Ltr. to D. Young Crystal River Unit 3 - NRC Material Control and Accounting Program Inspection
ML072050390
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/07/2007
From: Westreich B C
NRC/NSIR/DSO/DDSO/RSOB
To: Young D E
Progress Energy Florida
votolato, dori, nsir/dso/rsob, 415-7633
Shared Package
ML072050386 List:
References
IR-07-201
Download: ML072050390 (5)


Text

Official Use Only - Security-Related InformationOfficial Use Only - Security-Related InformationAugust 7, 2007Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &Regulatory Programs15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTINGPROGRAM INSPECTION - REPORT 05000302/2007201

Dear Mr. YoungOn May 21-24,

2007, the U.S. Nuclear Regulatory Commission (NRC) conducted a materialcontrol and accounting (MC&A) safeguards inspection at your Crystal River Unit 3. The inspection was conducted under Phase III of Temporary Instruction 2515/154. The enclosedinspection report documents the inspection findings which were discussed with you and other members of your staff during an exit meeting on May 24, 2007.The inspection examined activities conducted under your license as they relate to safety,security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed storage of special nuclear material in the spent fuel pool, and interviewed key personnel. Areas examined during the inspection included physical inventory and accounting records.Based on this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, this letter's enclosure will not be available for public inspection.When separated from the Enclosure, thisdocument is DECONTROLLED.

Official Use Only - Security-Related InformationOfficial Use Only - Security-Related InformationD. Young In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from NRC's documentsystem ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).Should you have any questions concerning this report, please contact Martha Williams at (301) 415-7878 or Dori Votolato (301) 415-7633.Sincerely, Barry Westreich, Chief /RA by FP for/ Reactor Security Oversight Branch Division of Security Operations Office of Nuclear Security and Incident ResponseDocket Nos. 50-302License Nos. DPR-72

Enclosure:

MC&A Inspection Report 05000302/2007201w/

Attachment:

Supplemental Informationcc w/enclosure: Attached list Official Use Only - Security-Related InformationOfficial Use Only - Security-Related InformationD.Young In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from NRC's documentsystem ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).Should you have any questions concerning this report, please contact Martha Williams at (301) 415-7878 or Dori Votolato (301) 415-7633.Sincerely, Barry Westreich, Chief /RA by FB P for/Reactor Security Oversight Branch Division of Security Operations Office of Nuclear Security and Incident ResponseDocket Nos. 50 - 302License Nos. DPR-72

Enclosure:

MC&A Inspection Report 05000302/2007201w/

Attachment:

Supplemental Informationcc w/enclosure: Attached listDistribution w/encl

CAdkison, NSIRAMcLeod, NSIRJRobinson, NRRRBerryman, RIIMErnstes, RII DRiffle, NSIRTMorrisey, RIIRReyes, RII SBailey, NRR Document Sensitivity, Package and Report: SensitiveAvailability: Non-Publicly AvailableDocument Sensitivity, Letter: Non-SensitiveAvailability: Publicly AvailablePackage: ML072050386, Cover Letter: ML 072050390, Report: ML 072050420 Log-In #

XXXXOFFICEDSO/RSOBEDSO/RSOBERIIEDSO/RSOBNNAMEDVotolato*MWilliams*RBerryman*-emailBwestreich*FPforDATE08/ 7 /200708/ 7 /200708/7/200707/ 7 /2007OFFICIAL RECORD COPY Official Use Only - Security-Related InformationOfficial Use Only - Security-Related Information Official Use Only - Security-Related InformationOfficial Use Only - Security-Related InformationD. Young cc w/enclosure:William A. Passetti, Chief Bureau of Radiation Control Florida Department of Health 4052 Bald Cypress Way, SE, Bin C21 Tallahassee, FL 32399-1741 cc w/o enclosure:

Jon A. FrankeDirector Site Operations Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708Michael J. AnnaconePlant General Manager Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708Phyllis DixonManager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 West Power Line Street Crystal River, FL 34428-6708