ML070670380

From kanterella
Jump to navigation Jump to search
NDE Reports07-001 Thru 07-008
ML070670380
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/01/2007
From: Griffin M
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
51081726 01
Download: ML070670380 (16)


Text

Work Order No.: f f 726 O/

Vermont Yankee Non-Code Internal Visual Examination Drawing No/Rev.: 6-191'iLg/ 2 Report Form for Components and Piping Component and/or Piping Component ID: . i a h J Jfdf n AN 2 System ID: L ~ R JJRAJN Examined: MIn Place RRemoved What is Being Examined: JAN4 L?IhVN TYJE ZHTFAAYL J Visual Aids Experience Hours Credit: 4,0 VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-001 Page2 o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #2

1. No screen was evident at the end of the drain tubing. There was no obvious obstruction at the tube inlet.
2. Air flow was noted moving in the direction of the sand cushion.
3. Small stone type particle debris was noted in 10% to 15% of the tube length.

While extensive, it does not appear that these obstructions would impede the flow of water that may come from the sand cushion area.

4. A tubing kink exists at 91 from the tubing inlet
5. A tubing joint was noted at 44 form the tubing inlet and appears to be functional.
6. Overall tube length is approximately 167

Vermont Yankee Work Order No.: s/of / 726 01 Non-Code Internal Visual Examination Report Form for Components and Piping Light Source (Describe): Remote Visual Examination Aids Used (Describe):

UInstalIed Lighting OfYflPUJ fIdE/P JCOPL: JPfkX NBZL BTemporary Lighting*

Method + Photo fa& Rc-rndfki Sketch (Z1Direct WRemote ONone Attached mNone OAttached Loose Bolting I 1 Experience Hours Credit: 4.0 VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-002 Page2 o f 2 Sumlemental Information Comments for Sand Drain inspection at Bay #4

1. Screen intact with approximately 40% of the screen area clear.

Approximately 60% of the screen area has sand or other deposit impingement.

2. Air flow noted in the direction of the sand cushion.
3. Kink noted at approximately 87 from the drain tube entry.
4. Minor debris noted including what appears to be a nail.
5. Joint at 49 from tube entry appears to be functional.

6 . Overall tube length was not measured for this tube due to scaffold obstruction and radiation dose consideration.

Work Order No.: 310 8 / 72 6 01 Vermont Yankee Non-Code Internal Visual Examination Report Form for Components and Piping Component I D : s a h d h f i i h My6 SystemID: Jd#d Dtf'A H Examined: @In Place ORernoved Arc Strikes A Loose Parts Missing Parts Excessive Movement A Alignment A Experience Hours Credit: #. 0 VYNEF 8064.04 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-003 Pages o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #6

1. Screen appears to be intact with sand and other deposit impingements noted over approximately 98% of the screen surface area.
2. Kink noted at approximately 88 from the tube entry.
3. Joint noted at approximately 42 from tube entry. Joint appears to be intact and functional.
4. Overall length of drain tube is approximately 162 from tube entry.
5. No conclusive air flow was noted in this tube.

Vermont Yankee Non-Code Internal Visual Examination Report Form for Components and Piping I Component and/or Piping Remarks:

Initials:

Experience Hours Credit: 40 VYNEF 8064.04 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-004 Pagel o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #8

1. Screen intact with approximately 40% of the surface area clear and approximately 60% included by sand or other deposits.
2. Kink noted at approximately 96 form tube entry.
3. Joint noted at 47 from tube entry. Joint appears to be intact and functional.
4. Overall length of tube is approximately 172 measured from tube entry.
5. No conclusive air flow was noted in this tube.

Vermont Yankee Work Order No.: J/o f / 726 O/

Non-Code Internal Visual Examination Report Form for Components and Piping Component and/or Piping Visual Aids Experience Hours Credit: 4.0 VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-005 Page2 o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #10

1. Screen appears to have a slight gap between the screen surface and the tube end. Screen is intact with approximately 98% of the screen surface area included by sand and other impinged material.
2. Kink noted at approximately 94" from tube entry.
3. Joint noted at 44" from tube entry. Joint has a significant gap in the coupling, but appears to be intact and functional.
4. Overall tube length is approximately 166".
5. No conclusive air flow was noted.

Vermont Yankee Non-Code Internal Visual Examination Report Form for Components and Piping I Page L of 2 Date: 02/01/07 Fractured Bolting Thread Engagement Evidence of Leakage Experience Hours Credit: 4d VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-006 Pages o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #12

1. Slight gap noted between the screen and tube end. Screen is intact with approximately 30% of the area clear and approximately 70% of the screen area included with sand and other impinged material.
2. Kink noted at approximately 87 from tube entry.
3. Minor debris noted.
4. Joint noted at 45 from tube entry. Joint has a gap but appears to be intact and functional.
5. Overall tube length is approximately167.
6. Small air flow noted in direction of the sand cushion.

Vermont Yankee Non-Code Internal Visual Examination Report Form for Components and Piping Component and/or Piping Experience Hours Credit:-4!L VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-007 Page2 o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #14

1. Screen intact and 100% clear. Minor damage to screen.
2. Minor debris noted.
3. Air flow noted in direction of sand cushion.
4. Kink noted at approximately 72 from tube entry.
5. Joint noted at approximately 47 from tube entry. Joint appears to be intact and functional.
6. Overall tube length is approximately 163.

Vermont Yankee Non-Code Internal Visual Examination Report Form for Components and Piping

~~~~~

Component and/or Piping Date W # U O7 Remarks: /

Initials: 2 Experience Hours Credit:Bo VYNEF 8064.04 NE 8064 Rev. 2 Page 1 of 1

Supplemental Report Sheet Vermont Yankee Non-Code Internal Visual Examination Procedure NE 8064 Code Programs NDE Report #: 07-008 Page2 o f 2 Supplemental Information Comments for Sand Drain inspection at Bay #16

1. Screen intact approximately 80% clear and approximately 20% included by impinged material.
2. Double kink noted at approximately 93 form tube entry.
3. Air flow noted in the direction of the sand cushion.
4. Joint at approximately 48 from tube entry. Joint appears to have a slight gap but otherwise intact and functional.
5. Overall tube length is approximately 164.