ML070860242

From kanterella
Revision as of 11:45, 24 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Cover and Table of Contents
ML070860242
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/15/2006
From: Ballinger R G, Bullen D B, Latanision R M
Altran Solutions Corp, Exponent Failure Analysis Associates, Exponent
To:
FirstEnergy Nuclear Operating Co, Office of Nuclear Reactor Regulation
Shared Package
ML070860211 List:
References
FOIA/PA-2007-0299
Download: ML070860242 (18)


Text

Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head

Wastage Event

Prepared for

First Energy Nuclear Operating Corporation c/o Morgan Lewis 1111 Pennsylvania Avenue, NW

Washington, DC 20004

Prepared by:

Exponent Failure Analysis Associates 21 Strathmore Road

Natick, MA 01760

Altran Solutions Corporation

451 D Street

Boston, MA 02210

December 15, 2006

Exponent, Inc.

Ronald M. Latanision, Ph.D.

_______________________________

Daniel B. Bullen, Ph.D., P.E.

Ronald Ballinger, Ph.D.

BN63097.001 B0T0 1106 DB05 i Contents Page List of Figures vi List of Tables xiii Acronyms and Abbreviations xiv 1 Introduction, Purpose and Scope 1-1 2 Principal Conclusions and Opinions 2-1 3 Background 3-1 3.1 Overview of the Davis-Besse Plant 3-1 3.2 The Davis-Besse Reactor Pressure Vessel Head 3-2 3.3 The Davis-Besse CRDM Nozzles 3-2

3.4 References

3-16

4 The Davis-Besse March 2002 Event 4-1 4.1 Summary Chonology of the March 2002 Event 4-1 4.1.1 RPV Head Video Inspections, CRDM Flange Leakage, Boric Acid Deposits, and Head Cleaning 4-2 4.1.2 CRDM Nozzle UT Inspections 4-3 4.2 March 2002 13RFO Discovery of Large Head Corrosion Cavity at CRDM Nozzle 3 and Minor Crevice Corrosion at CRDM Nozzle 2 in the RPV Head 4-4 4.2.1 Initial Discovery of the Corrosion Cavity in the Reactor Pressure Vessel Head 4-5 4.2.2 Inspection and Metallurgical Analysis of the Nozzles and Corrosion Cavity 4-6 4.3 Responses to the March 2002 Davis-Besse RPV head Corrosion Cavity Discovery 4-6 4.3.1 FENOC Responses 4-7 4.3.2 EPRI Material Reliability Program (MRP)

Response 4-14 4.3.3 Regulatory Response 4-15 4.4 References 4-32

5 Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle Cracking 5-1

5.1 Non-US Experience with and Responses to CRDM Nozzle Cracking 5-2 5.1.1 Bugey-3 and Subsequent EdF Experience 5-2 BN63097.001 B0T0 1106 DB05 ii 5.1.2 Other Non-US Experience with CRDM Nozzle Cracking 5-5

5.2 Alloy

600 Pressurizer Nozzle Cracking 5-8 5.3 US Experience with and Responses to CRDM Nozzle Cracking 5-10

5.3.1 Initial

Experience of CRDM Nozzle Inspections and Cracking in US Plants 1994-2000 5-10

5.3.2 Initial

US Industry and NRC Regulatory Response to CRDM Nozzle Cracking 5-14 5.3.3 NRC/INEL/EG&G Assessm ent of CRDM Nozzle Cracking 5-21 5.3.4 NRC Generic Letter GL 97-01 and Industry Response 5-23

5.3.5 Experience

of CRDM Nozzle Cracking in US 5-27 5.3.6 US Industry and NRC Regulatory Response to CRDM Nozzle Cracking 2000-2001 5-33 5.3.7 US CRDM Nozzle Cracks, Repairs, and RPV Head Replacements Since 2000 5-36

5.4 References

5-44 6 Boric Acid Wastage of Carbon Steel Components in US PWR Plants 6-1

6.1 Review

of US Experience with Boric Acid Corrosion of Carbon Steel Components Prior to 2002 6-4

6.1.1 Boric

Acid Corrosion of Components Other than the RPV Head 6-4

6.1.2 Boric

Acid Corrosion of RPV and Pressurizer heads Prior to the 2002 Davis-Besse Event 6-10 6.2 NRC Regulatory and US Industry Responses to Boric Acid Corrosion Issues 1980-2001 6-14

6.3 Boric

Acid Corrosion Research and Testing Prior to 2002 6-20 6.3.1 Non-Crevice Geometry Boric Acid Corrosion Testing 6-20

6.3.2 Crevice

Geometry Boric Acid Corrosion testing Prior to 2002 6-24

6.4 Recent

Research on Boric Acid Corrosion of RPV Head Resulting from the Davis-Besse Event 6-28 6.4.1 EPRI Boric Acid Corrosion testing to Replicate the Davis-Besse RPV Head Wastage Event 6-28 6.4.2 NRC/ANL Corrosion Test Programs to Replicate the Davis-Besse Wastage Conditions 6-32

6.5 References

6-50 7 FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues 7-1 7.1 Davis-Besse Action and Responses to Key US NRC and Industry Initiatives 7-2 BN63097.001 B0T0 1106 DB05 iii 7.1.1 Davis-Besse Response to NRC Bulletin 88-05 and the Implementation of a Boric Acid Corrosion Control Program 7-3

7.1.2 FENOC

Responses to US NRC Bulletin 2001-01 and Subsequent Information Requests 7.2 RCS Leakage Monitoring at Davis-Besse 7-17 7.2.1 RCS Inventory Balance 7-17 7.2.2 RB Radiation Monitoring 7-19

7.3 Review

of Davis-Besse Plant Re fueling Outages and History of Boric Acid Leakage 7-21 7.3.1 Pre-8RFO CRDM Flange Leakage 7-21 7.3.2 8RFO Inspections and Events - March/April 1993 7-22 7.3.3 9RFO Inspections and Events - October/November 1994 7-22

7.3.4 10RFO

Inspections - April/May 1996 7-23

7.3.5 11RFO

Inspections - April/May 1998 7-23

7.3.6 12RFO

Inspections, Events and NRC Regulatory Review - April/May 2000 7-26

7.3.7 13RFO

Inspections - Started February 2002 7-28

7.4 References

7-48

8 Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3 8-1 8.1 PWSCC and Prior Industry Stress Analysis Studies 8-2 8.l.1 PWSCC of Alloy 600 Materials in PWRs 8-2

8.1.2 Prior

Industry Stress Analysis Studies 8-5 8.2 Stress Analysis of Davis-Besse CRDM Nozzles 2 and 3 8-5 8.2.1 Finite Element Model of CRDM Nozzle 3 Head Penetration 8-6 8.2.2 Material Properties 8-7

8.2.3 Loading

Conditions 8-8

8.2.4 Stress

Analysis Results 8-9 8.3 PWSCC Crack Growth Rates for Davis-Besse CRDM Nozzles 8-10 8.3.1 Crack Growth Rates Used in Previous Work 8-10

8.3.2 Recent

Data on Davis-Besse Nozzle and Weld Alloy 600/182 Materials by NRC/ANL 8-12 8.4 PWSCC Cracks in Davis-Besse CRDM Nozzles 2 and 3 8-15 8.4.1 Effective Crack Leak Le ngths of the Axial PWSCC Cracks in Nozzles 2 and 3 8-15 8.4.2 Reconstruction of the Crack 1 Profile in RDM Nozzle 3 and J-groove Weld 8-16 8.5 Crack Growth Rates for Observed Cracks at Davis-Besse CRDM Nozzles 2 and 3 8-17 8.5.1 Estimate of Time at Which Cracks in CRDM Nozzles 2 and 3 Reached Through Wall above Weld and Leakage Began 8-17 BN63097.001 B0T0 1106 DB05 iv8.5.2 The Unique Nature of the Cracking at Nozzle 3 8-20 8.6 References 8-34

9 CFD Modeling of Fluid Flow in CRDM Nozzle and Weld Cracks and Through Annulus 9-1 9.1 Prior Assessments of Thermal Hydraulic Environments in the CRDM Annulus and Developing Wastage Cavity 9-2 9.2 RPV Head Low Alloy Steel Removal Mechanisms and Wastage Rates 9-8 9.3 Approach to CFD Modeling and Model Development 9-10 9.3.1 Overall Approach to CFD Modeling 9-10 9.3.2 CFD Model Development 9-11 9.4 Leak Rate vs. Crack Length Calculations 9-13

9.5 Development

of the Initial Wa stage Cavity in the CRDM Nozzle Annulus 9-16 9.6 CFD Modeling of the Initial Stages of Wastage Cavity Growth at CRDM Nozzles 2 and 3 9-19 9.6.1 Input and Boundary Conditions 9-20 9.6.2 CFD Case 1-Crack Length of 0.5 Inch, Leak Rate of 0.001 gpm, Bottom of Wa stage Cavity 2 Inches Above Top of Crack 9-24 9.6.3 CFD Case 2-Crack Length of 0.8 Inch, Leak Rate of 0.01 gpm, Bottom of Wa stage Cavity 1.7 Inches Above Top of Crack 9-26 9.6.4 CFD Case 3-Crack Length of 1.0 Inch, Leak Rate of 0.02 gpm, Bottom of Wa stage Cavity 0.2 Inches Below Top of Crack 9-29 9.7 CFD Modeling of the Final Wastage Cavity at CRDM Nozzle 3 9-31 9.7.1 CFD Case 4-Modeling of the Final Wastage Cavity at CRDM Nozzle 3 and Final Leak Rate in February 2002 9-31 9.7.2 CFD Case 5-Transient Anal ysis of Fluid Flow and Fluid Ejection from the Final Wastage Cavity at CRDM Nozzle 3 9-33 9.8 Summary 9-35

9.9 References

9-67

10 Development of Wastage Cavities at Davis-Besse CRDM Nozzles 2 and 3 10-1 10.1 Wastage Cavities at Nozzles 3 and 2 10-2 10.1.1 Physical Apprearance an d Characteristics of the Wastage Cavity at Nozzle 3 10-2 10.1.2 Physical Appearance and Characteristics of the Wastage Cavity at Nozzle 2 10-3 10.1.3 Cracks in CRDM Alloy 600 Nozzle 3 and Alloy 182 Weld 10-4 BN63097.001 B0T0 1106 DB05 v10.1.4 Metal Removal Processes by Corrosion, Erosion, Flow Assisted Corrosion (FAC), and Water Jet Cutting 10-5 10.2 Timeline of Cavity Development at Nozzles 3 and 2 10-6 10.2.1 12 RFO: Nozzle 3 Crack is Leaking at a Low Rate And a Minor Wastage Cavity Begins to Form at Nozzle 3 10-7 10.2.2 October-November 2001: Weld Crack Uncovers, Leak Rate Dramatically Increases, Cavity Growth Accelerates, and Significant Damage to the RPV Head Occurs 10-9 10.3 Postscript 10-11 10.4 References 10-28

Appendix A Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 Penetration Appendix B Crack Driving Force and Growth Rate Estimates Appendix C CFD Analysis Appendix D Leak Rate vs. Crack Length Calculations Appendix E Fluid Jet Cutting of Da vis-Besse RPV Head Materials BN63097.001 B0T0 1106 DB05 vi List of Figures Page Figure 3.1 Davis-Besse NSSS Showing "Raised Loop" Configuration 3-5 Figure 3.2 Typical Reactor Pressure Vessel Head General Arrangement 3-6 Figure 3.3 Davis-Besse Reactor Pressure Vessel Head Sectional View 3-7 Figure 3.4 Davis-Besse Reactor Pressure Vessel Head Sectional View 3-8 Figure 3.5 Davis-Besse Reactor Pressure Vessel Head Plan View 3-9 Figure 3.6 View of the Underside of the Davis-Besse RPV Head with Control Rods in Place 3-10 Figure 3.7 View through the Access Opening Cut in the RPV head Service Structure above the Support St eel and Insulation Showing the Close Proximity of the CRDM Flanges 3-11 Figure 3.8 View through the Access Opening Cut in the RPV Head Service Structure above the Support St eel and Insulation Showing the Close Proximity of the CRDM Flanges 3-12 Figure 3.9 Davis-Besse CRDM Nozzle General Arrangement 3-13 Figure 4.1 Boric acid and iron oxide flowing from mouse holes at 12RFO. 4-23 Figure 4.2 Davis-Besse RPV head wastage cavity found adjacent to Nozzle

3. 4-24 Figure 4.3 Location of RPV head wastage on the downhill side of Nozzle 3. 4-25 Figure 4.4 Crevice identif ied by inspection of Nozzl e 2 with a hand-held video camera following the removal of a section of mirror insulation. 4-26 Figure 4.5 Portion of the J-groove weld with the 10-degree crack. 4-27 Figure 4.6 J-groove weld with the 10-d egree crack showing crack and flow channel. 4-28 Figure 4.7 Surface morphology of the Davis-Besse RPV head wastage cavity looking toward the nose of the cavity (~10-degree). 4-29 Figure 4.8 Surface morphology of the Davis-Besse RPV head wastage cavity looking toward the 90-degree side. 4-30 Figure 4.9 Surface morphology of the Davis-Besse RPV head wastage cavity looking toward the 270-degree side. 4-31 BN63097.001 B0T0 1106 DB05 viiFigure 6.1 Areas on the RPV Head at Turkey Point-4 Affected by Boric Acid Wastage in 1987 (from EPRI Boric Acid Corrosion Guidebook, April 1995) 6-37 Figure 6.2 Effect of Boric Acid Deposits in Protecting Surfaces from Corrosion (from EPRI Boric Acid Corrosion Guidebook, April 1995) 6-38 Figure 6.3 Boric Acid Corrosion Test Program Configurations and Conditions (from EPRI Boric Acid Corrosion Guidebook, April 1995) 6-39 Figure 6.4 Summary of Boric Acid Corrosion Test Results (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-40 Figure 6.5 Temperature Dependency of Corrosion Rate in B & W Tests of Water Containing Boric Acid Dripping onto Pipes (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-41 Figure 6.6 CE Crevice Test Configuration for Boric Acid Leakage into an Annular Crevice (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-42 Figure 6.7 Location of Wastage in CE Crevice Test Configuration for Boric Acid Leakage into an Annular Crevice (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-43 Figure 6.8 EPRI Crevice Test Configuration for Boric Acid Leakage into an Annular Crevice (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-44 Figure 6.9 Maximum Wastage Rates from CE and EPRI Crevice Test Results (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-45 Figure 6.10 Typical Corrosion/Erosion Wa stage Pattern Near Injection Point in EPRI Crevice Test for Boric Acid Leakage into an Annular Crevice (Slide 26 from the Ma y 22, 2002 EPRI Meeting with the NRC; also in EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-46 Figure 6.11(a) EPRI MRP Corrosion Testing Wastage Model: Phase 1 and Phase 2 6-47 Figure 6.11(b) EPRI MRP Corrosion Testing Wastage Model: Phase 3 and Phase 4 6-48 Figure 7.1 Daily average unidentified leak rate for Davis-Besse Cycle 13. 7-31 Figure 7.2 Three-day average unidentified leak rate for Davis-Besse Cylce
13. 7-32 BN63097.001 B0T0 1106 DB05 viiiFigure 7.3 Thirty-day average unidentified leak rate for Davis-Besse Cycle
13. 7-33 Figure 7.4 Monthly average unidentified leak rate for Davis-Besse Cycles 10 through 13. 7-34 Figure 7.5 Location of radiation monitors RE 4597AA and RE 4597BA. 7-35 Figure 7.6 Noble gas activity for Cycles 10-13 for radiation monitors RE 4597AA and RE4597BA. 7-36 Figure 7.7 Iodine activity for Cycles 10-13 for radiation monitors RE4597AA and RE4597BA. 7-37 Figure 7.8 Flange Leakage Showing Boric Acid Deposits Leaking Through the Mirror Insulation at 8RFO. 7-38 Figure 7.9 Flange Leakage Showing Boric Acid Deposits On Side of Nozzles and Stalactites from Gaps in Insulation (8RFO). 7-39 Figure 7.10 Reddish Brown Boron De posits Crusted on Side of Nozzle (8RFO). 7-40 Figure 7.11 Boric Acid Deposits be hind the CRDM Nozzles on the North Side of the Reactor Pressure Vessel Head at 10RFO. 7-41 Figure 7.12 Boron Piled on Reactor Pressure Vessel Head Under the Mirror Insulation Near Nozzle 31 (11RFO). 7-42 Figure 7.13 Boron Piled Up to the Mirro r Insulation Near th e Center of the RPV Head (12RFO). 7-43 Figure 7.14 Boric Acid Deposits on RPV head at 13RFO. Note this is Figure 24 from the Root Cause Report. 7-44 Figure 7.15 Corrosion Product/Boric Acid Deposits Adjacent to Nozzle 3 (90 Degree Side) after Hydrolasing. 7-45 Figure 7.16 Corrosion Product/Boric Acid Deposits Adjacent to Nozzle 3 (270 Degree Side) after Hydrolasing. 7-46 Figure 8.1 Crack initiation and growth in steam generator tubes, (a) lab-generated SCC cracks showing multiple crack initiation; (b)

actual steam generator tube cr ack; (c) eddy current inspection signal from the tube crack in (b) one cycle earlier 8-22 Figure 8.2 Three-dimensional, half-symmetry finite element model of CRDM Nozzle-3 head penetra tion, showing Alloy-600 nozzle, Alloy-182 J-groove weld, and su rrounding SA-533 alloy steel head with Type 308 stainless steel cladding 8-23 BN63097.001 B0T0 1106 DB05 ixFigure 8.3 Close-up view of 13-pass J-groove weld joining CRDM Nozzle 3 to alloy-steel head. 8-23 Figure 8.4 PWSCC growth rate data for Alloy 600 from Davis-Besse Nozzle 3 compared to EPR/MRP disposition curve. 8-24 Figure 8.5 Nozzle-circumferential (hoop) stress results in ksi for downhill side of Nozzle 3 at J-groove weld under operating pressure and temperature (2,155 psi, 605°F). 8-25 Figure 8.6 Nozzle-axial stress results in ksi for downhill side of Nozzle 3 at J-groove weld under operating pres sure and temperature (2,155 psi, 605°F). 8-26 Figure 8.7 Framatome plot of crack profiles in Davis-Besse CRDM Nozzle 2 based on UT results 8-27 Figure 8.8 Through-wall profile of Crack in Davis-Besse CRDM Nozzle 2 based on Framatome UT results. 8-28 Figure 8.9 PWSCC growth rate for Alloy 182 from Davis-Besse Nozzle 11J-groove weld compared to EPR/MRP disposition curve. 8-29 Figure 8.10 Through-wall profile of Crack in Davis-Besse CRDM Nozzle 2 based on Framatome UT results. 8-30 Figure 8.11 BWXT photographs from metallurgical examination of Davis-Besse Nozzle-3 J-groove weld showing extent of PWSCC Crack 1 into weld. 8-31 Figure 8.12 Schematic of final size a nd shape of Crack 1 in Davis-Besse CRDM Nozzle 3 developed from Framatome UT test records and BWXT metallurgical sections. 8-32 Figure 9.1(a) CFD Model Mesh for Case 3 Small Wastage Cavity 9-36 Figure 9.1(b) CFD Model Mesh for Case 3 Small Wastage Cavity 9-37 Figure 9.2(a) CFD Model Mesh for Case 4 Large Wastage Cavity 9-38 Figure 9.2(b) CFD Model Mesh for Case 4 Large Wastage Cavity 9-39 Figure 9.3 Calculated Leak rate vs. Crack Length Above the J-Groove Weld as Calculated by Dominion Engineering, Inc. 9-40 Figure 9.4 CRDM Nozzle Leak Rate vs. Crack Height 9-41 Figure 9.5 Scanning electron micrograph of CRDM Nozzle 3 crack at 180º location showing typical dimens ions of PWSCC nozzle crack widths. Note the maximum crack width is about 20 µm (0.0008 inches). 9-42 BN63097.001 B0T0 1106 DB05 xFigure 9.6 Optical micrograph of J-groove weld crack in CRDM Nozzle 3 at 10º location showing large crack width. Note the nominal crack width is about 400 µm (0.016 inches) or about 20 times larger than the PWSCC crack in the same nozzle shown above. 9-42 Figure 9.7 Calculated leak rate vs. cr ack length for a J-groove weld crack with crack widths that are 10 times, 15 times, and 20 times wider than typical PWSCC nozzle cracks. 9-43 Figure 9.8 Case 1: Maximum and aver age fluid velocity magnitude within wastage as a function of distan ce to the J-groove weld for a 0.5-inch crack with a leak rate of 0.001 gpm. 9-44 Figure 9.9 Case 1: Average fluid pressure within wastag e as a function of distance to the J-groove weld fo r a 0.5-inch crack with a leak rate of 0.001 gpm. 9-45 Figure 9.10 Case 1: Average wall temperature within wastage as a function of distance to the J-groove weld for a 0.5-inch crack with a leak rate of 0.001 gpm. 9-46 Figure 9.11 Case 1: Average steam quali ty within wastage as a function of distance to the J-groove weld fo r a 0.5-inch crack with a leak rate of 0.001 gpm. 9-47 Figure 9.12 Case 2: Maximum and aver age fluid velocity magnitude within wastage as a function of distance from the J-groove weld for a 0.8-inch crack with a leak rate of 0.01 gpm. 9-48 Figure 9.13 Case 2: Average fluid pre ssure within wastag e as a function of distance to the J-groove weld fo r a 0.8-inch crack with a leak rate of 0.01 gpm. 9-49 Figure 9.14 Case 2: Average wall temperature within wastage as a function of distance to the J-groove weld for a 0.8-inch crack with a leak rate of 0.01 gpm. 9-51 Figure 9.15 Case 2: Average steam quali ty within wastage as a function of distance to the J-groove weld fo r a 0.8-inch crack with a leak rate of 0.01 gpm. 9-51 Figure 9.16 Case 3: Maximum and aver age fluid velocity magnitude within wastage as a function of distan ce to the J-groove weld for a 1.0-inch crack with a leak rate of 0.02 gpm. 9-52 Figure 9.17 Case 3: Average fluid pre ssure within wastag e as a function of distance to the J-groove weld fo r a 1.0-inch crack with a leak rate of 0.02 gpm. 9-53 BN63097.001 B0T0 1106 DB05 xiFigure 9.18 Case 3: Average temperat ure within wastage as a function of distance to the J-groove weld fo r a 1.0-inch crack with a leak rate of 0.02 gpm. 9-54 Figure 9.19 Case 3: Average steam quali ty within wastage as a function of distance to the J-groove weld fo r a 1.0-inch crack with a leak rate of 0.02 gpm. 9-55 Figure 9.20 Velocity magnitude cont ours for the final wastage state sectioned directly through crac

k. The viewpoint is looking up from below RPV head. 9-56 Figure 9.21 Temperature contours for the final wastage state sectioned directly through crack. The viewpoint is looking up from below RPV head. 9-57 Figure 9.22 Cavity wall temperature contours for the final wastage state. The viewpoint is looking up from below RPV head from a different orientation than Figures 9.17 a nd 9.18 to show the cavity wall temperatures directly opposite the cracks. 9-58 Figure 9.23 Top View of Wastage Cavity on Davis-Besse RPV Head. 9-59 Figure 9.24 Wastage Cavity Sidewa lls Viewed at Low Magnification Looking Toward 90º and 270º. 9-60 Figure 9.25(a) Dental Mold of Wastage Cavity Looking Towards 0º and 90º. 9-61 Figure 9.25(b) Dental Mold of Wastage Cavity Looking Towards 180º and 270º. 9-62 Figure 9.26 Transient analysis results for final wastage cavity filled with boric acid solution for time steps from 0.001 seconds to 0.02 seconds. 9-63 Figure 9.27 Transient analysis results for final wastage cavity filled with boric acid solution for time steps from 0.05 seconds to 0.10 seconds. 9-64 Figure 9.28 Transient analysis results for final wastage cavity filled with boric acid solution for time steps from 0.12 seconds to 0.20

seconds. 9-65 Figure 9.29 Transient analysis results for final wastage cavity filled with boric acid solution for time steps from 0.25 seconds to 0.40

seconds. 9-66 Figure 10.1 Top View of wastage cavity 10-13 Figure 10.2 View of cavity looking toward 270º 10-14 Figure 10.3 View of cavity looking toward 90º 10-15 BN63097.001 B0T0 1106 DB05 xiiFigure 10.4 Low magnification photographs of cavity sidewalls 10-16 Figure 10.5(a) Photographs of cavity dental mold 10-17 Figure 10.5(b) Photographs of cavity dental mold 10-18 Figure 10.6 Wastage Cavity at CRDM Nozzle 2 10-19 Figure 10.7 Wastage Cavity at CRDM Nozzle 2 10-20 Figure 10.8 Schematic of final size a nd shape of Crack 1 in Davis-Besse CRDM Nozzle 3 (from Section 8, Figure 8.10) 10-21 Figure 10.9 PT results for nozzle 3 J-groove weld bore and cladding underside. The J-groove weld cont ained an axial indication near 10° 10-22 Figure 10.10 Photograph showing the remaining portion of the axial crack near 10° in the CRDM Nozzle 3 J-groove weld. This is the portion remaining after the machining was completed for nozzle

repair. 10-23 Figure 10.11 Photograph showing axial crack in CRDM nozzle 3 J-groove weld near 10°. 10-24 Figure 10.12 Piece A2A6 was first sectioned into Pieces A2A6A and A2A6B.

Piece A2A6A was further sectioned into Pieces A2A6A1 and A2A6A2. Both cuts were made on the same plane, parallel to the paper. The first cut line is partially visible; Piece A2A6B is

the upper portion of the weld.

The second cut line between Pieces A2A6A1 and A2A6A2 is obscured by Piece A2A6A1 10-25 Figure 10.13 Piece A2A6B after sectioning. The bottom surface of A2A6B2 was mounted. The axial crack in A2A6B3 was opened up for SEM. 10-26 Figure 10.14 Macro photograph of metallographic mount sample A2A6B2 (see Figures 5.4 and 5.5 for the sample orientation). The axial cracking at ~10o is through the J-gr oove weld, in contrast to the cracking near 180o, which was part ially through the weld. A slightly higher magnification micrograph is also provided 10-27 BN63097.001 B0T0 1106 DB05 xiii List of Tables Page Table 3.1 Principal Design Parameters of the Davis-Besse Plant 3-14 Table 3.2 Davis-Besse CRDM Nozzle Geometry, Materials and Operating Parameters 3-15 Table 5.1 EdF CRDM Inspection Resu lts Reported at the 1992, 1994, and 2000 EPRI Workshops on PWSCC 5-38 Table 5.2 Summary of US Plants with Detected RPV Head CRDM Nozzle and/or Weld Cracking (from MRP-110) 5-39 Table 5.3 Orientation and Location of CRDM Nozzle Cracks in US Plant RPV Head CRDM Nozzles (from MRP-110) 5-40 Table 5.4 Summary of Inspections of US Plant RPV Head Nozzle J-Groove Welds (from MRP-110) 5-41 Table 5.5 Summary of US Plants with Detected RPV Head CRDM Nozzle Leakage (from MRP-110) 5-42 Table 5.6 Summary of US Plant RPV Head Replacements (from MRP-110) 5-43 Table 6.1 Test Parameters and Wastage Results from CE Crevice Test for Boric Acid Leakage into an Annular Crevice (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-49 Table 6.2 Test Parameters and Wastage Results from EPRI Crevice Test for Boric Acid Leakage into an Annular Crevice (from EPRI Boric Acid Corrosion Guidebook, Revision 1, November 2001) 6-49 Table 7.1 Summary of Identified L eaking CRDM Nozzles and Repairs for 6RFO to 12RFO 7-47 Table 8.1 Axial PWSCC Crack Dimens ions in Davis-Besse CRDM Nozzle 2 for Cracks Extending Above the Top of the J-groove Weld 8-33 Table 8.2 Axial PWSCC Crack Dimens ions in Davis-Besse CRDM Nozzle 3 for Cracks extending Above the Top of the J-groove Weld 8-33

BN63097.001 B0T0 1106 DB05 xivGlossary of Terms and Abbreviations ANO-1 Arkansas Nuclear One AIT Augmented Inspection Team (NRC)

ANL Argonne National Laboratory ANSI American National Standards Institute ASME American Society of Mechanical Engineers B&W Babcock & Wilcox BA Boric Acid BAC Boric Acid Corrosion BACC Boric Acid Corrosion Control BNL Brookhaven National Laboratory BWOG B &W Owners Group CAC Containment Air Cooler CAL Confirmatory Action Letter CE Combustion Engineering CEOG CE Owners Group CFD Computational Fluid Dynamics CGR Crack Growth Rate CNRB Company Nuclear Review Board CR Condition Report CRDM Control Rod Drive Mechanism CTMT Reactor Containment DB Davis-Besse DEI Dominion Engineering Incorporated ECT Eddy Current Testing BN63097.001 B0T0 1106 DB05 xvEdF Electricité de France EFPY Effective Full Power Years EFPH Effective Full Power Hours EPRI Electric Power Research Institute FEA Finite Element Analysis FENOC First Energy Nuclear Operating Corporation FMEA Failure Mode and Effects Analysis GAO US Congress General Accounting Office GL Generic Letter (NRC) gpm Gallons Per Minute HVAC Heating, Ventilation, and Air Conditioning ID Inner Diameter IGA Inner Granular Attack ILRT Integrated Leak Rate Test IN Information Notice (NRC)

INPO Institute for Nuclear Power Operations ISI Inservice Inspection ksi Kilopounds per Square Inch LER Licensee Event Report LLTF Lessons Learned Task Force (NRC)

LOCA Loss of Coolant Accident MRP Materials Reliability Program (EPRI)

MWe Megawatts Electric NDE Non-Destructive Examination NEI Nuclear Energy Institute BN63097.001 B0T0 1106 DB05 xviNEIL Nuclear Electric Insurance Limited NRC US Nuclear Regulatory Commission NRR Nuclear Reactor Regulation NSSS Nuclear Steam Supply System NUMARC Nuclear Management and Resource Council OD Outer Diameter PCAQ Potential Condition Adverse to Quality psi Pounds per Square Inch PT Dye Penetrant Testing PWR Pressurized Water Reactor PWSCC Primary Water St ress Corrosion Cracking QA Quality Assurance QC Quality Control RAI Request for Additional Information RB Reactor Building RCPB Reactor Coolant Pressure Boundary RCS Reactor Coolant System RFO Refueling Outage RPV Reactor Pressure Vessel SCC Stress Corrosion Cracking SIA Structural Integrity Associates SWRI Southwest Research Institute TECO Toledo Edison Company TVA Tennessee Valley Authority UT Ultrasonic Testing BN63097.001 B0T0 1106 DB05 xviiVHP Very High Pressure WOG Westinghouse Owners Group