Rev. 0 to Defueled Safety Analysis Report, DSAR Changes
ML15266A271
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/01/2015
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15266A267 List: ... further results
References
BVY 15-046
Download: ML15266A271 (2)


Text

Vermont Yankee DSAR Changes Revision 0 FCR #

UFSAR Section Page Table Figure Reason for Change 26/011 15.5 15.5-10 Cancel License Renewal Commitment 43 (Vernon Hydro Station cable testing) due to designation of SBO DG as new AAC source for 10 CFR 50.63 compliance 27/001 15.2 15.2-8 Editorial change to incorporate 5th ASME Code Inservice Inspection Interval details 27/002 13.3 13.3-2 Updating ANSI/ANS 3.1 1978 and 1993 training standards for plant staff and Shift Technical Advisors to align with revised QA program manual and TS 6.2.B and C.

27/003 10.13, 10.15 10.13-3, 10.13-4, 10.15-2 Engineering Change 45613 Disconnection of southwest well pump from potable water system 27/004 7.3 7.3-18 Engineering Change 47544 Revise main steam line high flow trip setting (Note:

Change applicable only while VY was operating and is not reflected in DSAR Rev 0) 27/005 Various System Abandonment - Decommissioning 27/006 14 Revise Section 14 (Station Safety Analysis) to reflect permanently defueled condition - Decommissioning 27/009 12 Engineering Change 47998 - Reactor Building crane control upgrade 27/010 5.2, 7.1, 7.12, 7.13, 12.2, 14.9 and 15.3 5.2-22, 7.1-1, 7.1-9, 7.12-15, 7.12-19, 7.13-8, 12.2-20, 14.9-6, 15.3-1, 15.3-6 7.12.2, 7.13.1, Removal of EQ Program Requirements - Decommissioning Tuesday, July 21, 2015 Page 1 of 2

FCR #

UFSAR Section Page Table Figure Reason for Change 27/013 1.9, 15.2 1.9-2, 15.2-3 Revision to Sections 1.9 and 15.2 to align with issuance of VY QAPM Revision 0 27/014 15 All Revise Section 15 (Aging Management Programs) to reflect the permanently defueled condition - Decommissioning 27/015 9

9.3-5, -6 Engineering Change 54271 - Removal of LLRW site and other non-SSC (PUB and Maine Yankee) buildings - Decommissioning 27/016 5.2 5.2-23, -

32 and -

32 Implement License Amendment 260 - Remove reference to Appendix J program 27/017 7.15 7.15-4, 7.15-5 Remove Emergency Response Data System based on permanently defueled condition 27/019 10.3 10.3-9, 10.3-10 Regulatory Commitment: Revise UFSAR to include a description of how the VY spent fuel pool design and operational characteristics meets or compares with the NUREG-1738 Industry Decommissioning Commitments and Staff Decommissioning Assumptions.

27/020 14 Regulatory Commitment: Revise UFSAR to reflect revised fuel handling accident analysis based on permanently defueled condition 27/021 8.3 8.3-6 Removal of Station Blackout Rule (10 CFR 50.63) compliance information and regulatory commitments associated with Station Blackout DG testing based on permanently defueled condition 27/023 8.5, 10.5, 10.6 Engineering Change 50086 - Reclassification of the Standby Fuel Pool Cooling System safety classification; EC 52295 - Reclassification of the Service Water System; EC 50014 - Reclassification of the Emergency Diesel Generators and support systems 27/027 Defueled Safety Analysis Report Revision 0 Tuesday, July 21, 2015 Page 2 of 2