ML071790153

From kanterella
Revision as of 10:20, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Meeting to Discuss the New Emergency Notification System - Indian Point Nuclear Generating Station, Units 2 and 3
ML071790153
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/28/2007
From: Collins S J
Region 1 Administrator
To: Dacimo F
Entergy Nuclear Operations
References
EA-05-190, EA-07-092
Download: ML071790153 (7)


Text

June 28, 2007EA-07-092EA-05-190Mr. Fred DacimoSite Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

MEETING TO DISCUSS THE NEW EMERGENCY NOTIFICATION SYSTEM -INDIAN POINT NUCLEAR GENERATING STATION, UNITS 2 AND 3

Dear Mr. Dacimo:

The purpose of this letter is to inform Entergy that the NRC has scheduled a meeting on July 9,2007, to discuss your actions associated with completing the installation and testing of the new Emergency Notification System (ENS) at the Indian Point Energy Center. The meeting will be held at the Colonial Terrace in Cortlandt Manor, New York, and will be open for public observation. Representatives from the Federal Emergency Management Agency (FEMA) will also attend the meeting. The meeting announcement can be viewed at the NRC public website http://www.nrc.gov/public-involve/public-meetings/index.cfm.The NRC has reviewed your plans to comply with the NRC's Confirmatory Order and would liketo discuss these activities at the meeting. The NRC committed to conduct this meeting in our letter denying your request for a second extension of the Confirmatory Order on April 13, 2007.

This meeting is being held to obtain the information necessary to enable the NRC to better understand the actions that Entergy has completed and planned for achieving compliance with the Confirmatory Order and to evaluate your response to our Notice of Violation. In addition, we intend to use the information gathered during this meeting to assist the NRC in deciding the need for additional regulatory action. Enclosure 1 provides specific topics for discussion at themeeting. Please be prepared to provide a presentation at the meeting to address these issues.

F. Dacimo2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,/RA/Samuel J. CollinsRegional AdministratorDocket Nos.50-247, 50-286License Nos.DPR-26, DPR-64

Enclosures:

As stated F. Dacimo2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,/RA/Samuel J. CollinsRegional AdministratorDocket Nos.50-247, 50-286License Nos.DPR-26, DPR-64

Enclosures:

As statedDISTRIBUTION w/encl

ADAMS (PARS)

SECY CA OEMAIL OEWEB LReyes, EDO WKane, DEDR CCarpenter, OE LLopez, OE RTaylor, OE SMagruder, OE SMerchant, OE LSreenivas, OE LChandler, OGC BJones, OGC GVeneziano, OGCJDyer, NRRMWeber, NRR BBoger, NRR JLubinski, NRR JLamb, OEDO MCheok, RES Enforcement Coordinators RII, RIII, RIV EHayden, OPA HBell, OIG GCaputo, OI TGrancorvitz, OC DScrenci/NSheehan, RI ECobey, RI MCox, RI DJackson, RI KFarrar, RIDHolody, RI RSummers, RI CO'Daniell, RI R1DRP_Mail Region I OE Files (with

concurrences)

SCollins, RA MDapas, DRA MKowal, NRR JBoska, PM, NRR JHughey, NRR RMartin, DRP MGamberoni, DRS JTrapp, DRSSUNSI Review Complete: rjs (Reviewer's Initials

)ADAMS ACCESSION NO. ML071790153DOCUMENT NAME: C:\FileNet\ML071790153.wpd After declaring this document "An Official Agency Record" it will not be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICERI/ORARI/DRPRI/DRPRI/DRSRI/DRSRI/RCNAME*RSummers*ECobey*DLew*JTrapp*MGamberoni*KFarrarDATE06/26/0706/26/0706/26/0706/26/0706/20/0706/26/07OFFICERI/ORARI/RAHQ/NSIRNAME*DHolodySCollins/SJC*NMamish (viaphone call TLO)DATE06/26/0706/28/0706/27/07OFFICIAL RECORD COPY*See previous concurrence page for original signatures F. Dacimo3cc w/encl:G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President for Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations W. Campbell, Senior Vice President of Engineering and Technical Services C. Schwarz, Vice President, Operations Support (ENO)

K. Polson, General Manager Operations O. Limpias, Vice President, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. D. Faison, Manager, Licensing (ENO)

R. Patch, Director of Oversight (ENO)

J. Comiotes, Director, Nuclear Safety Assurance P. Conroy, Manager, Licensing T. C. McCullough, Assistant General Counsel, Entergy Nuclear Operations, Inc.

M. Balboni, Deputy Secy, New York State Energy, Research and Development Authority Assistant General Counsel, Entergy Nuclear Operations, Inc.

P. Eddy, Electric Division, New York State Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law D. O'Neill, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc.

Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning B. Brandenburg, Assistant General Counsel Assemblywoman Sandra Galef, NYS Assembly County Clerk, Westchester County Legislature A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congressman John Hall Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer G. Shapiro, Senator Clinton's Staff J. Riccio, Greenpeace P. Musegaas, Riverkeeper, Inc.

M. Kaplowitz, Chairman of County Environment & Health Committee F. Dacimo4A. Reynolds, Environmental AdvocatesD. Katz, Executive Director, Citizens Awareness Network S. Tanzer, The Nuclear Control Institute K. Coplan, Pace Environmental Litigation Clinic M. Jacobs, IPSEC D. C. Poole, PWR SRC Consultant W. Russell, PWR SRC Consultant W. Little, Associate Attorney, NYSDEC M. J. Greene, Clearwater, Inc R. Christman, Manager Training and Development J. Spath, New York State Energy Research, SLO Designee A. J. Kremer, New York Affordable Reliable Electricity Alliance (NY AREA)

F. Dacimo5 ENCLOSURE 1Proposed Discussion Topics for July 9, 2007Public Meeting with Entergy1.Status of commitments made in Entergy's May 23, 2007, response to the April 23, 2007,Notice of Violation;2.Interactions between Entergy and the Federal Emergency Management Agency toresolve concerns regarding new ENS performance as described in your June 13, 2007, letter;3.Status of resolving county concerns regarding the new ENS system, including trainingplans and procedures;4.Status of Entergy public outreach efforts relevant to the new ENS system; 5.Method used by Entergy to determine the satisfactory performance of individual sirensprior to declaring the system operational;6.Method to be used by Entergy to declare functionality and operability for each mode ofENS operation;7.Method to be used by Entergy to establish activation reliability prior to declaring the newENS system operational;8.Entergy's program for maintaining activation reliability once the new ENS system isdeclared operational; and,9.Entergy management involvement in the new ENS system since April 15, 2007.