accordance with the ASME Section XI, Tables IWB 2500-1, IWC 2500-1 and IWD 2500-1 editions endorsed in 10 CFR 50.55a(b)(2) and the recommendations of EPRI NP-5769. For Class 1 components, Table IWB 2500-1, Examination Category B-G-1, for bolts greater than 2-inches in diameter, specifies volumetric examination of studs and bolts and visual VT-1 examination of surfaces of nuts, washers, bushings, and flanges. Examination Category B-G-2, for bolts 2-inches or smaller, requires only visual VT-1 examination of surfaces of bolts, studs, and nuts. For Class 2 components, Table IWC 2500-1, Examination Category C-D, for bolts greater than 2-inches in diameter, requires volumetric examination of studs and bolts. Examination Categories B-P, C-H, and D-B require visual examination (IWA-5240) during system leakage testing of all pressure-retaining Class 1, 2 and 3 components, according to Tables IWB 2500-1, IWC 2500-1, and IWD 2500-1, respectively. In addition, degradation of the closure bolting due to crack initiation, loss of prestress, or loss of material due to corrosion of the closure bolting would result in leakage. The extent and schedule of inspections, in accordance with Tables IWB 2500-1, IWC 2500-1, and IWD 2500-1, combined with periodic system walkdowns, assure detection of leakage before the leakage becomes excessive. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " B. For other pressure retaining bolting, periodic system walkdowns assure detection of leakage before the leakage becomes excessive. High strength structural bolts and fasteners (actual yield strength 150 ksi) for NSSS component supports, may be subject to stress corrosion cracking (SCC). For this type of high strength structural Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.M18 Bolting Integrity 4 Program Element Auditable GALL Criteria Documentation of Audit Finding bolts that are potentially subjected to SCC, in sizes greater than 1-inch nominal diameter, volumetric examination comparable to that of Examination Category B-G-1 is required in addition to visual examination. This requirement may be waived with adequate plant-specific justification. Structural bolts and fasteners (actual yield strength < 150 ksi) both inside and outside containment are inspected by visual inspection (e.g., Structures Monitoring Program or equivalent). In addition to visual and volumetric examination, degradation of these bolts and fasteners may be detected and measured by removing the bolt/fastener, a proof test by tension or torquing, in situ ultrasonic tests, or a hammer test. If these bolts and fasteners are found cracked and/or corroded, a closer inspection is performed to assess extent of corrosion. An appropriate technique is selected on the basis of the bolting application and the applicable code. 5. Monitoring and Trending A. The inspection schedules of ASME Section XI are effective and ensure timely detection of applicable aging effects. If bolting connections for pressure retaining components (not covered by ASME Section XI) is reported to be leaking, then it may be inspected daily. If the leak rate does not increase, the inspection frequency may be decreased to biweekly or weekly. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 6.
Acceptance Criteria A. Any indications of aging effects in ASME pressure retaining bolting are evaluated in accordance with Section XI of the ASME Code. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " B. For other pressure retaining bolting, NSSS component support bolting and structural bolting, indications of aging should be dispositioned in accordance with the corrective action process. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment:
XI.M18 Bolting Integrity 5 Program Element Auditable GALL Criteria Documentation of Audit Finding 7. Corrective Actions A. Replacement of ASME pressure retaining bolting is performed in accordance with appropriate requirements of Section XI of the ASME Code, as subject to the additional guidelines and recommendations of EPRI NP-5769. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " B. Replacement of other pressure retaining bolting (i.e., non-Class 1 bolting) and disposition of degraded structural bolting is performed in accordance with the guidelines and recommendations of EPRI TR-104213. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: " C. Replacement of NSSS component support bolting is performed in accordance with EPRI NP-5769. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 8.
Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 9.
Administrative Controls A. See item 8, above. Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
Comment: 10. Operating Experience A. Degradation of threaded bolting and fasteners in closures for the reactor coolant pressure boundary has occurred from boric acid corrosion, SCC, and fatigue loading (NRC IE Bulletin 82-02, NRC Generic Letter 91-17). SCC has occurred in high strength Consistent with GALL AMP:
Yes No Document(s) used to confirm Criteria:
XI.M18 Bolting Integrity 6 Program Element Auditable GALL Criteria Documentation of Audit Finding bolts used for NSSS component supports (EPRI NP-5769). The bolting integrity program developed and implemented in accordance with commitments made in response to NRC communications on bolting events have provided an effective means of ensuring bolting reliability. These programs are documented in EPRI NP-5769 and TR-104213 and represent industry consensus. Degradation related failures have occurred in downcomer Tee-quencher bolting in BWRs designed with drywells (ADAMS Accession Number ML050730347). Leakage from bolted connections has been observed in reactor building closed cooling systems of BWRs. (LER 50-341/2005-001). The applicant is to evaluate applicable operating experience to support the conclusion that the effects of aging are adequately managed. Comment:
XI.M18 Bolting Integrity 7 EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #) 1. 2. -
DOCUMENT REVIEWED D URING A UDIT Document Number Identifier (number) Title Revision and/or Date 1. 2. 3. 4. -.