|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20148A7131997-03-28028 March 1997 Forwards Addl Responses Needed to Grant Exemptions.Items 2,5,6 & 7 Seem Appropriate for St Lucie to Respond to ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 1999-03-03
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20207L5671999-03-12012 March 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 981130,1204-14 & 18 ML20207E6091999-03-0303 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980622-26 ML20236Y6301998-08-0808 August 1998 Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld ML20237A0011998-08-0707 August 1998 Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl ML20248L8621998-06-0909 June 1998 Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld ML20203M6681998-02-23023 February 1998 Forwards SER Re TR CENPD-199-P,Rev 1-P-A,Suppl 2-P, CE Setpoint Methodology Proposing CRGR Review Be Waived IAW Suggested Procedures in 890929 Memo ML20202E0141997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-97-461, Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted1997-11-25025 November 1997 Forwards FOIA Request Received Direct in Region II from E Barton on 971125.Encl Partially Deleted IA-99-106, Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump1997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205D4281997-08-15015 August 1997 Discusses Concern Identified During Special Design Architect-Engineer Insp Re EQ of Unit 1 Terry Turbine Woodward Governor Controls for Steam Turbine Driven Auxiliary Feedwater Pump ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure IR 05000335/19970051997-07-17017 July 1997 Forwards Allegation Evaluation Rept & NRC Insp Repts 50-335/97-05 & 50-389/97-05 Re RII-97-A-0116 ML20202E0261997-04-23023 April 1997 Discusses Technical Staff Actions Associated W/Three Concerns in Allegation RII-96-A-0251 ML20137L2971997-03-31031 March 1997 Forwards Matrix Containing Answer to Listed Questions in ,Rev 1 ML20148A7131997-03-28028 March 1997 Forwards Addl Responses Needed to Grant Exemptions.Items 2,5,6 & 7 Seem Appropriate for St Lucie to Respond to ML20137R8831997-03-27027 March 1997 Provides Info Requested by 960208 Memo from J Stolz Re Review of Spent Fuel Pool Practices & Current Licensing Basis ML20137L0981997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 37 to St Lucie Physical Security Plan,Case Control Number N5S63VA50033593.W/o Encl ML20137L2311997-03-25025 March 1997 Forwards Summary of Changes Made to Safeguards Review Rept, Rev 47 to St Lucie Physical Security Plan,Case Control Number N5S76VA50033596.W/o Encl ML20136E9261997-03-0606 March 1997 Forwards SALP Input Feeder Info at St Lucie Facility from 940102-960106 & Requests That Technical Staff Complete Review by 951222 ML20136A9241997-02-28028 February 1997 Partially Withheld Memo Discussing drop-in Visit of J Broadhead,Chairman & CEO FPL Group & Chairman & CEO FP&L Co & J Goldberg ML20137L2751996-12-16016 December 1996 Requests Guidance in Addressing Issues Re Use of Temporary Fire Pump W/O Evaluation & Construction of Enclosure for Control Rod Drive Electronic Equipment within Cable Spreading Room,W/O Appropriate Evaluation ML20136A6751996-12-0909 December 1996 Partially Withheld Memo Discussing Directors Decision 96-19 Under 10CFR2.206 Re Steam Generator Issued at St Lucie ML20137R5381996-11-22022 November 1996 Informs That Rept IR 94-008 for St Lucie Opens Item 94-008-02-URI Quality Level of PORV & SRV Discharge Piping ML20136E6991996-11-19019 November 1996 Requests Info Re Sheron St Lucie Visit.Info Requested by 961120 ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20136E6791996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instrumentation Insp ML20136E6881996-11-18018 November 1996 Forwards Background Info on St Lucie Nuclear Instumentation Insp ML20136E6081996-11-15015 November 1996 Provides List of Corrective Actions That Have Been Rolled Into Speakout Program ML20136E5461996-11-14014 November 1996 Forwards File Submitted to Kerry on 961024 Re PIM-like Summary of Events from 92-93 ML20136E4911996-11-13013 November 1996 Forwards Updated Schedule for St Lucie FY1 ML20138G4131996-11-12012 November 1996 Requests Technical assistance,TIA-019,re Discrepancies Between Containment Radiation Monitoring Sys Described in Usfar & Regulatory Guide 1.45 at Plants ML20140E5361996-11-12012 November 1996 Forwards Plant EA Worksheet ML20140E6591996-11-12012 November 1996 Provides Revs of Plant Violations for Current Hour ML20140E5301996-11-0808 November 1996 Forwards Input Received from Dan & Revised EA Worksheet from Incorporating Input.Few Slight Revs Were Made to Notice of Violation ML20140E6521996-11-0707 November 1996 Informs That D Barss Will Be e-mailing Input on Items 5 & 6 for Incorporation Into EA Worksheet ML20140E6201996-11-0707 November 1996 Provides Two Violations That Are Subjects of EA Worksheet ML20140E5941996-11-0606 November 1996 Informs That Plant Violations 1 & 2 Re Emergency Prepardness Program Insp,Being Looked at for Escalated Enforcement.Feedback Requested ML20137R9031996-11-0606 November 1996 Requests That Info Re St Lucie Be Mailed to Author.Info May Be Found in Plan of Day Handout,Provided by Residents ML20137Y5401996-11-0505 November 1996 Forwards Info on Two Issues to Be Discussed W/Panel at Meeting Scheduled for 961106.Partially Deleted ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20136E3961996-10-31031 October 1996 Informs That Violation Withdrawn Re Licensee Use of Ccw/Icw (Svc Water) in Mode 5 at Plant ML20136E4691996-10-31031 October 1996 Discusses Criticality Monitoring Ltr & Requests Response to Listed Question ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20140E5191996-10-29029 October 1996 Discusses Addl Info for Plant Panel,Just Received from Inspector ML20140E5801996-10-29029 October 1996 Discusses EA Worksheet on Plant Re Wiring Error Affecting Nuclear Instrumentation ML20140E5241996-10-29029 October 1996 Forwards Wordperfect Version as Requested ML20140E5901996-10-29029 October 1996 Forwards Enforcement Action Worksheet ML20136E5641996-10-28028 October 1996 Replies to News Summary Re Escalated Enforcement for Plant on 961025 IR 05000335/19950151996-10-28028 October 1996 Forwards Draft Insp Repts 50-335/95-15 & 50-389/95-15 on 960907-1012 1999-03-03
[Table view] |
Text
I
/
\\,
h/
/ >n meeg%
t UNfTED STATES NUCLEAR REGULATORY COMMISSION
)
P
,y 4
REoioN H f
101 MARIETTA STREET. N.W.. SUITE 2900 l
T.
j ATLANTA. GEORGIA 2032H10B t
b.....*
December 8, 1995 MEMORANDUM T0:
Ellis W. Merschoff, Director Division of Reactor Projects Johns P. Jaudon, Deputy Director Division of Reactor Safety David B. Matthews, Director Project Directorate 11-2 Division of Reactor Projects 1/11 Office Of Nuclear Reactor Regulatio FROM:
Kerry D. Landis, Chief Reactor Projects Branch 3
[
Division of Reactor Project's
(
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) INPUT REQUEST 1
- is the Input Feeder Information on the licensee's performance at the St. Lucie facility during[o provide confirmation that all pertinent information SALP period 24, from January 2, 1994, to January 6, 1996.
You are requested on the licensee's performance has been accurately captured in Enclosure 1.
Please provide any corrections to Enclosure 1 using the input Feeder QA Form i
which is Enclosure 2.
The blank feeder forms are also available on the computer LAN "I" drive as 1:\\BLKFDRFM.LSR (for laser printers) and I:\\BLKFDRFM. DOT (for dot matrix printers).
One input feeder form per SALP functional area is provided.
Each division is requested to have their technical staff complete their review /QA of the Input Feeder Form for each SALP functional area. The forms should be completed by your respective division and all inputs forwarded to me by December 22, 1995.
General guidance for completing the forms is given on the bottom of each blank form.
For each example that you list on the input feeder forms, include the reference inspection report number and paragraph number.
Also, please provide copies of pertinent pages of the inspection reports that you reference on the feeder forms.
Please mark the inspection report number and paragraph number clearly on the upper right corner of each inspection report page.
This will allow easy reference to the source report during review of the feeder form and development of the outline.
The completed input feeder forms should be j
transmitted electronically (via e-mail to KDL and EXL2).
Hard copies of the IR pages should be '.ransmitted by internal mail or FAX.
The enclosed supplemental information oackage will be generated and distributed only once.
Updated supplemental ana new information that would effect the assessment of a licensee SALP period performance will be forwarded to the Board members for inclusion to their briefing books prior to the Board meeting date.
L 9704070347 970325 PDR FOIA
-- g\\ -
BINDER 96-485 PDR C
l t "
R
\\
c b
2 4'
The SALP Board meeting for St. Lucie is scheduled for January 24, 1995. The assessment period and phase that should be assessed are described below:
Site Name Salo Period Beoinnino Date - End Date St. Lucie SALP Cycle 24 January 2, 1994 - January 6, 1996 The assigned responsibility by functional areas for the subject SALP assessment is as follows:
Plant Operations - Ellis W. Herschoff Engineering
- David B. Matthews Johns P. Jaudon Maintenance Plant Support
- Johns P. Jaudon i
For purposes of manpower recording, the following inspection report number j
should be used when recording time spent on SALP assessment preparations:
Report Number: 50-335/9,5-99; 50-389/95-99 Inputs are due by December 22, which is approximately 15 days prior to the end of the SALP period.
This will mean that the computer printouts and other SALP information which DRP will provide your staff may not contain data on i
inspection reports that have not been issued by the end of the SALP period.
Your staff should ensure that their inputs cover all inspection reports inclusive to the SALP period completed.
Listed below are reports which are planned for this SALP period, but have not been issued to date:
Report Number lead Insoector Insoection Dates Insoection Area 95-21 R. Prevatte 10/29 - 12/2/95 All Areas inputs should be written in accordance with the ROI 0516 "SALP."
Also enclosed is a copy of the Master Inspection Plan (MIP) detailing which inspection modules are in each functional area.
Your staff will be provided with a copy of this memorandum, as well as listings of the inspections i
performed, license event reports (LERS), and violations identified for the
)
. appraised period.
The report numbers associated with the particular I
noncompliance should be verified to ensure that all of the violations are included for discussions at the Board meeting.
If violations, LERs or inspection activities belong in a functional area different from that indicated on the enclosures, the DRP Branch Chief or Project Engineer snould be notified to ensure appropriate coordination.
Your staff will also be provided with a copy of the previous SALP report and previous SALP strengths and challenges.
Challenges identified in the previous SALP report should be reflected in the input feeder forms, to be used as supporting information for the outline wnich will be presented at the Board meeting.
The. challenges will be oiscussed during the Board meeting to determine if any improvements have been acnieved during the SALP period.
In the course of your input ano assessment, it is essential that you provide sufficient information for the SALP Board to obtain an accurate perspective of the inspection activity in the area.
The SALP Board does not wish to render a i
rating in an area in which the licensee did not conduct activities or in which j
1 a
i
1 o
3 9'
the region performed insufficient inspection activity to evaluate the area.
I would like to emphasize the importance of providing complete, accurate, and timely inputs to the SALP process.
Our desire is to proauce a professional report which will be beneficial, now and in the future, to both the NRC and the licensee.
If there are any questions concerning the SALP process or preparation of your input, I would be glad to discuss them with you.
i 1
Enclosures:
1.
Input Feeder Information 2.
Input Feeder 0A Form 3.
Master Inspection Plan 4.
Listing of Inspection Hours i
by Functional Area i
5.
Previous SALP Report, SALP l
i Strengths and Challenges 4
6.
Listing of Inspections 7.
Listing of Violations,
)
Enforcement Actions, and CALs
)
8.
Listing of LERS and LER Root Cause Analysis
)
i 9.
Major Inspections, NRC Review s
Activities, Licensee Conferences, i
and Licensee Activities t
- 10. Reactor Trips, TS-Required Shutdowns cc w/encls:
DRS BC EB
[
DRS BC OLB DRS BC MB 4
DRS BC PSB DRS BC SIB
}
E. Lea, DRP
)
R. Prevatte, St. Lucie J. Norris, NRR I
1 3
N We +6 MahSM n
/
s
/
c 3
_5
_3 5 3 5
5 -
8 E
5 5 5
5_
5 5
3'5 r
a =
= = =. 3
- 5 5 5 0 0 0 t u g n 5
5 5
5 W
w w
w w
w E
I, Q
E L
f w
a E.
Q R
Q w
C 5
l 5
~
=
c r
%2 E
s.
,w 2
e.
E D 5 w
. =
O 2
m w
A w
M W
h O
M
=
=Y O
2
=
M w
v
~
C C
J m
b
=
2 b
E b
b b
O V
2
{
2 w
V
=
w E
e
=
=
/
w w
M W
=
2 w
=
2 j
5'
{
{
M m
w A
w
[
=
W z
Q w
C w
W
=
w W
N 2
O W
6 0
c L
w E
e Q
O e
w w
w w
w e
D 3
m W
=
M F
w
=
c W
=
O
~
.W 2
2 Q
=
O a
e w
C w
w z o W
=
C M
.=
,Q g
iw U
w m
w m
=.
=
=.
=
w p
a w
Q w
o -
D p
E g
F w
2 w
w W eg =
E a
g w
W 5 m C
w w
w O
D 2
C w
s w
(u%
w E
=
c w
w 8
M z
Eg.
Q O
.O
_E m
C w
z M
F 0
te M
2 2
C
.M '
w w
C.
E w
n g
E
=
W Q
g D
2 D
w
=
O C-w M
-M
= -
w
=
=
=
w M
.-w
=
W 3
W
C
=
W
=
m W
Q W
w
=
w w
2 w
M z
=
m O
w w
W w
W 2
WM 2
.o W
w
-2 E
M O
=
ww M2
=
w L
p w
n g
=
w 2
a C
=E
=
w 6
.O I
w C
w 2
I 4Q C
w
=
Q W
==
2.
W Ow B
.E E
E w
Q 4
M M
w w
g O
p M
m w
w g
=
=
b
. {
= O
= >
=w W
w w
e Q
M w
=
w OW
=
m e
p
=
w w
w M
m up w
2 w
p w
.w
.* M O
2
=
w A
}
q w
W M
L g
w m
M E
O w
I m
E-M O
- 5 5 -
w M
w w s w 2
Q E
6 0
2 G
=
g.
w w
w 4
w Q
=
W R
w g
=
W
.O i
{.
=
w w
y MW M
Q
=-
w
=
g k
w l
Q M
M M
M M
g O
w 2
~
=
~
w v
2 w
6 4
=
3 w
4 E
=
G E
D M
e M w
3
=-
L M
=
E w
w a
M M
Q w=
=
0 W
M W
w w
b w.
k s
E m
M m
E O
W w
.O M.
M
=
M w
DE M
w DD w
w w
2 wm m
w W
M W
W 3
w 2
W O
QM me 2
2
=
Db w
W
=
w w
w W
w w
X>
O 3
w
.O m
W 2
Q d
w
.d
=
0 Ew m
=
-w Q
w O
2
=W w
- =
==
w M
=
a z
a
=
wE M
0 w
Q M.
w w
E w
M 2
wp O
W E
EM MO w
w b
w W
O WE
-W E
M L
w
=O
=<.
w s >
m n m C.
2 m
n.
M W
M w
w w
w a=
0 3
_M
_M 5
_M w
w%
w w
w w
I M
_M _>
_M e
MM M
M
.M
=O M
E W
W W_
W WE W_
W E - =
mm W-M M
W W
u W
.v w
M w
w wE w=
w w
W-w w
uu
= a w
-5 w
w.
W w
w o
2 m
MW m
M k M m a
a m.
M A
.k w
-b
>E w
w W-w-
w=
w w
wW o
W g
.- aB w
w M
=M
w
. 5 9 - ~
.. M w
3.
w
.w w
W w
E E.M s
Q w
4S so EM s s E E
E_
=
w 5 m
.m E W-2 2
.a 2 2
.E w
.a 2
rM >
b a
w w
l m
x W.
W
<W 5
a W
. 2 w-w w.
i lny O
\\
^
ou e-b d
E h M Ob ds g
ag g
4 h
M M
M M
M M
M M
M M
M M
M M
M M
M M
M.
M M
M M
M M
M M
M M
M M
M M
M M
M M
M w
w w
w w
w w
w w
w w
w w
w w
w w
w w
2 2
2 2
2 2
2 2
2 2
2 2
3 2
3 3
3 x
3 Q
Q Q
Q Q
Q Q
Q Q
Q Q
Q Q
Q Q
Q Q
Q Q
w w
w w
w w
w w
ew w
w w
w w
w w
w w
w E
b k
k 4
k b
b E
4 k
b h
b w
w w
w w
w w
w w
w w
w w
w w
w w
W w
u a
u u
a u
a a a a
a a
u u
6 6
a a W
W W
W W
W W
W W
W W
W W
W W
W M
M y
X 3
2 3
2 2
2 2
2 E
2 2
E E
2 2
m 5
3 3 3 0 3 0 0
3 3 3 3 3 3
3 3 3 3 3 3
r r i E E E
E E E rrr r w
w w
w w
w w
w w
w w
w w
w w w w
w 55' o o
- o e o
o O
o o e o
o o o o e o o 4
4 4
4 4
4 4
4 4
m m
m m m m
o 8 8 8, 8 5 8
8 8 8 8 8 O.
8 8 8 8 8 8 o.
L.
4 4
4 4
4 4
4 4
4 4
4 4
m D
WP D
D O
D P
O M
4 N
4 4
4 4
4 4
4 4
4 4
4 4
m
(
O O
O O
S D
D S
w D
D w%
.4 4
4 4
4 4
4 4
4 4
4 A
N N
A N
N N
m w
.D C
O O
O C
C O
O w
e N
O
=O I
OO
&m m
m m
m m
m m
m m
M c
N N
N N
N N
3%
D aO o
o O
O O
O O
O O
O O
O O
O o
D D
C m
p h.
M
- a. w.
9 M M
M M
M M
M M
M M
M M
4" M.
9 4 6
h E
b k
k k
k
.M M
M M
M M
M 6
k k
k 4
?
d
s, s
Page No.
24 11/15/95 51 tuCIE SALP INPUT FEEDERS
?
SAtP DATE RPI #
(Mili ISSUE E R AMPL E S ASSESSMENT INSPECTOR AREO NO.
PS Ifs /16/95 95-015 0 EMERGENCY PREPAREDNESS PLANI SHU1DOWN FOR HURRICANE ERIN PREFARAllON AND SI Af f LNG, rt ANNING, AND SHU100WN tiAS Eyff rREVA PS 02/18/94 94 001 0 flRE PROTECTION MONT Hl Y OBSE RVAll0NS SAll5fAC10R) g R
NJ 0
P3 03/17/94 94-005 0 flRE FRO 1ECl10N MONIHtv f65ERVA110NS SAllst ACif*v tR 6.h P3 04/28/94 94 009 2 flRE PROTECTION MONTHtt OBSERVAil0N5 Sail 5fAC10RY Ett y
PS 05/20/94 94 011 0 FIRE PROTECIl0N MON 1HIV OBSERVAll0NS NO DISCREPANCIES IDENilf f f D Ett PS 06/27/94 94-013 0 flRE PROTECil0N MONIHtY DBSERVAil0W5 Sail 5fAC10RV EtROD PS 07/29/94 94 014 0 flRE PROTECil0N MON 1HtV OBSERVATIONS /1 HE AT DETECTOR SAilstACfopt EtROD SURVEltt ANCE OBSERvf D PS 01/20/95 94 025 0 flRE PROTECil0N flRE drill SIIE f lRE PRIGADE AND Of FS11E ASSIST ANCE RE SPONSE WAS 11 met Y W11H PREVAITE EXCEttfNI C00rfRATlON PS 03/31/95 95 004 0 FIRE FROTEtil04 MONTHlV OBSERVAlloNS SAfl5fAC10RV FREVAlif PS 04/01/95 95 007 0 FIRE FROTECil0N MONIH1V OBSERVAll0NS SAllStACIORY f tE VA11E PS 04/01/95 95-007 1 flRE PROIECil0N UNIT 1 PRE 550RllER CUBICLE flRE ArrRof'RIAlltY E val tfAl[D 'AND ADDRESSED FRE VA11E PS 04/29/95 95-009 0 FIRE PROTECil0N MONTHlv OBSERVAllONS SAfl5fACIORT rREVAllE PS 06/03/95 95 010 0 FIRE PROTECTION MONIHtt OBSERVAll0NS SAll5FAC1tWV FREVAllE PS 07/01/95 95-012 0 flRE PROTECil0N FIRE PR01Etil0N EQUIPMENI XTPM DEttM,E FIPING BADtf CORRODED /RErlACED PREVAIIE PS 07/01/95 95-012 0 FIRE PROTECTION SURVEltlANCES SAllsfACIORY rREVAllE PS 07/01/95 95-012 0 FIRE FROTECTION FROCEDURE AUDif MINOR DEf ICl[NCIE S FREVAITE PS 07/01/95 95-012 0 FIRE PROTECTION FIRE BRIGADE DRit t SAll5f ACIfFT, I ACFED RE At ISM, ITCHNtot45 UfAF PREVAIIE PS 07/01/95 95-012 0 FIRE PROTECil0N TIRE BRIGADE DEflCIENCIES NoiED la rHYSICAL QUAllFICAlloNS PREVAliE PS 07/01/95 95-012 0 flRE PROTEtil0N FIRE PROTECil0N EQUIPMENT -
SATISFACTORY FREVATIE EXilNGUISHERS PS 08/23/94 94 015 0 FIRE PROTECTION, rHYSICAL MONTHtf DBSERVAIION PERFORMED IN HIGHtY FROFESSIONAL MANNER rpEVAITE PR0iECil04 PS
/ /
95-018 0 FIRE PROTECTION, PNYSICAL MONTHLY OBSERVAllONS NO DEFICIENCIES IDENilflED PREVAffE PROTECiloll, ItAD10 LOGICAL N
PROTECTION pS
.