Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20054F248 | 8 June 1982 | Forwards IE Enforcement Conference Rept 50-344/82-19 on 820507 | |
ML20054F855 | 10 June 1982 | Forwards Amend 74 to License NPF-1 & Notice of Issuance & Availability.Amend Deletes Certain Tech Spec Requirements for Pump & Valve Testing Now Covered Under 10CFR50.55a | |
ML20054G611 | 4 June 1982 | Forwards IE Insp Rept 50-344/82-12 on 820316-0430. Enforcement Action to Be Subj of Separate Correspondence | |
ML20054G810 | 2 June 1982 | Forwards IE Insp Rept 50-344/82-16 on 820503-07.No Noncompliance Noted | |
ML20054H354 | 8 June 1982 | Requests That Util Continue to Apply Interim Operating Restrictions Until Westinghouse 820120 Rept Reviewed,Per Util Re Intent to Return to Unrestricted Automatic Rod Control Commencing W/Startup for Fuel Cycle 5 | |
ML20054H892 | 16 June 1982 | Responds to Re Changes to Facility Security Plan. Changes Consistent w/10CFR50.54(p) | |
ML20054J056 | 18 June 1982 | Responds to 820205 Request for Relief from Certain ASME Code Section XI Requirements.Relief Granted Until 860520.Forwards Safety Evaluation & Notice of Granting of Relief | |
ML20054J215 | 11 June 1982 | Forwards IE Insp Rept 50-344/82-18 on 820419-0528.No Noncompliance Noted | |
ML20054L569 | 18 June 1982 | Confirms 820618 Telcon Between Jl Crews & Bd Withers Re Degradation of Thermal Sleeve Components in Rcs.Power Operation Will Not Resume Until Matter Resolved | |
ML20054L592 | 15 June 1982 | Forwards IE Insp Rept 50-344/82-17 on 820525-28.No Noncompliance Noted | |
ML20055A500 | 30 June 1982 | Responds to Re Acceptability of Corbin 436 & 437 Combination Padlock for Protecting Safeguards Info.Padlocks Should Meet Criteria of Reg Guide 5.12, General Use of Locks in Protection & Control of Facilities & Snm | |
ML20055C388 | 12 February 1990 | Forwards Mgt Meeting Rept 50-344/90-01 on 900112.Licensee Must Thoroughly Follow Through on Implementation of Improvement Plans & Place High Priority on Assuring That Personnel Understands Goals & Objectives | |
ML20055C748 | 18 June 1990 | Forwards Amend 161 to License NPF-1 & Safety Evaluation. Amend Changes Qualification Requirements,As Specified in Tech Spec 6.3.1,that Must Be Met by Radiation Protection Manager | |
ML20055E406 | 3 July 1990 | Discusses 900630 Submittal Re Reduced Measured Min RCS Flow for Plant.New Measured Min Flow Limit for RCS Flow Will Be Reflected in Proposed Change to Tech Specs to Be Submitted by 900713 | |
ML20055E785 | 9 July 1990 | Forwards Safety Evaluation Re Procedures Generation Program for Plant,Per Util 831110 & s.Ltrs Should Be Reviewed to Address Programmatic Improvements Outlined in Section 2 of Rept | |
ML20055G631 | 6 July 1990 | Forwards Insp Rept 50-344/90-16 on 900506-0609.No Violations or Deviations Noted | |
ML20055H321 | 13 July 1990 | Advises That 900330 & 0504 Amend 22 to Radiological Emergency Plan Meets 10CFR50.54(q) Requirements & Acceptable | |
ML20055H567 | 11 July 1990 | Forwards Insp Rept 50-344/90-19 on 900611-15 & Notice of Violation | |
ML20056A047 | 20 July 1990 | Forwards SALP Mgt Meeting Insp Rept 50-344/90-22 on 900615 | |
ML20056A514 | 3 August 1990 | Advises That Response to NRC Bulletin 88-010, Molded Case Circuit Breakers, Complete,Per 890331,0414,0725 & s.If Subsequent Insp Identifies Deficiencies in Actions & Responses,Issue Will Be Reopened | |
ML20056A623 | 1 August 1990 | Forwards FEMA Rept Re Observation of Offsite Activities During Plant Emergency Preparedness Exercise on 891115.NRC Understands That FEMA Rept for 900724,remedial Drill Will Close Five Deficiencies.W/O Encls | |
ML20056B242 | 15 August 1990 | Advises That 900712 & 31 Responses to SALP Rept 50-344/90-09 Appropriate.Page 18 of Initial Rept Changed to Relect Effort by Util Engineering Groups in Design of ATWS Mitigation Sys Actuation Circuitry,Per 900615 Board Meeting | |
ML20056B251 | 21 August 1990 | Forwards Safeguards Insp Rept 50-344/90-23 on 900719-0817. Violation Noted But Not Cited.Characterization of Apparent Violation in Insp Rept May Change as Result of Further NRC Review.Enforcement Conference Scheduled for 900830 | |
ML20056C863 | 25 June 1993 | Forwards Insp Rept 50-344/93-08 on 930422-0531.No Violations Noted | |
ML20056C918 | 9 June 1993 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept to License NPF-1 | |
ML20056E424 | 12 August 1993 | Forwards Insp Rept 50-344/93-10 on 930706-08.No Violations Noted | |
ML20056G004 | 25 June 1993 | Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process | |
ML20057A661 | 9 September 1993 | Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing.Amend to Revise TS Re Fire Protection Program | Fire Protection Program |
ML20057C519 | 3 September 1993 | Informs That Staff Will Defer Further Review of Licensee Proposed Rev to Plant QA Program Until NRR Has Completed Evaluation & TS Changes Have Been Approved | |
ML20057C586 | 8 September 1993 | Forwards Insp Rept 50-344/93-11 on 930706-0816.No Violations or Deviations Noted | |
ML20057D069 | 22 September 1993 | Forwards Amend 192 to License NPF-1 & Safety Evaluation. Amend Relocates Portions of Plant TS Re Fire Protection Program from Topical Rept PGE-1012 | Fire Protection Program |
ML20057D215 | 21 September 1993 | Advises That Changes Submitted by Rev 39 to Plant Physical Security Plan,Found to Be Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20057D990 | 30 September 1993 | Forwards Exemption from Portions of 10CFR50.54(q) & Certain Sections of 10CFR50.47, Emergency Plans, & 10CFR50 App E, Content of Emergency Plans for Plant.Se Supporting Exemption Also Encl | |
ML20057E743 | 24 September 1993 | Forwards Insp Rept 50-344/93-13 on 930913-17.No Violations Noted | |
ML20058A323 | 12 October 1990 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/90-20 | |
ML20058A580 | 17 November 1993 | Forwards Exemption from Certain Requirements of 10CFR50.54(w) Which Requires Licensee to Obtain & Maintain Min of $1.06 Billion of Decontamination Insurance Coverage, Per Util 930708 Request.Ea & Fonsi Also Encl | |
ML20058B638 | 12 October 1990 | Forwards Revised Section 1, Persons Contacted of Insp Rept 50-344/90-20,correcting Errors in Personnel & Positions | |
ML20058F376 | 1 November 1990 | Ack Receipt of Re Corrective Actions Taken in Response to Violations Noted in Insp Rept 50-344/90-23 | |
ML20058K118 | 6 December 1993 | Forwards Amend 193 to License NPF-1 & Safety Evaluation. Amend Relocates RETS to ODCM & PCP in Accordance W/Gl 89-01 & Changes Required Frequency for Submittal of Radioactive Effluent Release Rept from Semiannual to Annual | |
ML20058L440 | 2 August 1990 | Forwards Corrected Amend 161 to License NPF-1,revising Items 6.4.1 & 6.4.2 Re Administrative Controls |