05000361-07-301; 05000362-07-301 - San Onofre Nuclear Generating Station, Units 2 and 3 - Notification of NRC Initial Operator Licensing Examination
ML063410620
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/06/2006
From: Nease R L
Operations Branch IV
To: Rosenblum R M
Southern California Edison Co
References
IR-07-301
Download: ML063410620 (5)


See also: IR 05000361/2007301

Text

December 6, 2006Richard M. RosenblumSenior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128SUBJECT:SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000361/2007301; 05000362/2007301Dear Mr. Rosenblum:

In a telephone conversation on December 6, 2006, between Messers. K. Clayton, ChiefExaminer, and A. Hagemeyer, Operations Training Supervisor, arrangements were made for

the administration of licensing examinations at San Onofre Nuclear Generating Station during

the weeks of June 4 and June 11, 2007.As agreed during the telephone conversation, your staff will prepare the examinations based onthe guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRC's regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.To meet the above schedule, it will be necessary for your staff to furnish the examinationoutlines by February 4, 2007. The written examinations, operating tests, and supporting

reference materials identified in Attachment 2 to ES-201 will be due by April 5, 2007. [Pursuant

to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use.] Any delay in receiving the required examination and reference

materials, or the submittal of inadequate or incomplete materials, may cause the examinations

to be rescheduled.In order to conduct the requested written examinations and operating tests, it will be necessaryfor your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

Southern California Edison Company-2-temperatures, and levels) generated during the dynamic operating tests until the examinationresults are final.Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be ineffect while the written examinations and operating tests are being administered.To permit timely NRC review and evaluation, your staff should submit preliminary reactoroperator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, underapproval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average hours per response, including the time for

reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office ofInformation and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and

Budget, Washington, DC 20503.The NRC may neither conduct nor sponsor, and a person is not required to respond to, aninformation collection, unless it displays a currently valid OMB control number.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosures will be available electronically for public inspection in the NRC's PublicDocument Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the Electronic Reading Room page of the NRC's public Web site at

http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. has been advised of the policies and guidelinesreferenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact at , or myself at 817-860-8159.Sincerely, /RA/Rebecca L. Nease, ChiefOperations Branch

Division of Reactor Safety

Southern California Edison Company-3-Dockets: 50-361; 50-362Licenses: NPF-10; NPF-15DISTRIBUTION:Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101Gary L. NolffAssistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522Mark L. ParsonsDeputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522Ray W. WaldoSouthern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128David Spath, ChiefDivision of Drinking Water and

Environmental Management

California Department of Health Services

P.O. Box 942732

Sacramento, CA 94234-7320Michael R. OlsonSan Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21G

San Diego, CA 92123-1548Director, Radiological Health BranchState Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414Mayor City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

Southern California Edison Company-4-James D. Boyd, CommissionerCalifornia Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814Douglas K. Porter, Esq.Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770James T. ReillySouthern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128Daniel P. BreigSouthern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128A. Edward SchererSouthern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128Brian KatzSouthern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Company-5-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (CCO1)Branch Chief, DRP/D (TWP)Senior Project Engineer, DRP/D (GEW)Team Leader, DRP/TSS (RVA)RITS Coordinator (KEG)SUNSI Review Completed: __Y____ADAMS: Yes G No Initials: _KDC_____ Publicly Available

G Non-Publicly Available

G Sensitive Non-SensitiveSOE:OBC:OBKClayton/lmbRLNease/RA//RA/12/6/0612/6/06OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax