MONTHYEARNL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0038, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2024-02-0202 February 2024 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-21-0399, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20202021-04-26026 April 2021 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2020 ND-21-0366, Submittal of Pressure and Temperature Limits Report2021-04-14014 April 2021 Submittal of Pressure and Temperature Limits Report NL-20-0548, Submittal of Annual Radiological Environmental Operating Reports for 20192020-05-13013 May 2020 Submittal of Annual Radiological Environmental Operating Reports for 2019 NL-20-0419, Edwin I.Hatch Nuclear Station, Units 1 & 2; Joseph M. Farley Nuclear Station, Units 1 & 2; and Vogtle Electric Station, Units 1 & 2 - Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports2020-04-27027 April 2020 Edwin I.Hatch Nuclear Station, Units 1 & 2; Joseph M. Farley Nuclear Station, Units 1 & 2; and Vogtle Electric Station, Units 1 & 2 - Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports Fo NL-19-1126, Modified NPDES Permit2019-09-19019 September 2019 Modified NPDES Permit NL-18-1516, Plant. Units 1 and 2 - NPDES Permit Resubmittal2018-12-19019 December 2018 Plant. Units 1 and 2 - NPDES Permit Resubmittal NL-18-0558, Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 20172018-04-25025 April 2018 Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2017 NL-18-0421, Results of Augmented Radiological Environmental Monitoring Program for the Years 2008 Through 20172018-03-29029 March 2018 Results of Augmented Radiological Environmental Monitoring Program for the Years 2008 Through 2017 NL-18-0237, Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report2018-02-22022 February 2018 Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report NL-17-1441, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2017-08-23023 August 2017 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-17-0845, Submittal of Annual Radiological Environmental Operating Reports for 20162017-05-15015 May 2017 Submittal of Annual Radiological Environmental Operating Reports for 2016 NL-17-0580, and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 20162017-04-26026 April 2017 and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2016 NL-16-0741, Annual Radiological Environmental Operating Report for 2015 - Page 1 of 22016-05-16016 May 2016 Annual Radiological Environmental Operating Report for 2015 - Page 1 of 2 ML16145A3782016-05-16016 May 2016 Annual Radiological Environmental Operating Report for 2015 - Page 2 of 2 NL-16-0644, Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 2015 NL-16-0651, Annual Non-Radioactive Environmental Operating Reports for 20152016-04-27027 April 2016 Annual Non-Radioactive Environmental Operating Reports for 2015 NL-16-0258, ISFSIs - Annual Radioactive Effluent Release Report2016-02-25025 February 2016 ISFSIs - Annual Radioactive Effluent Release Report NL-15-0877, Submittal of Annual Radiological Environmental Operating Reports for 20142015-05-15015 May 2015 Submittal of Annual Radiological Environmental Operating Reports for 2014 ML15125A0542015-04-30030 April 2015 J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014 NL-15-0803, J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 20142015-04-30030 April 2015 J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014 ML15125A0562014-12-31031 December 2014 E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 1 NL-15-0803, E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 12014-12-31031 December 2014 E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 1 NL-15-0803, Annual Radioactive Effluent Release Report for 2014, Enclosure 32014-12-31031 December 2014 Annual Radioactive Effluent Release Report for 2014, Enclosure 3 ML15125A0582014-12-31031 December 2014 J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 2 NL-15-0803, J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 22014-12-31031 December 2014 J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 2 NL-14-0740, Annual Radiological Environmental Operating Reports for 20132014-05-13013 May 2014 Annual Radiological Environmental Operating Reports for 2013 NL-14-0658, Annual Non-Radiological Environmental Operating Reports for 20132014-04-29029 April 2014 Annual Non-Radiological Environmental Operating Reports for 2013 NL-13-1006, Annual Radiological Environmental Operating Reports for 20122013-05-15015 May 2013 Annual Radiological Environmental Operating Reports for 2012 NL-13-0889, Annual Radioactive Effluent Release Report for 20122013-04-30030 April 2013 Annual Radioactive Effluent Release Report for 2012 NL-13-0745, Submittal of Annual Non-Radiological Environmental Operating Reports for 20122013-04-30030 April 2013 Submittal of Annual Non-Radiological Environmental Operating Reports for 2012 NL-13-0849, Post Accident Monitoring Report2013-04-26026 April 2013 Post Accident Monitoring Report NL-12-0773, Annual Non-Radiological Environmental Operating Reports for 20112012-04-24024 April 2012 Annual Non-Radiological Environmental Operating Reports for 2011 NL-11-0853, Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-00062011-05-24024 May 2011 Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-0006 NL-11-0888, Annual Radiological Environmental Operating Reports for 20102011-05-12012 May 2011 Annual Radiological Environmental Operating Reports for 2010 NL-11-0865, Annual Non-Radiological Environmental Operating Reports for 20102011-04-30030 April 2011 Annual Non-Radiological Environmental Operating Reports for 2010 NL-11-0811, Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through End2011-04-29029 April 2011 Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through End NL-10-0905, Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 ML1013905352010-05-14014 May 2010 Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0905, Enclosure 3 - Vogtle, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 3 - Vogtle, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0905, Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 ML1013905332010-05-14014 May 2010 Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0839, Submittal of Annual Non-Radiological Environmental Operating Report for 20092010-04-28028 April 2010 Submittal of Annual Non-Radiological Environmental Operating Report for 2009 2024-05-10
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0217, License Amendment Request: Source Range Neutron Flux Doubling Function Applicability2024-11-0101 November 2024 License Amendment Request: Source Range Neutron Flux Doubling Function Applicability NL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator NL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 2024-09-09
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 SOUTHERN COMPANY A.
May 1, 2008 Energy to Serve Your Worlds.
Docket Nos.: 50-321 50-348 50-424 NL-08-0726 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Annual Non-Radiological Environmental Operating Report for 2007 Ladies and Gentlemen:
In accordance with Subsection 5.4.1 of the referenced plants' Environmental Protection Plans (Appendix B to the Operating Licenses), Southern Nuclear Operating Company hereby submits the Annual Non-Radiological Environmental Operating Reports for 2007.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely,
<jJ~Q./~
k-. J. M. Godfrey
~ - - Manager, Environmental Affairs JMGrrwS/daj
Enclosures:
- 1. Hatch Annual Non-Radiological Environmental Operating Report for 2007
- 2. Farley Annual Non-Radiological Environmental Operating Report for 2007
- 3. Vogtle Annual Non-Radiological Environmental Operating Report for 2007
- u. S. Nuclear Regulatory Commission NL-08-0726 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; CHA02.004; CVC7000; LC# 14763 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. R. A. Jervey, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle State of Alabama Mr. K. E. Whatley, Department of Public Health, Division of Radiation Control State of Georgia Mr. J. L. Setser, Department of Natural Resources American Nuclear Insurers Mr. R. A. Oliveira
Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Annual Non-Radiological Environmental Operating Report for 2007 Enclosure 1 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Report for 2007
Enclosure I Page I of2 Annual Non-Radiological Environmental Operating Reports for 2007 EDWIN I. HATCH NUCLEAR PLANT - UNITS 1 AND 2 I. Introduction This report is submitted in accordance with Subsection 5.4.1 of the Edwin I. Hatch Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating Licenses DPR-57 and NPF-5. This report describes implementation of the Environmental Protection Plan for the calendar year 2007.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period
- 1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with the State of Georgia National Pollutant Discharge Elimination System (NPDES) Permit GA0004l20; there was no additional requirement for aquatic monitoring during 2007.
- 2. Terrestrial Monitoring - Terrestrial monitoring is not required.
- 3. Maintenance of Transmission Line Corridors
- 1. Herbicide treatment and danger tree cutting was performed on the Hatch-Vidalia and Hatch-Baxley corridors. The herbicide treatment consisted of a combination of EPA-registered and State-approved herbicides.
- 2. Danger tree cutting was performed along the Hatch-Offerman, Hatch Bonaire, Hatch-Eastman, Hatch-Thalmann, Hatch-North Tifton and Hatch-Douglas corridors.
B. Comparisons of the 2007 Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Nonradiological Environmental Monitoring Reports These comparisons were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No.
GA0004l20.
C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during 2007. .
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during 2007.
Page 2 of2 Annual Non-Radiological Environmental Operating Reports for 2007 E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments in 2007 which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted in 2007.
Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Annual Non-Radiological Environmental Operating Report for 2007 Enclosure 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Report for 2007 Page 1 of 1 Annual Non-Radiological Environmental Operating Reports for 2007 JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 I. Introduction In accordance with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, this report is submitted summarizing implementation of the Environmental Protection Plan for calendar year 2007.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period
- 1. Aerial Remote Sensing - Aerial Remote Sensing is no longer required.
- 2. Herbicide Application - There is no reporting requirement associated with this condition.
- 3. Land Management - There is no reporting requirement associated with this condition.
B. Comparison of the 2007 Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Non-Radiological Monitoring Reports These comparisons were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No.
AL00246 19.
C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during 2007.
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during 2007.
E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Section 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments in 2007 which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted in 2007.
Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Annual Non-Radiological Environmental Operating Report for 2007 Enclosure 3 Vogtle Electric Generating Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Report for 2007 Page 1 of2 Annual Non-Radiological Environmental Operating Reports for 2007 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 I. Introduction In accordance with Subsection 5.4.1 of the Vogtle Electric Generating Plant (VEGP)
Environmental Protection Plan (Nonradiological), Appendix B to Facility Operating License Nos. NPF-68 and NPF-81, this report is submitted describing implementation of the Environmental Protection Plan for the calendar year 2007.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period
- 1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with State of Georgia National Pollutant Discharge Elimination System (NPDES) Permit GA0026786; there was no additional requirement for aquatic monitoring during 2007.
- 2. Terrestrial Monitoring - Terrestrial monitoring is not required.
- 3. Maintenance of Transmission Line Corridors a) Herbicide treatment and danger tree cutting was performed on the Warthen-Scherer and Vogtle-West McIntosh corridors.
b) Danger trees were cut along the West McIntosh-Thalmann, Vogtle Warthen, Vogtle-SCE&G and VEGP-Goshen, corridors as necessary.
c) All routine maintenance activities within the designated cultural properties located along the transmission line corridor were conducted in accordance with the Final Cultural Resources Management Plan.
This plan was developed in conjunction with the Georgia Historic Preservation Officer.
- 4. Noise Monitoring - There were no complaints received by Southern Nuclear Operating Company during 2007 regarding noise along the VEGP-related, high-voltage transmission lines.
B. Comparison of the 2007 Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Monitoring Reports These programs were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No. GA0026786 referenced in Section A above.
Page 2 of2 Annual Non-Radiological Environmental Operating Reports for 2007 C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during 2007.
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during 2007.
E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments in 2007 which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted in 2007.