Executive Summary for Groundwater Drawdown Calculations Included in Vogtle ESP Er Sections 4.2.2 and 5.2.2 Groundwater Use Impacts During Construction and Operation
ML063000223
Person / Time
Site: Vogtle, 05200011  Southern Nuclear icon.png
Issue date: 12/01/2006
From:
- No Known Affiliation
To:
Office of New Reactors
Guerrero, C, NRO/DSER/RAP1, 415-2981
References
+findbmpk, +reviewedcja
Download: ML063000223 (32)


Text

Executive Summary for Groundwater Drawdown Calculations included in Votgle ESP ER Sections 4.2.2 and 5.2.2 Groundwater Use Impacts During Construction and Operation In order to determine potential offsite impacts of groundwater drawdown, cumulative well yield was used to calculate drawdown as though it had been pumped from a single onsite well. The well MU-2A location was used, due to its close proximity to the VEGP property boundary (5,700 feet) and because the well has been one of the site's primary production wells.Data used to input to an analytical distance-drawdown model was taken from VEGP's updated Final Safety Analysis Report (SNC 2005). A Transmissivity value of 158,000 gpd/ft was used. The Storativity value (3.1x10-4) is an average of the values listed in Table 2.4.12-8 of the SNC 2005 FSAR calculated for the deeper production wells. Total groundwater use reported to the Georgia Department of Natural Resources by. VEGP from 2001 through 2004 averaged 730 gpm. (SNC 2000a,b, 2001a,b, 2002a,b,c, 2003a,b, 2004a,b) This value is considered the total groundwater use value for the existing units.A maximum construction pumping rate of 420 gpm was used (FSAR 2005). The total groundwater use rate for the proposed units is 752 gpm (ESP ER Table 3.3-1).Therefore, the pumping rate used in the analysis for most of the construction phase is 1,150 gpm (730 + 420 = 1150 gpm). There will be a period, after completion of the first unit but before completion of the second unit, when the pumping rate will include the 730 gpm for the existing units, a construction rate for Unit 4, and an operational rate for Unit 3. For this construction/operational overlap period, the groundwater pumping rate will include the existing rate of 730 gpm, one-half the construction rate or 210 gpm, and one-half the proposed operational rate or 376 gpm. -The total for this period will be 1,316 gpm. The pumping rate during the normal operation of all four units will be 1,482 gpm (730 gpm + 752 gpm).A nonleaky aquifer scenario was used using the Theis equation to simulate site conditions.

The equation assumes that the aquifer is homogeneous, isotopic, with negligible recharge and gradient, and that boundary impacts do not occur. The equation was run for each pumping rate scenario described above. The first simulation assessed the the initial pumping rate for Units 1 and 2 plus construction water usage; the second included pumping for Units 1 and 2, the initial startup of one unit, plus construction; and the third assumed the total use for all four units. The drawdown values calculated are very conservative because the pumping times for each of the simulations was initiated as being the start of Unit 1 operations and not adjusted to accommodate when actual changes in pumping rates would occur. Therefore the drawdowns at the property boundary modeled here are the result of a much longer pumping period for each scenario than will actually occur. The result is a larger drawdown value than would actually be observed, resulting in a very conservative analysis.Off-normal operations (Table 2.9-1) for the existing units would require approximately 2,300 gpm of groundwater for both units and off-normal operations for both the proposed units would use approximately 3,140 gpm. Off-normal usage for all four units would be 5,540 gpm. However, off-normal operations would likely affect only one unit, therefore SNC believes that groundwater needs for any off-normal operations plus normal operations of the other units can be accomplished within the existing groundwater permit issued by the State of Georgia. Since off-normal operations would be short lived, this scenario has not been modeled. SNC believes that a scenario where all four operating units would be under off-normal operations would be extremely unlikely.

Therefore, this scenario has not been modeled although it would greatly exceed the maximum groundwater pumping rates [6 million gallons per day monthly average (MGD) [4,167 gpm] and average 5.5 MGD annually (3,819 gpm)] established under SNC's existing permit.

DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT_ _ _ _ _ _ _ (Print or type all Information)

This form shal be submitted to the Division within fifteen (15) days after the reporting period specified on the permit under Standard Condition No. 3 Permittee Southern Nuclear Operating Company -Vogtla Electric Generating Plant Permit No. 017-0003 For six month period from 09-01-1999 thru 02-29-2000 This report is on the Cretaceous Sand Aquifer used by well(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigation Well #4, Tactical Training Well #5, Training Center Well, Recreation Area Well, & Well TW-1.* Specific Conductivity

-,NA_ mmhos/cm Static water level (SWL)Pumping water level (PWL)45.1 ft. Elevation 155.4 ft. Well no.52.6 ft. Elevatlon 147.9 ft, Well no.(Use additional sheet if necessary)

MU-1 Date measured 2-15-2000 MU-1 Date measured 2-15-2000 Number of hours shutdown for SWL measurement 57 min Number of continuous hours pumped for PWL measurement 64 min Method of measurement: ( ) Air Line; ( X ) Probe; ( ) Tape; ( ) Other (Specify)Measurement from: (X )Top of casing: ( ) Ground' ( ) Other (Specify)'Obtain and opropoiate sets of neastroanw a Inrdcated below From 1"- wells a set from. ONLY I WELL Take readings from the highest yield well(s), From 6-TO weIS-a set from ONLY 2 WELLS using the same well(s) each time. For From 11.15 wells-a Wt from ONLY 3 WELLS additional wells, follow this format Frmr 16.20 wells-a set from ONLY 4 WELLS Monthly amount of water pumped from aquifer in thousands of gal, MONTH Monthly Method used to determine pumpage TOTAL MAX. DAY AvgJDay September 26431.6 1525.2 881.1 (X) Flow meter October 22841.8 1017.0 736.6' Other (Specify)November 24859.4 1841 .4 828.6 Use: For a consumptive use for central water-,SUnolv. cooling water, process water for December 25365.4 1418.4 818.2 weratlon of Units 1 & 2. and Irtatior of January 51070.8 3158.9 1647.5 ornamental vegetation.

February 25035.5 1521.5 863.3 GRAND TOTAL 175604.5 ANNUAL AVG. / DAY 919.0 Average hours pumped per day: 8.0 SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above information is true to best of my knowledge and belief.Signed Title Date General Manager -Vogtle Electric Generating Plant/93 /fdtn 1, in I DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print of boe all Information)

This form shall be submitted to the Division within fifteen (15) days after (he reporting period specified on the permit under Standard Condition No. 3 Permittee Southern Nuclear Operating Company -Vogtle Electric Generating Plant Permit No. 017-0003 For six month period from 09-01-1999 thru 02-29-2000 This report is on the Cretaceous Sand Aquifer used by well(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigation Well #4, Tactical Training Well #5, Training Center Well, Recreation Area Well, & Well TW-1.Specific Conductivity NA mmhoslcrr Static water level (SWL) 63.5 ft. Elevation 162.2 ft. Well no. MU-2A Date measured 1-13-2000 Pumping water level (PWL) 93.5 ft. Elevation 132.2 ft.- Well no. MU-2A Date measured 1-13-2000 (Use additional sheet If necessary)

Number of hours shutdown for SWL measurement 40.5 hr Number of continuous hours pumped for PWL measurement 45 min Method of measurement: ( ) Air Line; X ) Probe; ( ) Tape; ( ) Other (Specify)Measurement from: (X ) Top of casing; ( ) Ground; ( ) Other (Specify)'Obtain and subnil aplopriate sets of measurements as Intcated below From I-S 1 e esel 9am foONU0 1WELL Take readings from the highest yield well(s), FoomnrO watel,-&set f5orom ONLYM2WELLS using the same well(s), each time. For From 11-16 wells-a set from ONLY3 WELLS additional Wells, follow this format From 16-20 wellra set from ONLY 4 WELLS Monthly amount of water piuped from aquifer in thousands of gel.MONTH Monthly Method used to determine pumpage TOTAL MAX. DAY Avg./Day (x) __Flow meter_____Other (Specify)Use: For a consumotive use for central water supotv. cooling water, process water for A ~operation of Units 1 & 2Z and irrigation of ornamental vegetation.

GRAND TOTAL ANNUAL AVG. I DAY Average hours pumped per day;SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above information is true to best of my knowledge and belief.Signed Title Date-4 FA General Manager -Vogtle Electric Generating Plant L41611176N

,-J -L. ft 4LW I .W DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or lye all iWormation)

This iorm shall be submitted to the Division within fifteen (15) days after the reporting period specified on the permit under Standard Condition No. 3 Permlttee Southern Nuclear Operating Company -Vogtte Electric Generating Plant Permit No- 017-M003 For six month period from 03-01-2000

-thni 08-31-2000 This report is on the Crqtt=ous Sand Aquifer used by well(s) numbered:

Ma"e-up Welts #1 and #2A, Construction Well #3, Irrigation Well #4. Tactical Training Well #5, Training Center Well, Recreation Area Well, & Well TW-i.Specific Conductivity JZ2 mmhos/cm Static water level (SWL)Pumping water level (PWL)44.7 ft.51.0 ft.Elevation 155.8 ft. Well no.Elevation 149.3 1t. Well no.(Use additional sheet If necessary)

MU-1 Date measured 08-25-00 MU-I Date measured 08-25-00 Number of hours shutdown for SWL measurement 30 min Number of continuous hours pumped for PWL measurement 31 rin Melhod of measuremern: ( ) ir Line; ( X) Probe; ( ) Tape; (.) Other (Specrfy)Measurement from; ( X ) Top of casing; ( ) Ground; ( Other (Specify)"anG w(b4 ux svga~e CEO I.me*A~rem' U, 114$ It%.gIt bl.~FIr, 1 ,.la I *wt ONLY I WELL Take readings tn h NOghest yeld well(s)-'6d0 s.4u ONNLY 2 WELLS using tVe same well(s) eaeh tWne. For P-m in 11-I V-. m fr ONLY a WE addidonal wels, follow M fomied From 16-20 wu m fme OMLY 4 WELLS Monthly arnount of water pumped from aquifer in thommds of go.MONTH Monthly Medhod used to determine pumpae TOTAL MAX. DAY AvgJDay March 28895.5 1690.6 932.1 (Xl Flow meter April 3449.1 1966.8 1101.6 O0rier (Specify)May 31720.8 1321.5 U2 3.3 e For Lo s for genfral 18M______________

_____________

______________

____________sucSly roolino water. omes water lor June 33911.1 1701.5 1130A July 3342-1 1677.7 1140.1 ornamental veoelafion.

August 40264.9 1792.2 1298,9 aRAND TOTAL 204183.5 ANNUAL AVG. I DAY 1038.5 Average hours pumped pew day:. 9.3 SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above Information is true to best of my knowledge and belief.Signed Title Date General Manager -Vogde Electric Generating Plant I ]jA2-6o6 DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or twoe all informraLof).

This form shall be submitted to the Division within fitfeen (1i) days after the reporting period specified on the permit under Standard Condition No. 3 Permitsee Southern Nuclear Ope'rarnkn Company -Vogtde Electric Generating Plant Permit No. 017-0003 For six month period from 03-01-2000 thtu 08-31-2000 This report is on fhe Cretaceous Send Aquifer used by well(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigation Well #4, Tactical Training Well #5, Training Center Well, Recreation Area Well, & Weif TW-1.Specific Conductivity

..476 mnmhos/cr Static water level (SWL)Pumping water level (PWL)58.5 ft.72.3 ft, Elevation 162.5 ft. Wll no.Elevation 148.6 It. Well no.(Use additional sheet if necessary)

.TW-1 Date measured 08-24-00 TW-1 Date measured 08-24-00 Number of hours shufdown for SWL measuremenl 8 mo.Number of contiruous hours pumped for PWL measurement 31 mrin Method of measurement:

(. ) Ar Une; ( X) Probe; "( ) Tape; ( ) Other (Specfy)Measurement from: (X )Top of casing; ( ) Ground; ( ) Other (Specify)lobt*t wid &.Mtrd wwwimiit wed meaimmrfm as inamed beiew,"Fronm1 sfm. ONLY I WGLL Take rftdngs a rm the highest yield well(s), From 4.1 a sedl. ONLY 2 WELLS uing the same voelgs) each tima. For From11-1S.11"8 e~ fra ONtY 2 WELL adlwftsl wafti, 10110w this format FF~u 164w~r8 Mi railONLYi WCLLS Monthly wrroivrl of water ptumped from aquifer in thousands Of gal.MONTH Monthly Metod used to datermhe pumnpage TOTAL MAX. DAY Avg./Day (X- Row meter_Other (Specify)Use: FPer a ijy arusW ue for Cerea Myter OWN, _-oling wnff. =Mto ywterf____________

______________________

oeratlon of Mgbs 1 & 2. and irrwotlor f GfRAND TOTAL ANNUAL AVG. / DAY Average hourm pimped per day, SUCH OTHER PERTINENT INFORMATION FUANISlIFD BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above information is true to best of my knowledge and beief.Signed Title Date General Manager -Vogde Electric Generating Plant TOTAL F.04{

DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or type all information)

This form shall be submitted to the Division within fifteen (15) days after the reporting period specified on the permit under Standard Condition No. 3 Permittee Southern Nuclear Operating Company -Vogte Electric Generating Plant Permit No. 017-0003 This report is on the Cretaceous Sand For siK month period from 09-01-2000 thru 02-28-2001 Aquifer used by well(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigation Well #4, Tactical Training Well #5, Training CenterWell, Recreation Area Well, & Well TW-1.Specific Conductivity NA mmhos/cm Static water level (SWL)Pumping water level (PWL)70.7 ft.105.3 ft.Elevation 155.0 ft. Well no.Elevation 120.4 ft. Well no.(Use additional sheet If necessary)

MU-2A Date measured 2-09-2001 MU-2A Date measured 2-09-2001 Number of hours shutdown for SWL measurement 30 min Number of continuous hours pumped for PWL measurement 30 min Method of measurement: ( ) Air Line; ( X ) Probe; ( ) Tape; ( ) Other (Specify)Measurement.from: ( X ) Top of casing; ( ) Ground; ( ) Other (Specify)abtain j btmf appropriate

$011of meaIUreamms as ndcatad blow FrOM 1-6 well a set from ONLY I WELL Take readings from the highest yield well(s), From 6-10wellS-a

$atfrom ONLY2WELLS using the same well(s) each time. For From 11-16 well" set from ONLY 3 WELLS additional wells, follow this formal From 16.20 wells-a sat from ONLY 4 WELL9 Monthly amount of water pumped from aquifer in thousands of gal.MONTH Monthly Method used to determine pumpage TOTAL MAX. DAY Avg./Day September 44868.7 2172.7 1495.5 (X) Flow meter October 53298.9 31702 1719.3 Other (Specify)November 47151.2 3161.3 1571.7 Use: For a consumotive use for central water_uDDlyv coolina water. process water tor December 48712.8 3288.7 1571.4________________

eeraton of Units I & 2. and Itrigatiort of ,January 37496.5 2605.7 1209.5 ornamental vegetation.

February 37756.6 2124.8 1348.5 GRAND TOTAL 269283.7 ANNUAL AVG.1 DAY 1300.2 Average hours pumped per day: 12.4 SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION, I certify that the above information is true to best of my knowledge and belief.Signed U77-1 7 Title General Manager -Vogle Electric Generating Plant Date I DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or tpe all Information)

This form shall be submitted to the Division within fifteen (15) days after the reporting period specified on the permit under Standard Condition No. 3 Permittee Southern Nuclear Operating Compa Permit No. 017-0003 This report is on the Cretaceous Sand mv -Voatle Electric Generatina Plant For six month period from 09-01-2000 thnu 02-28-2001 Aquifer used by well(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigation Well #4, Tactical Training Well #5, Training Center Well, Recreation Area Well, & Well TW-1, Specific Conductivity NA mmhos/cr.Static water level (SWL) 58.9 It. Elevation 162At ft. Well no. TW-1 Date measured 2-26-2001 Pumping water level (PWL) 712 At. Elevation 149.8 ft. Well no. TWA- Date measured 2-26-2001 (Use additional sheet if necessary)

Number of hours shutdown for SWL measurement 35 min Number of continuous hours pumped for PWL measurement 30 min Method of measurement ( ) Air Line; ( X ) Probe; ( ) Tape; ( ) Other (Specify)Measurement from: (X ) Top of casing; ( ) Ground; ( ) Other (Specify))'Obtain and submit measurementn asindicted below From I-" wells a set from ONLY I WELL Take readings from the highest yield well(s), From 6-lo1wll.

9sofrom O wYZWEL.S using the same well(s) each time. For From,, IlW6 wells. Wfrorn ONLY 3.W.ELLS additional wells, follow this format From 16-20 welle-a set Irem ONLY 4 WELLS Monthly amount of water pumped from aquifer in thousands of gal.MONTH Monthly Method used to determine pumpage TOTAL MAX. DAY Avg./Day (_X_) Flow meter_ _ _Other (Specify)Use: For a consumptive use for central water__-__ __ __ _,suvoly.

cooling water, process water for A__ _ __ _operation, of Units 1 & 2. and Irrigation of ornamental vegetation, GRAND TOTAL ANNUAL AVG. (DAY Average hours pumped per day: SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above Information is true to best of my knowledge and belief, Signed Title 4,j4_1 TJa7 General Manager -Vogtle Electric Generating Plant Date p- /

SEP-14-2001 09: 23 FROM UOGTLE TECH. SUPPORT l u DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT Pnrit Or tve 4l1 information)

=)NI- M11V zmmv I .--This form shall be submitted to the Division within fifteen (I5) days after he reporting period specified on the permit under Standard Condition No. 3 Parynittee Southem. Nuctear Operating Compar -Vo Ele Elctric Generatin Plent Permit No. 017-0003 For six month period from 03-01-2001 thru 0B-31-2001 This report Is on the Cretaceous Sand Aquifer used by weli(s) numbered:

Make-up Wells #1 and #2A, Construction Well #3, Irrigaion Well #4. Tactical Training Well #6, Training Center Well, Recreation Area Well, & Well TW-1.Specific Conductvity 155 mmhos/cm Static water level (SWL) 46,5 ft. Elevation 154.0 ft. WeA no. MU-1 Date nmesued 08-31-01 Pumping water level (PWL) 62.6 ft. Elevation 147.9 ft. Well no. MU-1 Date measured 0"-31.01 (Use additional sheet. if necessary)

Number of hours shutdown for SWIL measurement 23 day Number of vontinuous hours pumped for PWL measurement 3 rmin Method of measurement: ( ) Air Line; (X) Probe; ( ) Tape; ( ) Other (Specify)Measurement ftom: (X ) Top of easing; ( ) Ground: { ) Ot-mr (Specify)1-5,ell a i ,WM Tal1 teadings fnron the highest yield well(s),4-10 ,,es-e aetlmOL 2 WELS us"ing the same well(s) each time. For P~ 15a~e~atfr@

~ e~v 3~.LSaddittional webl, felow fthi tormlat From awft ONLVSWELLS MOM*y a'noUlt Of water pumped from aquifer In thousands of gVL MONTH Monthly Method used to detemtine pwtpage TOTAL MAX. DAY AvgJDay March 43253.6 2563.3 1395.3 (X) Flow meter April 42M3.3 1786.8 1431.1 Other (Specify)May 4.3649.5 2086.3 1472.6 Use: For a consumolve use for oe2mal wsmm ,__s upply, cooling water. yrocess water for June 46320.7 2433.8 1544.4___operation at Units I &2. and irloation of July 47227.6 1876.3 1523.5 August 47554.1 2161.6 1534.0 GRAND TOTAL ANNUAL AVG. I DAY 1404.7 Average hours pumped per day-. 12.4 SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above Information is true to best of my knowledge and belief.Signed Title General Manager -Vogtle Electric Generating Plant Date IW N9I OEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT (Print or Tvae all Intormadlon)

_-' .11, 1- ýl .l&, I 1 This fcfm shall be submitted to the Division within fifteen (IS) days after the reporting peiod specified on the permit under Standard Condition No. 3 Permi-tee Southern Nuclear ratdn Company -Voille Electric Gene.rati n Plant Permit No. 017-0003 For six month period from 03-01-2001 thru 08-31-2001 This report is on the Cretaceous Sand Aquifer used by well(s) numbered:

Make-up Wells #1 and 02A, Construction Well #3, Irrigation Well #4, TactIcal Training Well #5, Training Center Well, Recreatlon Area Well, & Well TW-1.Specific Conductivity

.-16 mmhosieri stade water level (SWL) 68.9 ft. Elevation 157.1 IL Well no. MU-2A Date measumd 08-.1.01 Pumping water level (PWL) 73.0 It. Elevation 153.0 It. Well no. MU-2A Date measured 08-31-01 (Use additional sheet If necessary)

Number of hours shutdown for SWL measurement 41 min Number of continuous hours pumped for PWL measurement 193 in Method of measurement: ( ) Air Line; ( X) Probe; ( ) Tape; ( ) Other (Specify)Measurement from: ( X ) Top of casing; ( ) Ground; ( ) Other (Specify)Fnmm t.~I-5vtsa@f1 ONL.Y IWELL Pimi, -10 ~ila4 I lrUONLYU 2 WELL.S-1~m 1-15 wells40 Sol Ij OM.Y32WE.L Fr. IW i00we6s aift k 1 M O Y4 5Lr;Take madings from ft highest Yield we0(s).using the same well(s) each time. For additional wefs, ollow this format N-Monhnly amoutt of water pkuped from aquifer in thousands of gal.I Metho used to determine pumpage FRlw meter Other (Specify)Use: For a oonsrgnotvejaUse Icr eetriae sawlyv ener~rmn vz4pr nrrs ,vatgr for aweretjo of Units 1 & 2 -and irrigation of orniamental vegamt~or.

Avemrge hours pumped per day: SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE D!VJSION.I certify that the above information Is true to best or my knowledge and belief, Signed ritle Date General Manager -VOle Electric Generating Plant Y PZI TOTP_

MRR-13-200-2 14:44 I-UI'P LUJML- IL-H. lUrr-Lru DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA I .-.J 2 GROUNDWATER USE REPORT (Print or type all Inrfloriman)

This form shall be submitted to the Division within fifteen (15) days alter the reporting period specified on the permit under Standard Condition No. 3 Permiftee Southern Nuclear Operating Company -Vogtle Electri Generating Plant Permit No. 017-)003 For six month period from 09-01-2001 thru 02-28-2,02 This report is on Uhe Cretaceous Sand Aquifer used by well(s) numbered:

Make-up Wells #1 and #M Construction Well #3, Irrigation Well #4, Tactical Training well #5, Training Center Well.Recreation Area Well, & Well TW-I.Specific Conductivity mmhovcrn Static water level (SWL)Pumping water level (PWL)4659 ft.51.2 ft.Elevation 154.6 ft. Well no.Elevation 149.3 fL Well no.(Use additional sheet it necessary)

MU-1 Date measured 02-21-02 MU-I Date measured 02-21-02 Number of hours shutdown for SWL measurement 19 day Number of continuous hours pumped fkw PWL measurement 31 m"l Method of measurement( )AirLine; (X)Probq; ( )T ;( ) Other(Specify)

Measurement from: (X) Top of casing; ( Ground; ( ) Other (Specify),ob amt sto4a e -am at aemimnam m iftscaw badow'EM 1 ai toton O. MV I WSaL Take readings fram te hWe yield well(s).A= 6.10 .s"Wtn sm0i O.PYZ W84 usng Tm a rme teel(s) each time. For111 "Wb so, aemm 00& 3W.y 1.9~lltoa wells, folo this tffn~at Ffn eaWf-Asa ow.Y a WELLS Monthly amount of water pumped from aquifer in ftoda aL ef 90L MONMTXD Monthly Method sed to determine pumpage TOTAL MA. DAY Avg./Day Setember 415363.4 1 20 1512.1 (X) Flow meter October 4W3.7 1827.6 1473.3 Other (Specify)November 43613.8 1753.1 1450.5 Use: For a consurwfiwe use tw gnfam! water Deccrrnber 46081.4' 1728.5 1454.2 Qaa~ltfbI&.rlratco De~rrbet " 4,54.g" oelagn of Unit I & Z. and Iffigatlo of January 39731.1 1684.6 1281.6 .ornamental veastation.38994.6 1990.7 1392.7 258368.0 ANNUAL AVG.I DAY 1458.4 Average hours purnped per day- 11.9*GRAND TOTAL SUCH OTHER PERTINENT INFORMATION FUFANISHED BY THE PERM)TTEE OA REQUIRED BY THE DIVISION.I certify that the above information is true to best of my knowledge and belief.Signed A if A-i Title Date General Manager -Vogtle Electric Generating Plant/3? t' 0,,4 V7,-

MRR-13-2Ie&12 14:44 KLIl UUfIL ir-t.r'. *,....DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT , ...... .p(!ýrint or type all informaWo., ,..This form shall be submitted to the Division within fifteen (15) days alter the reporting period speci%d on the permit under Standard Condtion No. 3 Permittee Southern Nuclear Operating Company -Vogtle Electric Generating Plent Permit No. 017-=003 For six monthfpeyiod from 09-01-2001 thru 02-28-2002 This repott is on the Cretaceous Send Aquifer used by well(s) numbered:

Make-up Wells 41 and #2A. Construction Well #3, Irrigation Well #4. Tactical Training Well #5, Training Center Well, Recreation Area Well, & Well TW-..Specific Conductivty WIA. mimho/ciii Static, water level (SWL)Pumping water level (PWL)75.1 92.7 ft, Elevation 160.9 ft. Well no, ft. Elevation 133.3 ft. Well no.(Use additional sheet if necessary)

MU-2A Date measured 02-27-02 MU-2A Date measured 02-27-02 Number of hours shutdown for SWL measurement a days Number of continuous hour pumped for PWL measurement 72 min Method of measurement: ( ) Air Line; ( X ) Probe; ( ) Tape' ( ) Other (Specify)Measurement from: (X ) Top of casing:, ) Ground; ( ) Other (Specify))lomm S"SLubn $ft of Mee uremmsa below , _ ONLY I Take readings tr fe highest ykild well(s), F. .NLY2wE. using the same well(s) each time. For.Lt-,lONL 3 " M.y iW-s additio nial waits, fokow this form at F~wy 1S40g&-a et romONLY 4 WMLL5 Monthly amount of water trom aquifer in of gal Monthly Methon used to Wtetemine pumpage TOTAL MAX. DAY AvgJiDy (X) Flowmeter ,,,_ ,f"Othar (Specify)Use: rkaswlnMWMt -e sup*v. 22oqf water. or=ces wter Mfor___

of Upnak 1 & 2. an ritatkof GRAND TOTAL ANNUAL AVG. I DAY Average hours pumnped per day: SUCH OTHER PERTINENT INFORMATION FURNISHED BY THE PERMITrEE OR REQUIRED BY THE DIVISION.I certify that the above information Is true to best of my knowledge and belief.Signed Title Date General Manager -Vogfl Electric Generating Plant 13fl/d2d trZ-TOTRL P.04 Southern Nuclear Operating Company, Inc.P 0. 21- 12.95 3irr~iny:',m, 352V .-1295 SOUTHERN AE COMPANY ENV-02-187 Energy to Serve Your World'September 13, 2002 FEDERAL EXPRESS Votle Electric Generating Plant Ground Water Use Permit No. 017-0003 Semi-Annual Report Mr. Bill Frechette Senior Geologist Water Resources Management Branch State of Georgia Environmental Protection Division.205 Butler Street, S.E., Room 1166 Atlanta, Georgia 30334

Dear Mr. Frechette:

In accordance with standard condition

  1. 3 of the Vogdie Electric Generating Plant Ground Water Use Permit (No. 017-0003), enclosed is the semi-annual Ground Water Use Report.Additionally, due to problems encountered in measuring water levels in Make-up Well 2A, we have designated the Recreation Center well for measuring and reporting static and pumping water levels and specific conductivity required by the permit. This change was discussed with you by Ms. Amy Greene, of my staff, in a telephone call on August 30, 2002. It is understood that this change is acceptable to EPD.If you have any questions, please contact Amy Greene at (205) 992-5809.Sincerely, Wayne C. Carr, Manager Environmental Services WCC/ABG Enclosure ENV-02-187 Mr. Bill Frechette State of Georgia Environmental Protection Division Page Two bcc: J. T. Gasser (w/o)G. R. Frederick W. F, Kitchens (w/o)J. A. Bailey (w/o)I, A. Kochery (w/o)B. D, Carter (w/o)M, E. Wilder (w/o)S. Sundaram (w/o)C. M. Burlke.REES Route: T. C. Moorer / K, W. McCracken I A. H. Lovoy ES Files E.03.34 SNC Document Management

-Vogtle SEPh t2-2.0;2 12.: 19 UOGTILE TECH. SUPPOERT I', DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA' GROUNDWATER USE REPORT SNC ENU SERUJ'. 03 (Print or t- 0 infofmatori)

This.-om shall be submitted to the Division within fifteen (15) day* after the rporg period specified on the permit under Slandard Condition No. 3 ..........

.... .. ..... ......... Pmrrittee Southern Nuclear Operting Carn~pat Permit No. 017-0003 This report is on the Cretaceous Sand Voiftre Electrc.Genarating Plant For six month period from 03-01-2002 thru 08-31 -2002 Aquifer usod by wefi(s) numbered:

Make-up Wells #1 and -P2A, Consiruclion Well #3, Irrigation Well #4, Tactical Training Well #5. Training Center Well, Recreation Area Well, & Welt T7W-I.~ -.. ....a.,r,~r.,.

Spechirk Conductivity 1_50 mmhos/cm Static water level (SWL)Pumping water level (PWL)49.7 ft. Elevation 150.8 ft. WeB no.54.7 ft. Elevation 145.8 It. Well no, (Use additional sheet if necessary)

MU-! Date measured 08-14-02, MU-1 Date measured 08-14-02 Number of hours shutdown for SWL measurement 0.5 hr. Number of oontinuous hours pumped for PWL measurement 0.5 hr.Method of mresuremern ( ] Air Line: X ) Probe: ( ) Tape; ( ) Other (Sperify) from: (X )Top of casing; ( ) Ground; ( ) Other(Specify)

Obwtn and ,urit w= wme sem of mezs$raý&,C, ; in,,ul b m .w r-mm 1-6 ,,,ei a t ONLY I WEU. Take readIngs from the highest yield wells),

o..r We~LuS usng the srnE? well(s) oach time For--- I .e vYw9oaS addiflonaJ reils, follow th;s format Frun~ ifl-20 .1-a 64FNfrm ONLY 4 WELLS-r ~- -- ..rta'a~.a~fl

---...- -.rer~~J--R.=

~-4mW~~L¶WSt.¶V~4 Monthly amount of waier pumped from aquier in thousands of gal.I MONTH MAX. DAY TOTAL Monthly Avg JDay Method used to determine pumpage Marc April h 45179.6 1457.4 (X)40141 .8 1906.2 1338.1 May 39821.4 3020.9 1284.6 AJue 42286,2 2492.6 1409.5 July 36365.8 1821.6 1173.1 Augter 28336.0 1690.8 914.1 Flow meter Other (Specify)Use: for.a ononum veuu -for cen:iaLwalvr puolyo. colfUfig water,. Irnd Aatero papLoti of Unfts 1 A 2. and irricario of AMMga vqqt io GRAND TOTALANNUAL AVrl. / OAY Average hours pumped per dOyP 10.6-~ -- *-~-m=*,.

~ --- .=~==w -..-......

LSUCH OTH ER PERTINENT INFORMATION FURNISHED BY THE PERMITTEE OR REQUIRED BY THE DIVISION.I certify that the above information is true to best of my knowledge and belief.Signed Title Date x, General Manager -Vogtte Electft Generating Plant Z_

SEP-12-2002 12: 20 FRCM UOGTLE TECH. SLIPFPRT TO DEPARTMENT OF NATURAL RESOURCES STATE OF GEORGIA GROUNDWATER USE REPORT.. Pnn or type all infomn~allon$

SNC ENU SERU P. 04 This form shall be submitted to the Division within fifteen (15) days after he repongperiod specified on the permit under Standard Condition No- S Pem'ntiee Southem Nuclear 6perating Company -Vogtle Ele6tric Generating Plant, Permit No. 0t7.,OO3 ........ For six month period from 03,Ol-2002 thru 08_-31-M02 This repon is on the Cretaceous Sand Aquifer used by well(s) numbered:

Make-up Wells 41 and 4*2A, Conszruction Wela #3. Irrigation Well #4, Tactical Training Well #5, Training Center Well, Recreafion Aroa Well. & Wail TW.1.Speifi Cndutiity

_5 mmhoa'cm Static water level (SWL) 33.8 ft. Elevation 134,4 fL Well no. Rec Ctr Date measured 08-23-02 Pumlping water levvl (MWL) fa t. Elevation

_114.6 _ ft. Well no. Rec dir Date measured O8.23.ara (Use additional sheet if necessary)

Number of hours shutdown for SWVVL measuremGnt o.s hr. Number of continuous hourn pumped for PW_ measurement 0.5 hr.Method of measurement ( ) AirLine; ( X) Probe; ( ) Tape; ( ) Other (Specify)Measurement from: (X ) Top of casing; ( ) Ground; ( ) Other (Specify)'obwn" and Au.,l eXM~~ W"o 01 "a~wroana W nd" o 1.5 wwbI a so fm M~, Ny I WEIA Fr~~ .-IDmllaa ae b~nOt4IY 2 WE.LLS From 1 I-1 6 ,wailse nst fmm~ ONLY 3 WELLS Frmn 16-20 weleba 'am hornI ONLY 4 WGLIA-Take readings frnm the highest yield wsil(s].using the same well(s) each time. ror addihional wells, follow this forrial I Montthly anorUi Of walefr pumped from aquffet in thousands al 9W, M'arnlhlv Method used to determine purnpHge X)Flow meter Other (Specify)Use: Empwwiý R 2wation of Unf 1.& 2. i nd irrszgpr.orwnew Average houM pumped per day: SUHOHRPRIETINFORMATION FURNISHED BY THE ORQLIE D BY TIE SON.I cerofy that the above information Is true to best of my knowledge and belief.Signed, Title Dale?r-9.tt.ýj.....2Gelneral Manager -Vogule Electric Generating Plant -/zaZ TO~TAL P.PR4 01/29/2003

13. 53 7068263787 SVC BLDG 2ND FLOOR PAGE 04 Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period specified on the a1 .. .teal .. .,JL ...I .Ii5 .& Le'L .J. J r. *tLl -rouiaugwater w iarnarwil rarmiT undrer iSanuaru I..Condition two. I, (Print or to-* ALL Information)

I Contact Person: W. C. Carr Pone: (20S) 992-6387 Emi: wcrr@southernco.com Company / Permitt6e -Southern Nuclear Operating Company / Vogtle Electric Generating Plant Address: P. O. Box 1295, Birmingham, Alabama 35201 (No, and Street) (City) (State)GW Withdrawal Permit No.: 017 -0003 For six (6) month period from July 2002 thru December 2002 County where well(s) is located: Burke County, GA Thi-s repor s on the .eaouSndaquifer(s) used by well(s) numbered _U-July36365800 gal 1173100 gal [ Flow meter August /2002 T28338000 gal " 914100 gal C1 Other (specify below)September

/2002. 25129700 gal 837700 gal October' .12002 26532400 gal 855900 gal November /2002 , 31362400 gal 1045400 gal December /2002 32137900 gal, 1036700 gal Average hours pumped Static water level (SWL)*** 50.8 ft. Elevation 149.7 ft. Wen no. HU-I Date measured 12-04-02 Pumping water level CPWL)**W*

55.7 ft. Elevation 144.8. ft. 'Well no, MU-1 " Date measured 12-04-02[Use additional sheet If necessary)

Number of hrs shutdown for SWL measurement 058. Number or continuous hrs pumped for PWL measurement DE., I Method of measurement:

E Air line E Probe [] Tape El Other-(specify)

-Measurement from- Ton of casino Fn Ground n Other (sIedfvl)is true to the best of my knowledge.

/Ocober 2002

'01/29/2001, 1:3: 53 7@B6[2637;ý7 SVJC BLDG 2ND FLOOR FE~PAGE 03 to !-at Prate ton en ..Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period specified on the Groundwater Withdrawal Permit under Standard Condition No. 3.____ " ** (Print or type ALL Informnation)

Address: P. 0. Box 1295, Birmingham, Alabama 35201 ote er St2ec2 N (City) gal N/A(710 October /2002. N/A gal N/A l B o SysteAam ITNtA f .gal Average hours pumped N/A 100 gal N/A gal Flowmeewater level (SWL)**`*

30. f. Eevton 137.3 "ft. IWell no. lRec. Date meaured 12-05-02 Pumpingwter lve (FWL)*;; 49.9 ft. /Elevaton 118.3 ft. Wel no. Re. DaOth mesuedf 1205--02-/2002 .......al N/A gal Avug hor Is npumped Number of hrs shutdown for SWL measurement D050. Number of continuous hrs pumped for PWL measurement 2 ,Q.Method of measurement:

C Air line i Measurement from; [ Top of(0 Probe _E Tape 01 Other (specify)Is true to the best of my knowledge.

Octber 2002 Vogtle Electric Generating Plant -Permit No. 017-0003 Annual Specific Conductance*

Obtained from;Obtained on: Value (pmhos/cm):

Obtained from: Obtained on: Value (pmhoslcm):

MU-1 Well 08/14102 150 Rec Well 08/23/02 405*Submitted wth previous report on 09M13/02.

I Deparnimsi of Nafturl Rfs4mmms0 Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period specified on the Groundwater Withdrawal Permit under Standard Condition No. 3.(Print or type ALL lnfortnation)

Contact Person: W. C. Carr P"hone: (205) 992-67 wccarr@sduthernco.com company / Permittee:

Southern Nuclear Operating Company Vogtle Electric Generating Plant Address: P. 0. Box 1295, Birmingham, AL 35201 (No, and Street) (City) (State) (Zip)GW Withdrawal Permit No.: 017 -0003 For six (6) month period from lanuary 2003 thru June 2003 County where well(s) Is located: Burke County. GA This report is on the Cretaceous Sand aquifer(s)

Used by well(s) numbered _U_, LMIJ-2A _ W NdI4 9 9 .-..

  • C -January /2003 21627400 gal 697700 gal h Flow meter February /2003 20607400 gal 736000 gal [1 Other (specify below)March /2003 25447800 gal 820900 gal April /2003 21725800 gal 724200 gal May /2003 1 26062400 gal 840700 gal.lune /203* .21364800 gal 1712200 gal .Average hours pumped*136835600 gal pe-a III§3IIII Static water level (SWL),** 45.9 ft. Elevation 154.6 ft. Well no. MU-1. Date measured 06-05-03 Pupn wae ee PWL)*** 50.2 ft. lElevation 150.3 ft.I Well no. MU-.1 Date measured 06-05-03" (Use addbtonal sheet If necary)Number of hrs shutdown for SWL measurement .J5. Number of continuous hrs pumped for PWL measurement 0.5.Method of measurement:

[3 Air line 0 Probe E] Tape E3 Other (specify)Measurement from: 0 Top of casing 0I Ground L] Other (specify)Obtai an sub i aprorit set of wae lee mesrmet siniaedblw I I 9~

  • 3 9 '9*.1* -I 4 '.47b to the best of my knowledge.

sld October 2002 Dcpaflmenl woi 4*uraJ ftolorcris Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period specified on the Groundwater Withdrawal Permit under Standard Condition No. 3.Contact Person: W. C. Cartr " J Phone-, (205) 992-6387 Email., wccarr@southernco.oom company / Permittee:

Southern Nuclear Operating Company./Vogtle Electric Generating Plant Address: P.O0. Box 1295, Birmingham, AL 35201_jNo. and Street -- T (city) .(state),, (ZIP)GW Withdrawal Permit No.: 017 -0003 JFor six (6) month period from January 2003 thru June 2003 County where well(s) Is looated: Burk-e County, GA-..This report is on the Q2etaceous aquifer(s) used by well(s) numbered tjU-1 Mon th/Yea (in0 NAgl /gallons Metho d usedter Janarch /2003 N/A gal _N/A gal N lw ee Febrap ry /2003 N/A gal N/A gal E te seiyblw Marc /2003 N/A gal N/A gel June /2003 N/A gal NIA! gal Average hours pumped N/A gal Per Ay 1Stati7c waterle~vel (5WQ.*** 24.6 ft. Elevation 136 f. Well n.Rec. Date measured 06,-05-03 Pumping water level (PWI_)***

44.1 ft. Elevation 124.1 ft. Well no. Rec. Date measured 06-05-03 (Use addlt~nal shee If necessary)

Number of hrs shutdown for SWL measurement U,, Number of continuous hrs pumped for PWL measurement Method of measurement:

[]Air line [] Probe El Tape El Other (specify)Measurement from: Z Top of casing [I Ground n Other (specify)Obai an subi aprpit sets of wae lee mesreet as iniae below: 3. 0 I iS 35 , .-W -I ceirtify that th oaio stu to the best of my knowledge.

Signed " " "- "/ ---Chemistry Superintendent Date Z 1 sld October 2002 Vogtle Electric Generating Plant- Permit No. 017-0003 Annual Specific Conductance Obtained from: MU-I Well Obtained on: -06/05/03 Value (pmhos/cm):

175 Obtained from: Rec Well Obtained on: 06/05/03 Value (pImhos/cm):

230 Ilpal'mMmt ol NMuleiwl Rewrt Groundwater Use Reporta This form shall be submitted to the Division twice each year, within the reporting period spedfied on the Groundwater Withdrawal Permit under Standard Condition No. 3.(Print or ALL Information Contact Person: W. C. Carr Phone: (205) 992-6387 Email: wccan'@southemco.con Company I Permittee:

Southern Nuclear Operating Company / VogUe Electric Generating Plant Address: P. 0. BOX 1295, Birmingham, AL 35201 (No. and Sre y State (ZiP)GW Withdrawal Permit No.: 017 -0003 For six (6) month period from July 2003 thru December 2003 County where well(s) Is located: Burke County. GA This report is on the Cretaceous Sand aquifer(s) used by well(s) numbered MU-i-*lN- --ndlIW-4 (in/ i galn)Mto sdt July /2003 29006400 gal 935700 gal A] lo meter-August /2003 28191900 gal 909400 gal 3 []other (specify below)-September.

12003 28645900 gal 954900 gal-October /2003 25512600 gal .823000 gal November /2003 20453700 gal 1681800 galI December /2003 ga 890gal Average hours pumped S S ti w 8 1156111000 gal per day ZA.,ai ae evl(W 5.1 ft Elevation 155.4 ft.. Well no. MU-1 Date measured 12-05-03.Pumping w~ater level (PWL)*** 49.8 ft:. Elevation 150.7 ft. Well no. MU-Z Date measured 12-05-03 (Use sheet I necý)Number of hrs shutdown for SWL measurement U.. Number of continuous hrs pumped for PWL measurement 0.Method of measurement:

C Air line ED Probe [E Tape 0 Other (specify)rn'-'nrn( Wrn, ri I f !!r 11,iu ! r !h rI a~~Obtain and submit appropriate sets of water level measurements as indicated below;a--And such other pertinent information submitted by the applicant or required by the Division.I certiht t vJ tn is true to the best of my knowledge.

Signed /B. Dudley Carter Chemistry Superintendent Title-January 16, 2004 Date 9entm pro-tw ieR cs, lDpartmoe of ftlwal ior~Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting petiod specified on the Groundwater Withdrawal Permit under Standard Condition No. 3.Cotc esn .C afPoe 25 9%8 Ema~il: woorr@southemco.com Company / Permittee:

Southern Nuclear Operating Company / VogUe Electric Generating Plant Address: P. 0. Box 1295, Birmingham, AL 35201 (No. and Street) (ity) (State) (p GW Withdrawal Permit No.: 017- 0003 [For six (6) month period from July 2003 thru December 2003 SCounty/where well(s) Is located: Purke C~untv GA ...: This report Is on the Cretaceous.and aquifer(s) used by well(s) numbered M July /2003 N/A gal N/A gal 0 Flow meter August /2003 N/A gal N/A gal 0 Other (specify below)September

/2003 N/A gal N/A gal October /2003 N/A gal N/A gal November /2003 N/A gal N/A gal December /2003 N/A gal /A gal Average hours pumped NA gale per day WeA Static water level (SWL)*** 25.0 ft. Elevation 143.2 ft. Well no. Rec. Date measured 12-05-03 Pumping water level (PWL)*** 44.7 ft. Elevation 123.5 ft. Well no. Rec. Date measured 12-05-03 (Use additional sheet If necessary)

Number of hrs shutdown for SWL measurenment

0. Number of continuous hrs pumped for PWL measurement 05.Method of measurement:

0 Air line 9 Probe [I Tape 0 Other (specify)I I Measurement from;Z Top of casing [] Ground El Other (specify)Obai an sumi aprorit set of wae lee mesreet as indicatedbelow-And suc ote pertinet inomto sumte by th aplcn or reuie by th Dvsion I certify that thgabove infration is true to the best of my knowledge.

Signed -B. Dudley Carter(Chemistry Superintendent Title January 16, 2004 Date Vogtle Electric Generating Plant -Permit No. 017-0003 Annual Specific Conductance Obtained from: MU-1 Well Obtained on: 12J05/03 Value (pmhos/cm):

138 Obtained from: Rec Well Obtained.on:

12105/03 Value (pmhos/cm)" 291 Southern Nuclear Operating Company, Inc.Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTH ERN Lii COMPANY Energy wServe YourWold'File: E.03.34 Log: EV-04-1284 July 28, 2004 FEDERAL EXPRESS Voqtle Electric Generating Plant Ground Water Use Permit No. 017-0003 Semi-Annual Report Mr. Bill Frechette Municipal

& Industrial Groundwater Permitting Unit State of Georgia Environmental Protection Division 2 Martin Luther King, Jr. Drive SE East Tower, Suite 1058 Atlanta, Georgia 30334

Dear Mr. Frechette:

In accordance with standard condition

  1. 3 of the Vogtle Electric Generating Plant Ground Water Use Permit (No. 017-0003) and Rule 391-3-2-.08, enclosed is the semi-annual Ground Water Use Report for the first half of 2004. Please note that the amount reported for January 2004 is significantly higher than other months in the reporting period. It has been determined that the totalizer for Well MU-1 malfunctioned during the month and actual water used was substantially less than reported.

There is not enough information available to estimate the effect of the totalizer malfunction on water usage in January 2004. Southern Nuclear Operating Company is therefore conservatively reporting the value as shown on the totalizers.

Although the reported value is substantially higher than the actual use, no permit limits were exceeded.

The totalizer was repaired on January 27, 2004 and subsequent values reported are correct.If you have any questions, please contact Amy Greene at (205) 992-5809.Sincerely, Wayne C. Carr, Manager Environmental Services WCC/ABG:ahl 2

Enclosure EV-04-1284 Mr. Bill Frechette State of Georgia Enivironmental Protection Division.Page Two bcc: P. D. Rushton (w/o)W. F. Kitchens A. Harris (w/o)C. L. Buck (w/o)S. Sundaram (wlo)D. G. Goodwin T. D. Blalock (w/o)J. B. Wetherington (w/o)SNC Document Management

-Vogtle (with receipt)/

0710772004 14:57 87/7?24 1:57 70GS263787 SVC BLDG 2ND FfLOUR PAGE 07/Groundwater Use Report This form shall be submitted to the Dtvision twice eaich year, within the reporting period spedfied on the Groundwater Withdrawal Permit under Standard Condition No. 3.Company / Permftte;:

Souftern Nuclear Operating Company I Vogtle Ekxtrk Generatng Plant Address, P. 0.,Box 1295, Birmingham, AL 35201-I,I (No,..and Stby , craty) (SRIeL ... .czp)GIN Witdrllawal Permkl No.: 017 -0 003 For skx (6) month period from January 2004, thru June 2004 County where well(s) Is located: Burke County, GA This report is on the CretWaceu Sand _ aquffer(s) used by well(s) numbered M" Apr(in ci0 0880 alos) Meho used0 to Janar /2004 325720o1 ga 98 lw ee June /2004 120,557900 0 1665300 gal Average hours Pumped I4U5177700 gal *e da ".StatkC wat0er l.eve (SWL)*** 44.9 ft. Elevation 155.6 no, MU-1 Daet measured 06-08-04 Pumping water leIe (PWL)*** 91.4 Elevatlon 149.1 ft. iWeb no. MU-1 Vate measured Number of hr shutdown for S'WL nmeasurernent 0., Number of continuous hrs pumped for PWL meas.urement 94, Method of measurement:

[I Air line N] Probe [I Tape El Oter (spedhcy)Ntfsremqnw rnmn:.Too of caslna o Ground [1 Other (soedfy)Obai ndsib i aprol Of-t~ee -waueet as inicte -t--- --An suc ote petnn nomto4umte yLi apiato eurdb iiin I certify that the above information Is truemto the best of my knowledge.

  • Xgml Chemistry Manage Date/ratd Ocbmt 2002 r 07/bW2004 14.57 7066263787 SVC BLDG 2ND FLOOR PAGE 08 1 U A"WeNd tow-low Groundwater Use Report This form shall be submitted to the Division twice each year, wltin the reporting period spedfled on the Groundwater Withdrawal Permit under Standard Condition No. 3.?Pruntor tye ALLI-nformation)

Contt Person: W. C. Carr mPhone: (205) 992-6387 1 Email: wccarr@souternmco.com Company / Permittee:

Southern Nudear Operating Company I VogUe Electric Generating Plant Address: P. 0. Box 1295, Birmingham, AL 35201 (No. qad S-e,.-GW Withdrawal Permit No.: 017 -0003 =For sbi (6) mont h period from January 2004 thru June 2004 County -wWeO well(s) Is located; Burie County, GA This report Is on the Qreo=eos Sand aquilfar(s) used by well(s) nunmbered

_M "-January /2004 N/A gal lnA gal e how mtedr February /2004 N/A Lai N/A gal El Other (specify below)March /2004 N/A gal N/A gal Apdl /12004 N/A pa) N/A gal may /2004 N/A gal N/A gal June /2004 N/A gl N/A OW Average hours pumped StE it water level (SWL)**= 25.3 f t. E&vathn 142.7 ft., Well no. REQ. Date measured 06-080,M Pumping water level PWVL)*** 45,2 ft:. ELevation 123.0 ft. Well n. RE Date measured 06-0" [(U se a d dld i & m e if n e c a g imy ) I Number of hrs shutdown for SWL measurement

0. Number of continuous hrs pumped for PWL measurement 0.5.Method of measuremnt; 0" Air line ' Probe El Tape ] Other (specfy))/Measurement from: 0 Top of casing 0 Ground D Other (specify)4 -4 1: Obai an -umi a.rp'a seso ae-eelmaue et.s ni dblw An suc ote puann inomto sumte by th apltat rrrt db iviin I certfy that the above Information is true to the best of my knowledge.

Cli Buck ChemlsWr Manage Date i ! R 1 1 1 111 1 Octobw 2002 Envfronmental Protection of ,Nat*uta!

fl.MIurU%.

.' Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period, specified on the Groundwater Withdrawal Permit under Standard Condition No. 3.-(Print or lyeALL information)

Contct erso: Tm MorerPhon:

(05)92-807 Email: tcmoorer@southernco~coim momrpany / Peermittee:

Southern Nuclear Operating Company /Vogtle Electric Generating Plant '[Address:

P. 0. Box 1295, Birmingham, AL 35.201--(No. and sreet) (City) (State) 00 GW Withdrawal Permit No.: 017 -0003 For six (6) month period from July 2004 thru December 2004 C~unty where well(s) is located: Burke County, GA This report is on the Cretaceous Sand .aqufer(s.

used by well(s) numberedm July /2004 30498100 gal 983800 gal N Flow meter August /2004 29187600 gal 941500 ' gal -l Other (specify below)September

/2004 21705900 gal 723500, gal _October /2004 21755700 gal 701800 gal November /2004 21449200 gal 715000' gal December 12004 20865900 gal 673100 gal Average hours pumped Six Month -Graind. Total 145462400 gal per day 6.6 Static water level (SWL)*** 46.0 ft. Elevation 154.53 ft. Well no. MU-i Date measured 12-02-04 Pumping water level (PWL)*** 50.2 ft. Elevation 150.33 ft. *Well no, MU-i Date measured 12-02-04 (Use additional sheet If necessary)

Number of hrs shutdown for SWL measurement

0.5. Number

of continuous hrs pumped for PWL measurement 0.5.Method of measurement:

El Air line [ Probe 0 Tape El Other (spedfy)Measurement from: [ Top of casing El Ground -- Other (specify)FrOtnl-,vndsb

-a osatfpomONL WEii level .,s'ements as i"'a" b"" w 'Frm 1u-5. wetl a s ONLY 2 WELL 'aeldns freac hte. r pat Is firorn th .4S4E. the Frain1-wls 6- a efm~mONLY32WELL e aro 1-0wl s & -trom ONLY 3 WELL well(s) each time. Fror Oa 11A ,jfirwt risrfi~t.ar ~ U-2 Wel a .e~o ak 4 WEL =0~ a-I certify that the above information is true to the best of my knowledge.

Signed --Clifton L. Buck, Chemistry Manager.Title 01-05-05 Date Return Report To: Georgia Envionmnental Protection Division M&I Groundwater Unit Floyd Tower East, Suite 1058 2 Martin Luther Kingjr. Dxive Atlanta, Georgia 30334 October 2002 Environmental Protection

.,. ~~~Depanflmnr 6I N~ilutral

.: Groundwater Use Report This form shall be submitted to the Division twice each year, within the reporting period'specifed on the Groundwater Withdrawal Permit under Standard Condition No. 3.'c Pone 9Email tcmoorer@ssouthernoscom Company / Permitnee:

Southern Nuclear Operating Company f Voge Electric Generating Plant en Address: P.O0. Box 12e5, Birmingham, AL P5201.(No. and Street) (oty)" (stat)(zp GW Withdrawal PermitNo.:

017 -0003 c i For six (6) month pedal from July 2004 thru December 2004 This report Is on the CretaCeS tS TArd aquifer(s) used by well(s) numbered MU-I (i gall"ons)Metho d usedter r gae gal o Other (speify below)Sgal agal..../ ..gal gal,/ 'gal gal I/gal gal jAverage hburs pumpedMonth G n..doa gal ' " p~er day Static water level (SWL)**" 28 ft. Elevation 140.2 fL iWell no. Rec Date measured 12-02-04 Pumping water level (PWL)*** 47,4 ft. Elevation 12D.8 ft. Well. no. Rec Date measured 12-02-04 (Use additional sheet if necessary)

.Number of hrs shutdown for SWL measurement Number of continuous hrs pumped for PWL measurement 05 Method of measurement:'

El Air line [] Probe E] Tape El Other (specify)From 16-20 wels -a 3d ro ONL .... ...W.ELL ". .';.. ..::vir. U 5.-i er~ Y~i i. ~,4i1, ~~jj~. 51 i ~ UP pet UftMom [a R I.'I.y ,Ie ap .1 ( IrI' V114 U nt t15(5 imun I certify that the above information is true to the best of my knowledge.

Signed ' ...Clifton L. Buck, Chemistry Manager Title 01-05-05 Date.Return Report To: Georgia Environmental Protection Division M&l Groundwater Unit Floyd Tower East, Suite 1058 2 Martin Luther King Jr. Drive Atlanta, Georgia 30334/].October 2002 Vogtle Electric Generating Plant -Permit No. 017-0003 4 Annual Specific Conductance Obtained from: MU-1 Well Obtained on: 12/02V04 Value (pmhos/cm):

174 Obtained from: Rec Well Obtained on: 12/02/04 Value (pmhos/cm):

170 7.