Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20136E9266 March 1997Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222Fitness for Duty
Nondestructive Examination
Missed surveillance
Foreign Material Exclusion
Systematic Assessment of Licensee Performance
Liquid penetrant
Fire Protection Program
ML20136J29514 November 1985Forwards Assessment of LERs to Be Used as Input to SALP Evaluation.Lers Found to Be of Acceptable Quality Compared to Other Units.Large Number of Personnel Involved in LER Preparation Has Kept Plant from Obtaining Higher ScoresSystematic Assessment of Licensee Performance
ML20137K9824 September 1996Agrees W/Epri Re St Lucie Insp Rept on PDI Test SpecimensRod Drop Event
Liquid penetrant
ML20137L03513 March 1995Forwards Summary of Changes Made to Safeguards Review Rept, Rev 4 & 43 to St Lucie Physical Security Plan,Case Control Numbers 70VAV26217 & 71VAV26219.W/o Encl
ML20137L06114 July 1994Forwards Summary of Changes Made to Safeguards Review Rept, Rev 40 to St Lucie Physical Security Plan,Case Control Number N5S68VA50033594.W/o Encl
ML20137L09825 March 1997Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl
ML20137L1506 January 1993Forwards Summary of Changes Made to Safeguards Review Rept Rev 36 to St Lucie Physical Security Plan,Case Control Number N5S62VA50033593.W/o Encl
ML20137L16819 July 1995Forwards Summary of Changes Made to Safeguards Review Rept Rev 45 to St Lucie Physical Plan,Case Control Number N5S74VA50033595 & Rev 17 to Training Plan,Case Number N5T73VG50033595.W/o Encl
ML20137L20922 May 1995Forwards Summary of Changes Made to Safeguards Review Rept, Rev 44 to St Lucie Physical Security Plan,Case Number N5S72VA50033595.W/o Encl.Rev Acceptable for Inclusion in Plan
ML20137L23125 March 1997Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl
ML20137L2376 March 1995Forwards Summary of Changes Made to Safeguards Review Rept, Rev 41 to St Lucie Physical Security Plan,Case Control Number N5S69VA50033595.W/o Encl
ML20137L25212 October 1993Forwards Summary of Changes Made to Safeguards Review Rept, Rev 8 to St Lucie Physical Security Plan,Case Control Number N5S65VA50033593.W/o EnclBoric Acid
ML20137L27516 December 1996Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate EvaluationFitness for Duty
ML20137L29731 March 1997Forwards Matrix Containing Answer to Listed Questions in ,Rev 1Safe Shutdown
Boric Acid
Maintenance Rule Program
Fire Protection Program
ML20137L30330 August 1996Informs That Changes Contained in Re Rev 29 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,App E
ML20137L30731 July 1995Advises That Changes in Rev 28 to St Lucie Plant Emergency Plan,Consistent W/Provisions of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,App E
ML20137L31425 April 1995Advises That Changes to St Lucie Nuclear Plant Emergency Plan,Rev 27 Consistent W/Provision of 10CFR50.54(b) 10CFR50.47(b),10CFR50,App E & Section II of NUREG-0654, W/Exception for Issues of Modes 5 & 6 EALsReactor Vessel Water Level
Time to boil
Siren
ML20137L32231 October 1994Advises That Changes in Revs 25 & 26 to Radiological Emergency Plan for St Lucie Plant,Consistent W/Provisions of 10CFR50.54(q)
ML20137L85318 July 1994Submits List of Generic Issues Arising from Plan Changes for Turkey Point & St Lucie,Per 940718 Telcon
ML20137L8804 February 1994Advises That Changes to Rev 24 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q), 10CFR50.47(b) & App E to 10CFR50
ML20137L8972 August 1993Advises That Changes in Rev 23 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q), 10CFR50.47(b),10CFR50 & App E to 10CFR50Internal Flooding
ML20137L9348 December 1995Forwards Input Feeder Info on Licensee Performance at St Lucie Facility During Period of 940102-960106Systematic Assessment of Licensee Performance
ML20137L94816 July 1996Submits List of Items Considered in Decision to Identify Issues as NCV
ML20137L96127 January 1994Transmits Exercise Scenario Package & Provides Work Assignments & Planning Guidance for St Lucie Nuclear Station 940209 Emergency Preparedness ExerciseBoric Acid
Fitness for Duty
Shutdown Margin
Grab sample
Fire Barrier
Stroke time
Through-Wall Leak
Fire Protection Program
Scaffolding
Downpower
ML20137M5415 August 1995Provides List of Items Observed on 950805 While Entering Reduced RCS Inventory Condition to Support RCP Seal Replacement Work
ML20137P23611 October 1995Forwards Proposed Enforcement Action for Plant,Unit 1 Proposed Severity Level III Problem & Use of Discretion to Impose $50,000 Civil Penalty,For Review & Concurrence. Related Documentation Encl
ML20137P50930 August 1996Forwards Proposed Enforcement Action for Plant NOV & Proposed Imposition of Civil Penalty,For Review & Concurrence.Related Documentation EnclEnforcement Discretion
ML20137P52521 November 1985Notification of 851203 Meeting W/Util,Bnl & Westinghouse in Bethesda,Md to Discuss Results of Review of Facility Limiting Condition for Operation Relaxation Program
ML20137P53310 October 1995Informs That Separate Rept on St Lucie Relief Valve Issue Will Be Issued on 951020
ML20137P56523 May 1996Forwards Response from C Grimes Re TS Issue
ML20137P58923 May 1996Discusses TS Policy Question Re Vortexing in Refueling Water Tank & Requests Assistance Determining Where Policy/Position Was Documented
ML20137P6317 November 1995Informs That St Lucie Enforcement Discretion Can Be IssuedEnforcement Discretion
ML20137P64727 October 1995Requests That Brief Listing of Missed Opportunities Be Submitted Re Milhoan Presentation of St Lucie $50,000 Enforcement Discretion for Agreement to TaylorEnforcement Discretion
ML20137P67530 October 1995Informs That Status of St Lucie Enforcement Briefing Package Has Been Revised & Conversation to Firm Up Regulatory Basis for Action Scheduled for Afternoon of 951030
ML20137P71911 June 1993Forwards Background Info on St Lucie & Turkey Point,For Use in Preparing for 930624 Visit W/Chairman & CommissionersSystematic Assessment of Licensee Performance
ML20137Q9996 March 1995Informs That St Lucie,Unit 1 Experienced Loss of Shutdown Cooling on 950305 Caused by Operator Error
ML20137R23628 March 1996Informs That IA Number 96-019 for Operator Involved in St Lucie Dilution Issue & Discusses Whether Separate EA Number NeededBoric Acid
Shutdown Margin
Unidentified leakage
Overexposure
ML20137R25325 March 1996Forwards Enforcement Notification for Approval of Changes by J Gray Made in Middle of Second ParagraphBoric Acid
ML20137R53822 November 1996Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping
ML20137R88327 March 1997Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing BasisSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Fire Barrier
Contraband
Past operability
Probabilistic Risk Assessment
Coatings
Temporary Modification
Fire Protection Program
Backfit
Unidentified leak
ML20137R9036 November 1996Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by ResidentsShutdown Margin
Grab sample
Locked High Radiation Area
Fuel cladding
Fire Protection Program
Backfit
Downpower
ML20137R95222 March 1995Informs That Plant Performance Review of Listed Plants Was Held on 950316Fitness for Duty
Enforcement Discretion
Coatings
Backfit
ML20137Y47918 March 1996Partially Deleted Reply Re St Lucie OperatorSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Power Operated Valves
ML20137Y49819 August 1996Provides Bridge Number for St Lucie Conference.Partially Deleted
ML20137Y5034 October 1996Informs That St Lucie Maint Rule Baseline Insp Violations Panel,Forwarded
ML20137Y5073 October 1996Informs That St Lucie Maint Rule Baseline Insp Violations Panel Will Be Conducted on 961007.Partially Deleted
ML20137Y5142 October 1996Forwards Draft NOV & Insp Rept Re Maint Rule Baseline Insp Conducted at St Lucie Plant on 960916-20Safe Shutdown
Boric Acid
Maintenance Rule Program
ML20137Y51825 October 1996Informs That Region III Enforcement Panel Will Be Held in Incident Response Ctr on 961030.Partially Deleted
ML20137Y5405 November 1996Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted
ML20137Y6935 December 1985Discusses Efforts Concerning Plant Core Melt Frequency estimate.PRA-type Study Indicates Plant Core Melt Frequency Presently Approx 1.2x10-3/yr.Recommendation Re Restart Will Be Made Prior to 851211