Forwards Exemption from Portions of 10CFR50.54(q) & Certain Sections of 10CFR50.47, Emergency Plans, & 10CFR50 App E, Content of Emergency Plans for Plant.Se Supporting Exemption Also Encl
ML20057D990
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/30/1993
From: Masnik M
Office of Nuclear Reactor Regulation
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20057D992 List:
References
TAC-M85980, NUDOCS 9310070039
Download: ML20057D990 (4)


Text

-

,...,A a

f1 1

S UNITED STATES

{

-f NUCLEAR REGULATORY COMMISSION g

g W ASHINGTON, D.C, 20555M1

~

September 30, 1993 Docket No. 50-344 Mr. James E. Cross Vice President and Chief Nuclear Officer Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cross:

SUBJECT:

EXEMPTION FROM PORTIONS.0F 10 CFR 50.54(q) AND CERTAIN SECTIONS OF 10 CFR 50.47, " EMERGENCY PLANS," AND 10 CFR 50, APPENDIX E, " CONTENT OF EMERGENCY PLANS" FOR THE TROJAN NUCLEAR PLANT (TAC NO. M85980)

By letter dated March 9,1993 Portland General Electric (PGE) requested exemption to certain sections of 10 CFR 50.47, " Emergency Plans", and 10 CFR Part 50, Appendix E, Paragraph IV, " Content of Emergency Plans." Due.to the non-operating defueled condition of the Trojan Nuclear Plant, you requested that offsite emergency preparedness be eliminated and the Trojan Emergency.

Plan address only onsite activities.

Based on the considerations' discussed in the exemption, we have concluded that the information provided, and the actions described in the application, form -

an acceptable basis for granting the enclosed exemption. The Commission has determined, pursuant to 10 CFR 50.12, that the exemption is authorized by' law, will not present an undue risk to the public health and' safety, and is consistent with the common defense and security.

A copy of the exemption is being forwarded to the Office of the. Federal Register for publication. Also enclosed are copies of the staff. Safety

- Evaluation in support of the Exemption, and the Environmental Assessment and' Finding of No Significant' Impact.

M10 Ffi.E DEfRER COPY 931007'039 930930 0

PDR ADOCK 05000344 O

P PDR A

}(g

(

F Mr. James E. Cross September 30, 1993 The staff has also completed the review of the proposed Permanently Defueled Emergency Plan (PDEP) for the Trojan Nuclear Plant submitted by letter dated March 9, 1993 and revised on September 23, 1993. The staff has concluded that implementation of the Trojan PDEP will maintain an acceptable level of emergency preparedness for the plant in its shutdown and defueled condition.

Therefore, the staff approves the Trojan PDEP.

Sincerely, ORIGINAL SIGNED BY Michael T. Masnik, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation i

Enclosures:

l As stated cc w/ enclosures:

See next page DISTRIBUTION:

DocketJ File 50-344s MMasnik LBell PDRs OGC (15-B-18)

ONDD r/f EJordan (MNBB 3701)

TMurley/FMiraglia (12-G-18)

GHill (2) (P-137)

JPartlow (12-G-18)

ACRS (10) (P-315) i ERossi (9-A-2)

OPA (2-G-5) i JLieberman (7-H-5)

SECY (Orders only) l BGrimes 0C/LFDCB (MNBB 4503)

SWeiss JMitchell RDudley Region V f

EHylton JAustin (5-E-4)

  • See p evious concurrence OND
ONDD
PM //p4f OND C*

OGC*

ONDD:D*

on MMasnik:'dmj RDudley MYoung SWeiss rimes 9/p/93 7 /35/93 9/17/93 9/22/93 9/23/93 9/p/93 -

0FFICIAL RECORD COPY DOCUMENT NAME: A:E-85980.MM (TROJAN DISK)

I i

IEdS b!E OE@YE!! @6?Y j

j E

1 4

Mr. James E. Cross The staff has also completed the review of the proposed Permanently Defueled Emergency Plan (PDEP) for the Trojan Nuclear Plant submitted by letter dated March 9, 1993 and revised on September 23, 1993. The staff has concluded that implementation of the Trojan PDEP will maintain an acceptable level of emergency preparedness for the plant in its shutdown and defueled condition.

Therefore, the staff approves the Trojan PDEP..

Sincerely, 8

l Michael T. Masnik, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures:

See next page i

e r

I

Mr. James E. Cross Trojan Nuclear Plant Portland General Electric Company Docket No. 50-344 cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant P. O. Box 250 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy i

Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Tom Walt General Manager, Technical Functions Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road r

Boring, Oregon 97009 Mr. Jerry Wilson Do It Yourself Committee 570 N.E. 53rd Hillsboro, Orogon 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, Oregon 97204 1

O