MONTHYEARNL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-21-0399, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20202021-04-26026 April 2021 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2020 ND-21-0366, Submittal of Pressure and Temperature Limits Report2021-04-14014 April 2021 Submittal of Pressure and Temperature Limits Report NL-20-0548, Submittal of Annual Radiological Environmental Operating Reports for 20192020-05-13013 May 2020 Submittal of Annual Radiological Environmental Operating Reports for 2019 NL-20-0419, Edwin I.Hatch Nuclear Station, Units 1 & 2; Joseph M. Farley Nuclear Station, Units 1 & 2; and Vogtle Electric Station, Units 1 & 2 - Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports2020-04-27027 April 2020 Edwin I.Hatch Nuclear Station, Units 1 & 2; Joseph M. Farley Nuclear Station, Units 1 & 2; and Vogtle Electric Station, Units 1 & 2 - Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports Fo NL-19-1126, Modified NPDES Permit2019-09-19019 September 2019 Modified NPDES Permit NL-18-1516, Plant. Units 1 and 2 - NPDES Permit Resubmittal2018-12-19019 December 2018 Plant. Units 1 and 2 - NPDES Permit Resubmittal NL-18-0558, Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 20172018-04-25025 April 2018 Annual Non-Radiological Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2017 NL-18-0421, Results of Augmented Radiological Environmental Monitoring Program for the Years 2008 Through 20172018-03-29029 March 2018 Results of Augmented Radiological Environmental Monitoring Program for the Years 2008 Through 2017 NL-18-0237, Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report2018-02-22022 February 2018 Independent Spent Fuel Storage Installation - Submittal of 2017 Annual Radioactive Effluent Release Report NL-17-1441, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2017-08-23023 August 2017 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-17-0845, Submittal of Annual Radiological Environmental Operating Reports for 20162017-05-15015 May 2017 Submittal of Annual Radiological Environmental Operating Reports for 2016 NL-17-0580, and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 20162017-04-26026 April 2017 and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2016 ML16145A3782016-05-16016 May 2016 Annual Radiological Environmental Operating Report for 2015 - Page 2 of 2 NL-16-0741, Annual Radiological Environmental Operating Report for 2015 - Page 1 of 22016-05-16016 May 2016 Annual Radiological Environmental Operating Report for 2015 - Page 1 of 2 NL-16-0644, Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 2015 NL-16-0651, Annual Non-Radioactive Environmental Operating Reports for 20152016-04-27027 April 2016 Annual Non-Radioactive Environmental Operating Reports for 2015 NL-16-0258, ISFSIs - Annual Radioactive Effluent Release Report2016-02-25025 February 2016 ISFSIs - Annual Radioactive Effluent Release Report NL-15-0877, Submittal of Annual Radiological Environmental Operating Reports for 20142015-05-15015 May 2015 Submittal of Annual Radiological Environmental Operating Reports for 2014 ML15125A0542015-04-30030 April 2015 J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014 NL-15-0803, J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 20142015-04-30030 April 2015 J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014 NL-15-0803, E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 12014-12-31031 December 2014 E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 1 NL-15-0803, J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 22014-12-31031 December 2014 J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 2 ML15125A0582014-12-31031 December 2014 J. M. Farley - Annual Radioactive Effluent Release Report for 2014, Enclosure 2 ML15125A0562014-12-31031 December 2014 E. I. Hatch Radioactive Effluent Release Reports for 2014, Enclosure 1 NL-15-0803, Annual Radioactive Effluent Release Report for 2014, Enclosure 32014-12-31031 December 2014 Annual Radioactive Effluent Release Report for 2014, Enclosure 3 NL-14-0740, Annual Radiological Environmental Operating Reports for 20132014-05-13013 May 2014 Annual Radiological Environmental Operating Reports for 2013 NL-14-0658, Annual Non-Radiological Environmental Operating Reports for 20132014-04-29029 April 2014 Annual Non-Radiological Environmental Operating Reports for 2013 NL-13-1006, Annual Radiological Environmental Operating Reports for 20122013-05-15015 May 2013 Annual Radiological Environmental Operating Reports for 2012 NL-13-0889, Annual Radioactive Effluent Release Report for 20122013-04-30030 April 2013 Annual Radioactive Effluent Release Report for 2012 NL-13-0745, Submittal of Annual Non-Radiological Environmental Operating Reports for 20122013-04-30030 April 2013 Submittal of Annual Non-Radiological Environmental Operating Reports for 2012 NL-13-0849, Post Accident Monitoring Report2013-04-26026 April 2013 Post Accident Monitoring Report NL-12-0773, Annual Non-Radiological Environmental Operating Reports for 20112012-04-24024 April 2012 Annual Non-Radiological Environmental Operating Reports for 2011 NL-11-0853, Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-00062011-05-24024 May 2011 Special Report 2011-001-01, Inoperable Radiation Monitor 1 RE-0006 NL-11-0888, Annual Radiological Environmental Operating Reports for 20102011-05-12012 May 2011 Annual Radiological Environmental Operating Reports for 2010 NL-11-0865, Annual Non-Radiological Environmental Operating Reports for 20102011-04-30030 April 2011 Annual Non-Radiological Environmental Operating Reports for 2010 NL-11-0811, Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through End2011-04-29029 April 2011 Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through End NL-10-0905, Enclosure 3 - Vogtle, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 3 - Vogtle, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0905, Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 ML1013905332010-05-14014 May 2010 Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0905, Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 20092010-05-14014 May 2010 Enclosure 2 - Joseph M. Farley, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 ML1013905352010-05-14014 May 2010 Enclosure 1 - Edwin I. Hatch, Units 1 and 2, Annual Radiological Environmental Operating Report for 2009 NL-10-0839, Submittal of Annual Non-Radiological Environmental Operating Report for 20092010-04-28028 April 2010 Submittal of Annual Non-Radiological Environmental Operating Report for 2009 NL-10-0352, ISFSI and Edwin I. Hatch, Units 1, 2 and ISFSI, Submittal of ISFSI Annual Radioactive Effluent Release Report for 20092010-02-26026 February 2010 ISFSI and Edwin I. Hatch, Units 1, 2 and ISFSI, Submittal of ISFSI Annual Radioactive Effluent Release Report for 2009 NL-09-0775, Annual Radiological Environmental Operating Reports for 20082009-05-14014 May 2009 Annual Radiological Environmental Operating Reports for 2008 ML0912606912009-04-27027 April 2009 Annual Radioactive Effluent Release Reports for 2008, Enclosure 4 Farley Offsite Dose Calculation Manual (ODCM) - Version 23 and Vogtle ODCM - Version 24 ML0912606892009-04-27027 April 2009 Annual Radioactive Effluent Release Reports for 2008 2023-06-02
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 2024-01-30
[Table view] |
Text
Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama35201 Tel 205.992.7872 Fax 205.992.7601 A SOUTHERN^k APR 2 9 20H COMPANY Docket Nos.: 50-321 50-348 50-424 NL-14-0658 50-366 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Reports for 2013 Ladies and Gentlemen:
In accordance with Subsection 5.4.1 of the referenced plants' Environmental Protection Plans (Appendix B to the Operating Licenses), Southern Nuclear Operating Company hereby submits the Annual Non-Radiological Environmental Operating Reports for 2013.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/JLS/lac Attachments: 1. Hatch Annual Non-Radiological Environmental Operating Report for 2013
- 2. Farley Annual Non-Radiological Environmental Operating Report for 2013
- 3. Vogtle Annual Non-Radiological Environmental Operating Report for 2013
U. S. Nuclear Regulatory Commission NL-14-0658 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynsl<i, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. D. R. Vineyard, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle 1 & 2 Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President - Engineering RType: Farley=CFA04.054: Hatch=CHA02.004; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager - Farley Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. L. M. Cain, Senior Resident Inspector - Vogtle 1 & 2 Mr. P. K. Niebaum, Senior Resident Inspector - Farley Mr. J. R. Sowa, Resident Inspector - Farley Mr. R.E. Martin, NRR Project Manager - Hatch, Vogtle 1 & 2
Edwin 1. Hatch Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Annual Non-Radioloaical Environmental Operating Reports for 2013 Attachment 1 Hatch Annual Non-Radiological Environmental Operating Report for 2013 Page 1 of 2 Annual Non-Radiological Environmental Operating Reports for 2013 EDWIN I. HATCH NUCLEAR PLANT - UNITS 1 AND 2 I. Introduction This report is submitted in accordance with Subsection 5.4.1 of the Edwin I. Hatch Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating Licenses DPR-57 and NPF-5. This report describes implementation of the Environmental Protection Plan for the calendar year 2013.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period
- 1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with the State of Georgia National Pollutant Discharge Elimination System (NPDES) Permit GA0004120; there was no additional requirement for aquatic monitoring during the year.
- 2. Terrestrial Monitoring - Terrestrial monitoring is not required.
- 3. Maintenance of Transmission Line Corridors - There is no reporting requirement associated with this condition.
B. Comparisons of the Year's Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Nonradiological Environmental Monitoring Reports These comparisons were not required because no noiu-adiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No.
GA0004120.
C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during the year.
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during the year.
Page 2 of 2 Annual Non-Radiological Environmental Operating Reports for 2013 E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted during the year.
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Reports for 2013 Attachment 2 Farley Annual Non-Radiological Environmental Operating Report for 2013 Page 1 of 1 Annual Non-Radiological Environmental Operating Reports for 2013 JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 I. Introduction In accordance with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, this report is submitted summarizing implementation of the Environmental Protection Plan for calendar year 2013.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period L Aerial Remote Sensing - Aerial Remote Sensing is no longer required.
- 2. Herbicide Application - There is no reporting requirement associated with this condition.
- 3. Land Management - There is no reporting requirement associated with this condition.
B. Comparison of the Year's Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Non-Radiological Monitoring Reports These comparisons were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No.
AL0024619.
C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during the year.
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during the year.
E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Section 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted during the year.
Edwin 1. Hatcli Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Annual Non-Radiological Environmental Operating Reports for 2013 Attachment 3 Vogtle Annual Non-Radiological Environmental Operating Report for 2013 Page 1 of 2 Annual Non-Radiological Environmental Operating Reports for 2013 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 I. Introduction In accordance with Subsection 5.4.1 of the Vogtle Electric Generating Plant (VEGP)
Environmental Protection Plan (Nonradiological), Appendix B to Facility Operating License Nos. NPF-68 and NPF-81, this report is submitted describing implementation of the Environmental Protection Plan for the calendar year 2013.
II. Reporting Requirements A. Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 42 of the Environmental Protection Plan (EPP) for the Reporting Period
- 1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with State of Georgia National Pollutant Discharge Elimination System (NPDES) Permit GA0026786; there was no additional requirement for aquatic monitoring during the year.
- 2. Terrestrial Monitoring - Terrestrial monitoring is not required.
- 3. Maintenance of Transmission Line Corridors - There is no reporting requirement associated with this condition.
- 4. Noise Monitoring - There were no complaints reported regarding noise along the VEGP-related, high-voltage transmission lines.
B. Comparison of the Year's Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Monitoring Reports These programs were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No. GA0026786 referenced in Section A above.
C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during the year.
D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during the year.
Page 2 of 2 Annual Non-Radiological Environmental Operating Reports for 2013 E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments which involved a potentially significant, unreviewed environmental question.
F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted during the year.