ML20057D215

From kanterella
Jump to navigation Jump to search
Advises That Changes Submitted by Rev 39 to Plant Physical Security Plan,Found to Be Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20057D215
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/21/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 9310010270
Download: ML20057D215 (1)


Text

--

t l

t i

SEP 2i TS Docket No. 50-344 Portland General Electric Company I

121 S. W. Salmon Street i

Portland, Oregon 97204 i

Attention: Mr. James E. Cross Vice President and Chief Nuclear Officer, Nuclear Division This acknowledges the receipt of your letter, dated August 3,1993, by which you transmitted Revision 39 to the Trojan Nuclear Plant Physical Security Plan (PGE 1017).

We find the changes submitted by this revision to be consistent with the provisions of 10 CFR Part 50.54(p). Accordingly, they are acceptable for inclusion into the Plan.

Attachments 11 to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosure.

Sincerely,

/

obert J.

a e, Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch cc:

Service List Document Control Desk, HQ /.

NRR Docket File, HQ N. Ervin, PSGB, NRR D. Schaefer, RV bec:

M. Smith Central Files RV/cb REQUEST C0P.Y REQUEST COPY END TO PDR JENDTODCS QES/NO, W~

YES/NO},j

' YES/NO RYES /NO V

v RPat(e~

DSchaefer 9/ )o /93 9/h /93

)

f;/$))

/

>0; 120051

,l/-

b 1

I_~

'