SUBJECT:
SIMILAR (REPEAT) SL-VIOLATION; NO ESCALATED ENFORCEMENT PROPOSED FACILITY:
ST. LUCIE INSPECTION REPORT NO.:
50-335, 50-389/96-09 During an inspection conducted at the St. Lucie site, during the period of February 25 through March 1,1995, F. Wright identified a procedural violation concerning the control of contaminated tools.
Independent surveys made by the inspector in the licensee's hot tool room identified a few hand tools that were slightly above the licensee's limit for loose contamination on tools utilized in the RCA.
The tools were only slightly above the 1,000 dpm/100 cm2 limits for loose contamination. The licensee did not have good control of tools entering and exiting the hot tool room.
The licensee assigned a worker to the hot tool room for coverage on part of the day shift and stated the room would be locked when unattended.
This appeared to be an acceptable level of corrective action and the decision was made to identify the issue as a NCV.
The following was considered in the decision to identify the issue as a NCV.
o There were only 4 or 5 tools found contaminated;
.o The contamination levels were low (less than 2,000 dpm/100 cm2 vs the 1,000 dpm/100 cm' limit for loose contamination); and o
No contaminated material was found outside the RCA During the most recent radiation protection inspection at St. Lucie the inspector found that the licensee had spent'approximately 278 hours0.00322 days <br />0.0772 hours <br />4.596561e-4 weeks <br />1.05779e-4 months <br /> surveying tool rooms just prior to or during the first few days of the inspection (June 17-21, 1996).
This special effort was made to find and remove any contaminated tools the NRC inspector might find during his independent surveys.
The thoroughness of the licensee's tool room surveys was not typical total effort for surveying tool rooms in any given month.
The licensee's surveys found numerous contaminated tools in the clean tool room located outside the RCA and numerous contaminated tools located in the RCA tool rooms having loose contamination in excess of the licensee's contamination limits.
~
/
BINDER 96-485 PDR
s Y
Albert Gibson 2
A decision was made to use the licensee's findings in SL IV Violation as the licensee did not have adequate controls for contaminated tools and numerous examples were identified.
i Since the first violation indicated only minor problems the licensee did not make any program changes other than to lock the hot tool room when unattended.
Considering the inspectors findings, this appeared acceptable corrective 2
action at the time.
However, this corrective action would not have any impact i
on the controls for tools entering the clean tool room or the temporary tool 4
rooms established during outages, where many of the contaminated tools were recently found in June 1996 surveys.
I While the violations were similar in that they involved inadequate control of contaminated tools they were also not similar in that the problem was not i
limited to one tool room as initially believed when the NCY was identified.
i The scope of the problem increased with contaminated tools found outside the 1
RCA. We did not expect the licensee to do much corrective action with the inspectors findings in February of 1996.
The licensee's corrective actions would not have prevented some of the violations identified in June 1996.
Therefore, upon our review we do not. recommend that the recent violations identified at St. Lucie in June 1996, be paneled for enforcement conference or escalated enforcement.
d 5
i 2
i I
3 4
4 i
I l
ie SAuP PB40 b
/ ~$.
i
/NAtf i
IV PLANT SUPPORT ISSUE 1.
Radiological' Controls - External Exposure' Control g.
EXAMPLE a.
All Personnel radiation exposures have been less than regulatory-limits.
DATE l-02/28/94 03/04/94 11/14/94 11/18/94 i
REFERENCE f" #-
l IR-94-07; P-5 hr [
IR-94-23; P-5 Os g l
NRC CONTACT F. W'right l
-ASSESSMENT The licensee continued to maintain an effective external exposure control program.
l l
EXAMPLE b.
1994 collective dose was above average at 252.5 I
person-rem / unit.with two RFOs in 1994.
l DATE l
05/30/95 - 06/02/95 i
REFERENCE l
IR-95-11; P-9
&c h NRC CONTACT B.
Parker l
ASSESSMENT The 1994 collective dose was typical of an effective ALARA program.
EXAMPLE c.
Improved accuracy of licensee dosimeters DATE 11/14/94 - 11/18/94 I
REFERENCE IR-94-23; P-5 fac g s
NRC CCITI'ACT F. Wright ASSESSMENT The licensee improved the quality controls and accuracy of electronic alarming dosimeters utilized'in the external dosimetry monitoring i
program 8
i L
i 1
l t
6 IV PLANT SUPPORT ISSUE 2.
Radiological Controls - Internal Exposure Control i
EXAMPLE ~
a.
Internal exposures have been minimal and well below regulatory limits.
DATE 06/02/95 05/30/95 REFERENCE IR-95-11; P-9 Po r k NRC CONTACT 3.
Parker ASSESSMENT Licensee continued implemented an effective internal exposure control program.
EXAMPLE b.
Licensee continued to assess and assigns minor internal exposures.
DATE 05/30/95 - 06/02/95 REFERENCE IR-95-11; P-9 P&'b NRC CONTACT B.
Parker ASSESSMENT Maintains good radiation protection policy concerning internal dose assignments A
1
4 i
IV PLANT SUPPORT ISSUE 3.
Radiological Controls - Radiological Work Control i
EXAMPLE a.
Radiological Postings DATE 03/04/94 02/28/94 REFERENCE IR-94-07; P-6 p
r, NRC CONTACT l
D. Forbes ASSESSMENT Radiological Postings have been conservative and appropriate i.
i EXAMPLE b.
Radiation Work Permits DATE 02/28/94 - 03/04/94 1
11 '14/94 11/18/94
^
REFERENCE 4
E"ief f
\\
IR-94-07; P-8 l
IR-94-23; P-5 &6 s
Lr NRC CONTACT l
l D.
Forbes i
F. Wright ASSESSMENT i
RWPs effectively addressed radiological protection l
concerns and provide for proper radiological controls EXAMPLE c.
Licensee use of remote monitoring equipment i
DATE 02/28/94 - 03/04/94 1'
11/14/94 - 11/18/94 j
REFERENCE fe'MFi"4 g d
IR-94-07; P-9 l
IR-94-23; P-6 & 10
>~aydt o 5 f L k
i NRC CONTACT D.
Forbes
~
F. Wright i
i ASSESSMENT aicensee demonstrated axcellent use of remote j
a
)
.~.
1 6 I
monitoring equipment (video monitors, portable communication, and teledosimetry equipment) 'in j
many applications permitting continuous coverage i
from low dose vantage points.
J EXAMPLE d.
Implementation of new access control and dose tracking system in August 1994.
DATE 11/14/94 - 11/18/94 5
P.EFERENCE N-I IR-94-23; P-3 f6ddPT NRC CONTACT F.
Wright ASSESSMENT f
Licensee implemented new access control and
}
electronic alarming dosimeter system to improve personnel radiological monitoring capabilities.
)
EXAMPLE e.
Implemented Revised 10 CFR Part 20 Requirements.
1 DATE 1
05/30/95 06/02/95 REFERENCE IR-95-11; All P NRC CONTACT B.
Parker l
ASSESSMENT Licensee effectively implemented the revised l
l radiation protection standards following the l
January 1, 1994 implementation date.
i i
s 1
3 EXAMPLE f.
Licensee utilized air conditioning inside i
Containment Building resulting in increased worker efficiency, fewer PCEs and increased 4
overall safety reducing heat stress conditions DATE 11/14/94 - 11/18/94 05/30/95 - 06/02/95 REF.ERENCE
(
IR-94-23; P-9 Ssp 3,qd s
4 IR-95-11; P-9 b
NRC CONTACT B.
Parker ASSESSMENI' Reflects good radiation protection support a
4
6 a
IV PLATE SUPPORT ISSUE 3.
RADIOLOGICAL CONTROLS - RADIOLOGICAL WORK CON 3OL EXAMPLE x
Inspector reports good RP coverage on reviewed maintenance activities. Par.- 6 DATE 02/27/94 - 03/26/95 REFERENCE IR 94 09 Par. 6 & 10 NRC CO!CACT S. Elrod ASSESSMEIC 94-9 Health Physics coverage of outage-related maintenance was strong, as was health physics personnel response to a spill of potentially contaminated water.
(paragraphs 3 and 6) e
1'
.\\
l i
l
-1 i
i l
IV PLANT SUPPORT
{
i ISSUE l
l 3.
RADIOLOGICAL CONTROLS - RADIOLOGICAL WORK CONTROL EXAMPLE x
Inspector reports good RP response to spill. Par.- 3 DATE 02/27/94 - 03/26/95 REFERENCE IR 94-09 Par. 3 NRC CONTACT S. Elrod ASSESSMEITT A HP supervisor and a cleanup person responded promptly and limited the spread of the water. There were no personnel contaminations and the area was cleaned up and decontaminated within about an hour, i
2
k IV PLANT SUPPORT s
ISSUE 3.
RADIOLOGICAL CONTROLS - RADIOLOGICAL WORK CONTROL
]
EXAMPLE Inspector reports good RP oversight of outage activities x
DATE 11/06/94 - 12/03/94
]
REFERENCE 1
IR 94-24 Par. 6.c NRC CONTACT D.
Prevatte ASSESSMENT Especially noteworthy in this area has been the HP support of the outage and outstanding oversite of work activities to reduce personnel exposure to ALARA.
l 1
1 3
i o
i' IV PLANT SUPPORT ISSUE
.i 4.
Radiological Controls - ALARA EXAMPLE a.
Good Management Support of ALARA Program i QlInstallation of Permanent Reactor Cavity Seal b (thir Conditioning,of Containment Building During
{ Outage
/
DATE 11/14/94 - 11/18/94 REFERENCE fIl IR-94-23, M, 9 & 10 NRC CCNTACT ';'
o(
', tl r,
- /
F. Wright ASSESSMENT Licensee management has been supportive of ALARA program as demonstrated with the purchase and use of remote monitoring equipment, installation of pennanent reactor cavity seal on Unit 1, eid air conditioning of containment building during refueling outage.
o b
r IV PLANT SUPPORT ISSUE P
5.
Radiological Controls - Contamination and Material Control EXAMPLE a.
Control of Radioactive Material DATE 11/14/94 - 11/18/94 REFERENCE Pe gb IR-94-23: P-8 NRC CONTACT ASSESSMENT Licensee maintained adequate control of radioactive material.
W l
I l
j O
lveg l
l I
I i
...______..______m.
1 l '
t l*
IV PLANT SUPPORT 1
ISSUE 1
6.
Radiological Controls - Audits and Corrective Actions EXAMPLE a.
Radiation Protection Audits l
DATE 02/28/94 - 03/04/94 n
REFERENCE
)
IR-94-07; P-3 2
l NRC CONTACT B.
Parker ASSESSMENT Audits were sufficient in scope and d'etailed.
Corrective actions were appropriate and timely.
EXAMPLE l
b.
Re-Engineered QA Audit Program DATE 11/14/94 - 11/18/94 l
REFERENCE i
IR 94-23; P-2 &3 F
3 l
NRC CONTACT F. Wright ASSESSMEffr The licensee revised the QA Audit Program to maintain functional area audits and increase the number of performance reviews.
The licensee's objectives for the revised program were good.
i 1
l l
9
?
i l
I y
a l
IV PLANT SUPPORT ISSUE 7.
Ra'diological Controls - Staffing, Training, and Qualifications EXAMPLE a.
Revised 10 CFR Part 20 training.
DATE 05/30/95 - 06/02/95 IR-95-11; P-2 p
NRC CONTACT B. Parker ASSESSMENT Licensee successfully incorporated and provided revised 10 CFR Part 20 requirements into GET program.
EXAMPLE b.
Radiation protection technician training DATE 02/28/94 - 03/04/94 ghv b REFERENCE fpvFqf*1
\\
IR-94-07; P-3 i
NRC CONTACT D. Forbes ASSESSMENT The training and level of knowledge required for RP technicians was appropriate.
i EXAMPLE c.
Back-shift RP management and supervision
{
DATE 11/14/94 11/18/94 p
i REFERENCE
\\
IR-94-23; P-4 9
NRC CONTACT F. Wright ASSESSMENT Licensee maintained appropriate supervision and management oversight of back-shift RP outage activities.
PLANT SUPPORT ST. LUCIE SALP INPUT FEEDER FORMS ISSUE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT IV.
PLANT SUPPORT a.
All Personnel radiation exposures have 2/28/94-3/4/94 IR-94-07 (Per. El F. Wright The licensee continued to been less than regulatory hmite.
11/14/94-11/18194 IR-94-23 (Par. 51 meintain en effective external 1.
Radiological'Controle.
exposure control program.
External Exposure Control b.
1994 collective does was above everage 5/30/95-6/2/95 IR 95-11 (Par. 61 B. Parker The 1994 collective does wee at 252.5 person-rem / unit with two RFOs typical of an effective ALARA in 1994, program.
c.
Improved accuracy of heensee dosimeter 11/14/94-11/18/94 IR 94-23 (Per.5)
F. Wright The licensee improved the quality controle end occuracy of electronic elarming dosimeters utilized in the external dosimetry monitoring program.
IV.
PLANT SUPPORT e.
Internal exposures have been minimal 5/30/95-6/2/95 IR 95-11 (Per. 6)
B. Parker Ucensee continued implemented and well below regulatory hrrwte.
en effective intomal exposure 2.
Radeological Controis-control program.
Internal Exposure Control b.
Ucensee contmued to assess and 5/30/95-6/2/95 IR 95-11 (Per. 61 B. Parker Mainteine good radiation seeigne minor internal exposures.
protection policy concoming infomal dose seeignmente.
IV.
PL ANT SUPPORT e.
Radiological Postings 2/28/94-3/4/94 IR 94 07 (Per. 6)
D. Forbee Radiological Poetinge have been conservative and appropriate.
3.
Radiological Controle-Radiological Work b.
Radiation Work Permite 2/28/94-3/4/94 IR 94 07 (Par. 81 D. Forbee RWPe effectively addressed Control 11/14/94-11/18/94 IR 94-23 (Per. 51 F. Wright radiological protection concerne and provide for proper radiological controfe c.
Licensee use of remote morutonng 2/28/94-3/4/94 IR 94 07 (Per. Si D. Forbes Licensee demonstrated excellent equipment 11/14/94-11/18/94 IR 94 23 F. Wright use to remote monitoring f
(Par. 5 & Si equipment (video monitore, portable communication. and teledosimetry equipment! in many applicatione permitting continuous coverage from low dose ventage pointe.
^
qw G
l
v.
ISSUE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT Cont'd:
d.
Implementation of new access control 11/14/94-11/18/94 IR 94-23 (Per. 3)
F. Wright Liceneee implemented new IV.
PLANT StJPPGRT and does tracking system in August accese control and electronic 1994.
el%ng dosimeter eyetem to 3.
Romological ontrole-improve personnel redlological Radiological )Vork monitoring capabilities.
Control e.
Implemented Revised 10 CFR Part 20 5/30/95-6/2/95 IR 95-11 (Por. ALL)
B. Parker Liceneee effectively implemented Requiremente, the revised radiation protection etenderde following the January 1,1994, implemented date.
f.
Licensee utilized air conditiorung inside 11/14/94-11/18/94 IR 94-23 (Per. 51 B. PeAer Reflecte good radiation protectmn Containment Building resulting in 5/30/95-6/2/95 IR 95-11 (Pet. 6) support.
increased worked efficiency, fewer PCEe and increased overall eafety reducing heat strees conditione g.'
inspector reporte good RP coverage on 2/27/94-3/26/95 IR 94 09 S. Elrod Health Physico coverage of reviewed maintenance activities.
(Per. 6 & 10) outage-related maintenance wee otrong, so woe health physico personnel response to e spill of potenriefly contaminated water.
h.
Inspector reporte good RP response to 2/27/94-3/26/95 tR 94-09 (Per. 3)
S. Elrod A HP superviscr and a cieenup spill.
person responded promptly and limited the spread of the water.
There were no personnel contaminatione and the eroe wee cleaned up and deconteniineted within about en hour.
I i.
Inspector reports good RP oversight of 11/6/94-12/3/94 IR 94-24 (Pet. 6.cl D. Prevette Especially noteworthy in the area outage activities, hee been the HP support of the outage and outetending oversite of work actrvities to reduce personnel exposure to ALARA.
E---
ISSUE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT IV.
PLANT SUPPORT Good Management Support of ALARA Program 11/14/94-11/18/94 IR 94-23 F. Wright Ucensee management hee been (Par. 9 & 101 supportive of ALARA program os 4.
Ra<bolopcal Controle-til Installation of Permanent demonstrated with the purchese ALARA Reactor Cavity Seat and use of remote monitoring equipment, installation of 12)
Air Conditioning of conditioning of containment Containment Building Dunng building dering refueling outage.
Outage IV.
PLANT SUPPORT e.
Control of Radioactive Material 11/14/95-11/18/95 IR 94,-23 (Par. 7)
F. VWight Ucensee maintained adequate control of radioactive meterial.
5.
Radiological Controle-b.
Control of Contamination et Source IR 94-07 (Pet. 6)
Contartunation and Material Control IV.
PLANT SUPPORT a.
Radiation Protection Audite 2/28/94-3/4/94 IR 94-07 (Par. 3)
- 8. Parker Audits were sufficient in scope end detailed. Corrective actione 6.
Radiological Controle-were appropriate end timely.
Audite end Corrective Actione b.
Re Engineered QA Audit Progrcm 11/14/94-11/18/94 1R 94-23 (Par. 21-F. Wright The licensee revised the QA Audit Program to meintain functional eres audite and incrosse the number of performance reviews. The licensee *e objectives for t%
revised program were good.
IV.
PLANT SUPPORT e.
Revised 10 CFR Part 20 training.
5/30/95-6/2/95 IR 95-11 (Par. 21 B. Parker Ucensee successfully incorporated and provided revised 7.
Radiological Controle-10 CFR Part 20 requiremente into Statfing. Training.
GET program.
and Quahfications b.
Redestion protection techrweian trairung 2/28/94-3/4/94 IR 94-07 (Per. 4)
D. Forbee The training and level of knowledge required for RP technicians wee appropriate, c.
Back stuf t RP management and 11/14/94-11/18/94 1R 94-23 (Per. 41 F. Wright Ucensee maintained appropriate supervision supervleion and management oversight of back shift RP outage activities.
.n
.a
o ISSUE ST. LUCIE SALP INPUT (REC)
DATE REFERENCE NRC ASSESSMENT CONTACT Pt. ANT SUPPORT RAD CONTROLS a.
The volume of disposed radwaste April 3-7,1995 IR 95 06 (Par. 5)
R. P. Carrion The licensee continued to had declined from that of previous effectively implement its 1.
Solid Radwaste years.
solid radwaste program.
Management IR 95-06 (Par.11.b.)
It was taking proactive b.
The licensee was evaluating the use Apr. 3-7,1995 IR 95-19 (Par. 8) steps to reduce its of new technologies (Dissolvable disposal volume through Materials and locandescence) to Oct.16-20.1995 the use of innovative further reduce disposal volume.
technologies.
c.
Observation of material removal from July 17-19,1995 IR 95-13 (Par. 3) the RCA determined that the work IR 95-19 (Par. 7.f) was done in accordance with Oct.16-20,1995 procedures.
2.
Transportation a.
Review of the licensee's over-all Oct.16-20,1995 IR 95-19, (Par. 7)
R. P. Carrion The licensee continued to program for the shipping of effectively implement its radioactive materials was determined radioactive materials to satisfy requirements for quality shipping program.
assurance, registration of use letter for certain packages, training for This area is viewed as a harmat workers, etc.
licensee strength, b.
Fleview of shipping documentation July 18-22,1994 IR 94-16 (Par.11.al packages found them to be complete and well-maintained.
Oct.16-20.1995 IR 95-19 (Par. 7.d) c.
Observation of work in progress found it to proceed smoothly, in July 18-22,1994 accordance with procedures.
Oct.16-20.1995 3.
Radiological Effluent Dose estimates for 1993 and 1994 July 18-22,1994 IR 94-16 (Par. 4)
R. P. Carrion The licensee maintained Control were small fractions of the effective control over its 10 CFR 50, Appendix I limits Apr. 3-7,1995 IR 95 06 (Par. 5) radiological effluents, resulting in very low calculated doses to the public.
ISSUE ST. LUCIE SALP INPUT (REC)
DATE REFERENCE NRC ASSESSMENT CONTACT 4.
Environmental a.
The licensee's 1993 and 1994 July 18-22,1994 IR 9416 (Par. 61 R. P. Carrion The licensee's radiological Monitoring Annual Radiological Environmental environmental monitoring Operating Reports were thorough.
Oct.16-20,1995 IR 95-19 (Par. 41 program continued to be ef fectively implemented, b,
Observation of sample collection as evidenced by determined that the technician (from independent confirmation the State of Florida) was from the results of RESL knowledgeable and that the sampling Plant operation and stations were well-maintained, caused minimal operable, and calibrated.
environmental impact and virtually no dose to the c.
There was good independent public.
agreement with the results from the Radiological and Environmental Sciences Laboratory (RESL) 5.
Chemistry a.
.The TS required parameters (DO, Cl, July 18-22,1994 IR 94-16 (Par. 3)
R. Carrion The licensee continued to F, and DEI) were maintained well maintain an eflective over-within allowable limits.
Apr. 3-7,1995 IR 95 06 (Par. 4) all chemistry program to inhibit the degradation of b.
The licensee uses an early boration Oct.16-20,1995 IR 95-19 (Par. 3) both primary and regimen to reduce the source term secondary systems.
during refueling outages.
c.
The licensee has maintained the secondary chemistry parameters within their limits. The licensee has implemented EPRI PWR Secondary Water Chemistry Guidelines, with some exceptions.
6.
Training and A review of personnel training records, class Oct.16-20,1995 IR 95-19 (Par. 5.c R. P. Carrion The licensee's training Qualifications outlines, instructiona! strategies, references, and 7. g) program was effective in (Chemistry and examinations, ect., for the Post Accident maintaining high level's of Radwaste Shipping)
Sampling System (PASS) and Radwaste performance for the Shipping determined that they were adequate referenced areas and satisfying regulatory requirements.
ISSUE ST. LUCIE SALP INPUT (REC)
DATE REFERENCE NRC ASSESSMENT CONTACT 7.
Audits and Corrective Several Audits and Periodic Assessments Apr. 3-7,1995 IR 95-06 (Par. 3)
R. P. Carrion The licensee's audit Actions were reviewed and found to be well-planned process was effective in and documented. Various weaknesses were identifying programmatic identified and corrective actions of previously-weaknesses, making identified issues were reviewed.
recommendations to management for corrective action, and following up to prevent recurrence.
8.
Confirmatory The Region 11 Mobile Laboratory conducted a July 17-19,1995 IR 95-13 (Par. 2)
R. P. Carrion The licensee continued to Measurements confirmatory measurements inspection for effectively implement a gamma-emitting radioisotopes in various good Radiochemistry media. The results were within the Analysis Program, acceptance criteria.
9.
Other 8.
Meteorological a.
A review of the Meteorological Apr. 3-7,1995 IR 95 06 (Par.10)
R. P. Carrion The Meteorological Monitoring Program Tower and associated Program continued to be instrumentation determined that they effectively implemented to were well-maintained and calitwated.
satisfy its required functions.
b.
Post Accident b.
A review of the PASS operability log Oct.16-20,199 5 IR 95-19 (Par. 51 R. P. Carrion The licensee had Sampling System sheet determined that the system effectively maintair'ed the PASS in a high state of (PASS) had been maintained in a high readiness.
operability status.
c.
Control Room c.
A walkdown of the Control Room Oct.16-20,1995 IR 95-19, (Par. 6)
R. P. Carrion The licensee continued to Emergency Ventilation Emergency Ventilation System found effectively implement its that it was well-maintained and a prog am to maintain its review of system surveillances Control Room Emergency determined that TS compliance had Ventilation System in a been met and that the acceptance high state of readiness.
criteria was satisfied.
^
g' s
ISSUE ST. LUCIE SALP INPUT (REC)
DATE REFERENCE NRC ASSESSMENT CONTACT d.
Refueling Water Tank d.
The licensee had monitored July 18-22,1994 IR 94-16, (Par. 8)
R. P. Carrion The licensee continued to (RWT) t eak underground movement of the tritium effectively monitor the released due to the RWT leak.
Apr. 3-7,1995 IR 95-06, (Par. 8) tritium movement via a Tritium concentrations had generally monitoring well system.
decreased by more than a factor of Oct.16-20,1995 IR 95-19. (Par. 9) 10 from the values obtained immediately after the leak.
e.
Contaminated Studge e.
The issue of disposal of slight-July 18-22,1994 IR 94-16, (Par.10)
R. P. Carrion The licensee had been Disposal contaminated sludge was resolved proactive in resofving the during this SALP period. The Apr. 3-7,1995 IR 95 06. (Par.12) issue.
licensee opted to send it to the Indian County Sewage Treatment Oct.16-20,1995 IR 95-19, (Par.10)
Plant until a local municipal facility is opened. The licensee then plans to pipe the material directly to the local facility. The licensee expected this to take place by early 1997.
f.
U-2 Spent Fuel Pool f.
A leaking lon exchanger permitted an Apr. 3-7,1995 IR 9446, (Par. 7)
R. P. Carrion The licensee was very Ion Exchanger Leak estimated 25 cubic feet of bead resin proactive in doing a root to :.%1trate the U-2 Spent Fuel Pool Oct.16-20,1995 IR 9519, (Par.11) cause analysis. cleaning up (SFP), hWT, Emergency Core Cooling the escaped resin, and System (ECCS), etc. The licensee evaluating the impact of clear.ed the affected systems, any residual res'.n on RCS analyzed the cause of the original components.
failure, and evaluated the effect of any residual resin on the RCS components.
4 SALP INPUT FEEDIR FORM ST. LUCIE i
ISSUE EXAMPLES DATE REFEREN NRC ASSESSMENT CE CONTACT 1.
SEtt2ITY Security weapons qualification was observed in addition 3/27-31/95 95-08.2c Tobin The training program was consistently to " shoot don't shoot" course. Records of trained effective. Security personnel were Tratntng & Qualtitcation officers were reviewed and were accurate and detailed.
dedicated and mottwated.
2.
$1CURIlf there were no violations of regulatory requirements 2/7-11/94 94-02.2a Tillman Security, Training and Qualification-Secrrity Plans & Procedures Adherence identtfted during this assessment period, and Contingency C.as and implementing procedures were adequate.
3.
SECURIlf Review of implementation of a fully opera'trnal hand 9/26-30/94 94-21.2c Tobin The personnel ar. cess control /badgtng Accass Controls geometr y system that occurred mid Decembe'- 1 Y34. One 2/7-11/94 94-02.2c illiman program was constatently effective end non-cited violation in the area of postl'eg corpensatory
- reliable, measures within regulatory timef rame fez accus control to vital areas was noted.
l 4.
SECtIlli This area was not inspected during this SALP period.
N/A N/A N/A N/A Access Authortration 4
6 4
5 e
L D
t 1
s
-i
.-m.-
.m_.
- =
~~...
e o
f 1
SALP INPUT FEEDER FORM
= =..,
ISSLE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT SECOlif this area was not inspected luring this SALP period.
N/A N/A N/A N/A Fitnest for Dut y 6.
SEC0 lly this area was not inspected during this SALP period.
N/A N/A N/A N/A Safeguards Information Control 7.
SECOITT 1here has teen seven plan changes during the course of this N/A N/A N/A Changes were timely and Plan Changes assessmeat period.
appropriate.
t 8.
SECOIIT Internal Audit Program found three findings in the areas of 2/1-11/94 94-02.2a Tillman Internal audits were thorough.
Audito & Correct 6ve Actions security plan thangt drautngs, equipment testing, and light complete. nd ef fective.
- [
meter calibratton ano control. Qaality assurance provides 9/26-30/94 94-21.2b Tobin Corrective action to finding was timely and appropriate.
thorough and accurate audits,
$tx Internal Audtts r:onducted by Security Comptiance
[
Specialist; no discreanctes identified 9.
SECCIIV Portions of the perterter has recbndant detection aids.
3/27-31/95 95-03.2a & b Tobin Barriers, alar 1ss, lights, closed circult cameras, communications, Security systems twroved tilumination distributton noted.
Closed circutt television assessment found to be excellent; 9/26-30/94 94 -21. 2c lobin poner supply, alarm stations, and very good vital area alarms and barriers. Some system the testing, maintenance and i
failures in the beginning of the SALP period due to 2/7-11/94 94-02.2b.c.
Illiman repair support were good.
inclenent weather. Alars stations were more than adequately d,e, & f
,{
equipped; comunication equipment and tie secondary power supply system operated as required.
?
I-i b
I l
f f
I I
l'
. l I h
m.
SALP INPUT EEDER FORM PLANT SUPPORT (PS)
ST LUCIE CYCLE II I/2/94 - 1/6/96
[
12/I5/95 DRS Input ISSUE DATE REFERENCE NRC CONTACT AMES94EhT m erw nh l.
rerf..med rewme. this eu im. tion.f phet f.r:
li31194 IR 944116
- w. Miner rerformancein she areas reviend was proper coot:38 of cembestibles and flammables; 2126/94 IR 944516 satisfactory.
mainteemare, serveitance and eyershility of Ere 31/26/94 IR 944918 protecties systems and festeres; Ere briende training 4/23/94 IR 94-1116 med driu performaare; mad QA audits and eversight 5/28/94 IR 94-1316.a of the fire restecties Progreen.
7/2/94 IR 94-1416.a 7134/94 IR 94-1516.a 8/2734 IR 94-1815.a 9/30/94 IR 94-2016.a 1115/94 IR 94-2216.a 12/3/94 IR 94-2416.a 12/3e!94 IR 94-2516.a 2/4.95 IR 954116.a 3/4/95 IR 954416.a 4/1/95 IR 954716.a 4/29195 IR 954916.a
[
6193/95 IR 95-1017.a 7tl/95 IR 95-1215.a i
7/29/95 IR 95-I416.a It/16195 IR 95-1516.a 2.
(herved fire briande deist.
1/20.95 BR 94-2516.a W. Miner fire brigade's evereE peeformance was escu5ent.
The bngede rumpended to the sismulated fire im i
fd eursest gear sad he a tiedy mammer.
Coordinaties and wish she.. "_
eK-eite Rev i
^ were esceBeut.
m 3.
Evaluated events associate I with a Ere stop of the 4/1/95 IR 954716.a W. Miner fire involved a sceNelems board that bed been Unit I pressarirer ce Mortb 6.1995.
placed on ser of the presserner which compressed the,,
6 insalmane, and ignited
[
when the heard camme inte essenet with the het r
unetal of the,.
- 6. Per====d wertung in the area rumeved to heard, passed k down se the Seer, and estW the Are using a portable l
See amengudsher. The heard had beam tressed t
with a Ere rutardmet fluish, as required by the i
Page 2 or s t
[
/
o SALP INPUT FEEDER FORM I
PLANT SUPPORT (PS)
ST LUCIE CYCLE II 1/2/94 - 1/6/96 12/15/95 DRS Input ISSilE DATE REFERENCE NRC CONTACT ASSESSMENT 4.
Evaluatnf the site's fire protection and prevention site's fire..
precedures, and the actiem prernlures for adtwrenie to NRC rntniements med by the <. _
' W sa the area was guidelines.
apprepnate.
7/l/95 IR 95-12 W. Miller Several precedure discrepancies were identined.
15.a.l. 5.a.5 Fire bngade transme procedures Isched clarity en the use of resperators. Records of fire bngade physical es-m were met tracked resubmig in several Ere bngade saembers not reedving am
+
appreynate physical esameneteen Hre bngade regaulincaties tramanns was subjective and met wc5 documented Allbough the Ere bdgade was resyneseble for response to Erve outside the protective arve, Are drius were met being conducted in these areas.
i No centrol reens persomed other them Sessier Reacter Operators were quauned for use of sdf restammed breathms apparates.
The einergency tenan rester did met include the current bene address and pheme mussbers for several of the Rre brigade members. Also, several people were listed as Ase brigade aseinbers who were me s nger geslined to pertens are 3
brigade duties.
I t
Page 3 of 5
1 e e e
e r
r gih s
unf t ee dipof eb s s o
ei tgehai e
c p t
v n pl ord iins ii r a pnpt
, s c v ei rd e s
e poe v e e hd phladh t ed s
t e u v e t e n sl mhto T
pd a ef t
N ef d eih d u
c e, g e @ b t E
x o e e
cc h M
e e
n d ot sc S
_if on a t
S do pr ut t
E r ep ya a s S
a t e ess
,h msl S
.l r u g er edAf a i
A r
t t h sd aee s
e s e yh m.
s s m e t
au l d sfds i
wr s nie oie d aat d
ed c s ic r ah e e eif s t i s e u
ca dt um ot em e
r pd e c m s, apr ed i
e r
ci c
sd es e e od g y r e rh ri e
Pdl hEd pt T
C ATN O
C C
M RN R
)
OS 1
FP 1
t u
R(
E p
6 n
E E T L 9 I
D R C/
C EO Y/
S N
5 6
~
R E
f P
C1 o
2 E P D
R 1
2 E
5 4
F U
E 4 5
F 9 a.
TS 9
9 E
I 5
e
/
R R
g U
C/
I 1 PR U/2 5
a P
1 Nf LI
/
A 2
I P L T
1 P
S L
E A
T S
AD tneme n r gE iladn ne u ev o l
s a r t
g y v r
s e e rhd e t n
ta g u wine h
v ml t
e or i v e t
E r n g
U sei nm e eie S
r h t r
S pus s
d uy I
eel s r c r
f G ed e r
nt epa a n
e w
o n
t os d mie e at wN ait c s e iei e f
i vi t
ve r r o u e r R s v p
g SALP INPUT FT.EDER FORM PLANT SUPPORT (PS)
ST LUCIE CYCLE II I/2/94 - 1/6/96 12/I5/95 DRS Input ISSUE DATE REFERENCE NRC CONTACT ASSESSMENT Reviewed several compi. int surveillance test IR 95-12 Serveimance data was apprepnate imeluded inte prareilures em fire entinguishen, interior fire base 15.a.3.a&c the completed test data perhages. Newever, stations, and startup transformer dduce fire several minor decrepancies west meted. A CO, suppreusen systan.
entingussber was 3==s=m.d in a locatism were the F5AR stated a dry chemsical entingussber was insta5ed and the monthly fire m---
survesuanceinspectmen precedure did met reignore verificaties that the en-4 " e had received the requered ammuel mainteneere insputism.
Witans surmilance amt af Ifait I startup IR 9512 Surveillance test was conducted is a professsemal transferiner.
15.a.3.c manner; bewever, a museber of discrepancies were identsfied which indicated that test perseemet had met provided attantsee le detail during previens tems. These discrepameses kluded: au systems valves met provided with identification tags, se procedure sign off for documeestatsee that systeam actuaties alarus was received by the control room ammmmeister, incorrect asumber of detsters listed by the prwredere, piping leaked wbns pressurized, and synskler head mensles L
clogged due to pipe cloughang when systeam activated.
Fire brigade drill was satisfartery, but larked Witnas a Fire Brigade lhill.
IR 95-12 reabsms and Arefighting ter@ were weak.
15.a.5 AM brigade members did met respeed with self coetained bre=shme apparatus, Are base was met properly faked out, g--
" withest turnout star were used to assist the primary respeedsag Ere brigade. The critique fsNewing the drE was met therwegh and did met add esime to the driR eneerise.
Page 5 of 5
SALP INPtTF FEEDER FORM PLANT SUPPORT (PS)
Sr LUCIE CYCLE 11 1/2/94 - 1/6/96 12/15/95 DRS Input ISSUE DATE REFERENCE NRC CONTACT ASSESSMDfT rnformed wathd..n img., tion to nity that the IR 95-12 Cambustibles and Are hazards were meted to be centr =1 et 11asemable and rembustihie smeterials mer e 15.a.6 preyerly essensed.
prepnty lenylvenevoteel.
AE visible electrical cable Ere reistive Pnformed emahd==n ime <tiens of the imtalled fire IR 95-12
'Plasmastic" ceaemes and esectrical raceway preentium systein, features and engssymment te verify 15.a.6
- Therme-big
- Are bemers wereIncart and in that these items =cre in service and property goed physicalconGaism. One dwaged Are maintained.
bemer penets aties was identined in which the sce.we had preneessy met comedered degraded.
AE Ere protectuse sysInn valves were faued to be property mW; however, ame Are preeeresse valve, the cross c===artsee between two tombs, was femmd to be property absmed but met Inched 8,RE 88 Sedeewttese w4hesse & INhee Respese tIrrentedtsas Emweg sry 3%n 1%ehl== A Feeds she Temed rhus EDswes For they Ateens Acehmebehen 9M eeparq tufwe f
[
l l
Page 6 of 5 l
a PLANT SUPPORT ST LUCIE SALP FEEDER FORM SALP PERIOD 11 I
ISSUE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT IV.
PLANT SUPPORT A senes (4) of augmentation (call out) drills were 3/16/95 95 03 Par. 4 J. Kreh held whsch demonstrated that the response 1.
Emergency Preparedne.s organsiation could be augmented an a timely
- Staffing. Trastung arwf manner.
Quahfication Observation of a traerung drill on the plant simulator 3/16/95 95 03 Par. 5 J. Kreh The trairung activities s
to test abshty to property classify the off-normal observed generally indecoted F
condition and make proper notifications. The that personnel were property classifications were timely and correctly done but trained and understood what the notifications were late en two independent triels response actions were due to interviewing response to simulated plant required I
i conditions. Licensee irutisted followup and corrective actions.
f IV.
' PL ANT SUPPORT Dunng the full participation exercise the licensee 3/4/94 94 04 Results.
F. Wright Overall the performance wee demonstrated the ability to edentify erutisting Par.5 good with the hcensee 2.
Emergency Preparedness conditions. detemune emergency action levels and meeting most objectives.
j
- Drill and Ewercise correctly classify the event.
j Performance The players f aeled to edentify the path of the release Par 10 F. Wright as contamment failure due to unclear procedures.
This led to a protective action response that was
[
unexpected by the sceneno developers.
. 6 I
IV.
PL ANT SUPPORT Tours of the emergency response f acilities and 3/16/95 95-03 Par. 3 J. Kreh ERF and emergency
[
eelecteve examenation of equipment.
equipment were adequately 3.
Emergency Preparedness instrumentation, and supplies indicated a maintained and -- property to Facchties end Equipment satisf actory state of operational readiness.
facilitate a proper response.
i Records review of f acihtylequipment surveillance Par.3 J. Kreh ind cated that these surveellence were performed at the required frequencies with required documentation.
Dtmng the f acehty tours, two examples of Par.3 J. Krch nonmventoried and out of date documents were l
identified by the inspector; e telephone book end volume of EPIP's. An Action Report was initiated to l
ensure corrective response.
IV.
PLANT SUPPORT Inspection venfied that current letters of agreement 3/16/95 95 03 Par. 2 J. Kreh The interfaces with state and I
were in effect as beted in the E Plan.
local authorities wee 4.
Emergency Properedness effective.
Interaction with Offsite The hcensee also conducted the required annual l
Agencies review of EAl's with state and local govemment authonties.
ST. LUCIE SALP FEEDER FORM (CONT'D) i m
m..
.m 1;
J ISSUE EXAMPLES DATE REFERENCE NRC ASSESSMENT CONTACT IV.
PL ANT SUPPORT Four independent audit reports were reviewed.
3/4/94 94-04 Par.12 F. Wright Audit reports were detened The audit check lists were detarled and thorough.
and thorough. The program 5.
Emergency Preparedness review was adequate.
Audits. Cntiques, and Two enternal reviews were inspected. The Corrective Actione reviewere adequately assessed program accomphahments and needed corrective actions.
s The STAH system is used to develop corrective actions and track open items. The system was deterrruned to t>e an effective management tool for ensunng completion of correche action for 1
identified problems.
j Following the annual full participation exercise the The licensee's entique licensee's crit que addressed both substantial following the annual exercise deficiencies and improvement areas.
woe acceptable.
4 P
t t
L Page Eo.
23 11/15/95 51 tuCIE SAtP INPUI FEEDER 5 SitP Calf RPI E ONil 155HE ENAMPtES A55t55 MENT INSPEtim AREA No.
t 0R
- SitP AREA F5 PS 03/04/94 94-004 0 EMERGtNCY PREF AREDNE55 b
ANNUAt ENLkCl5E N011FICAll0N MEIN 005 t V NOlliICAllONS/ONE f ALLURE 10 DOCUMENT N0ilflCA110le IDENTIllED WitIGNT PS 03/04/94 94-004 0 EME RGENCT PREPAREDNE 55 h ANNUAL ENERCISE E Mt RGE NCY CIIVE EVAtUAldON Of CON 0lll0NS/ DECLARATIONS IIMElf Will CLA5515ICAll0N SYSTEM WRIstri F5 01/04/94 94 004 1 Ept RGENLV 8 Bil' arf DN155 h ANNUAL E N! RLl5E OG Jitt lVE 5/5CENAt t05 v5(t N AR IO/LONIR0t l E RS ADEQUAIE PS 03/04/94 94-004 0 EMERMNCY PRil'AREDNESS b 1994 fUlt PARitCIPallON ENERCISE AdX10 PE RIORMANCE '
Fe 54 TM WillGNT I
ANNHAt E N E RC15E EMERGENCY T ACIllllE5 ft A10R, ISC, OSC, E05 EMERG NEWS CENIER MAssesED PROPERLY, GOG)
WRIGHT PS 03/04/94 94 004 0 E MERGE NCV PRE P AR(DNES$ )
ANO EQuiPMENI COMMLNtiCAIIONS ESPON5tBlllllES ADEQUAIELT DESCRIBED /ADE00AIE PERSONNEL AVAll ARit WillGNI EMtRt,tNCi 6 Els AptDNt55 3P d ANNUAL E n t R(15E PS 03/04/94 95 0u4 o
/
RESPON5181tlif/SIAIllNG PS 03/04/94 96 004 0 t Mt R M No t IRtPARtDNL55 fb ANNUAL E NE RCI5E PROIECIIVE RESPONSES ONI AINME NI I AllOR R NOI CL E ARL Y DEflNED, LICEN5tt I AltED 10 ID WRIGHT SOUREE Of RELE ASE ANNuAt tNtRtl5E Att lDE NI A55E55 MEN 1 ff ElfttilVE IN EVALUAllNG BAD CONDlllONS unlGNI P5 03/04/94 96 006 0 t ME RGtNtv PRts ARtDNt55 1
PS 03/04/94 94 004 0 tMtRGtNCY PREPAREDNESS 7
ANNUAL ENERCl5E E ME RGE NCY Mt0HACV, OPERA 8lt ilV, AND Ef f ECilVE CCRe9UNICA110N5 EQUIPMENT Wit lGNT COMMUNICAllONS DEMONSTRAIED LRillott TDEQUAll WRIGNI PS 03/14/94 94-004 0 EMERGENCY PRtP AREDNE SS l L ANNHAt EttRLl5E WRIGui PS 03/14/94 94-004 0 EMERGENCV PREPAREDNESS ANNUAt ENERCl5E RADI A110N ENPOSURE StACIORT CONIROL PS 06/2//94 V4-013 0 EMERGENCI PRtF AREDNE55 3 ALLIDENI PREPARAll0NS INADEQUAlt - CR ENSEE's OPEN 81EM SYSIEM FAltED 10 IRACK 155UE 10 Closure (DEV) EllKS WATER SUPPLIES AN0 SANITAll0N KIls MO[ [fg KREll SONNET PROPEttT 1 RAINED 4 PS 02/1//95 M 003 o (MERGINLV PRtiAREDNESS IRAINING ERAtlY SAll5FACIORV, MINOR IU CfES-IN SUPPt y M BAGR KREll PS 02/1T/95 95 003 0 EMERGENCY PREPAREDNESS
} EMERGENCY I AtitillES, EQUIPMENT, INSTRUMENIATION, AND SUPPilES KREll hREVIEus/ Atoll 5 ILED AND INOROUGN PS 02/1//95 M 003 0 EMtRGtNCY PRtPAREDNE55 PS 02/1T/95 95-003 0 EMERGENCY PREPAREDNESS EffEClivfME55 Of LICENSEE CONIROLS R 5151EM Ef f ECilVE FOR ENSURING CORRECTIVE Acil0Its KREll KREll PS 02/1T/95 95 003 0 EMERGENCY PREPAREONE55 ORGANIZAll0N MANAGEMENT CONTROL Y WEtt MANAGED AND IMPLEMENTED KREll PS 02/IT/95 95 003 0 EMERGENCY PREPAREDNESS h EPIPs PROPRIATE AND ACCEPTA8tE PREVAT PS 06/03/95 95 010 0 EMERGENCY PREPAREDNESS ANNUAL EXERCISE LAIRONG PERf 0RMANCE sp
,J. t >., mwa h
4gg I a c.we s p rf:.,,,w,a. ;n pjaa
%yp,f 4 yag y,
--