ML20137L209

From kanterella
Jump to navigation Jump to search
Forwards Summary of Changes Made to Safeguards Review Rept, Rev 44 to St Lucie Physical Security Plan,Case Number N5S72VA50033595.W/o Encl.Rev Acceptable for Inclusion in Plan
ML20137L209
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/22/1995
From: Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcguire D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML17354B293 List:
References
FOIA-96-485 NUDOCS 9704070173
Download: ML20137L209 (1)


Text

_ _ _,

/>S Karoq'o$

UNITED STATES NUCLEAR REGULATORY COMMISSION O

REGloN 11 o

101 MARIFTTA STREET, N.W., SUITE 2900 f

ATLANTA, GEORGIA 303DC199 4

...../

kS

[gh MEMORANDUM TO: David R. McGuire, Chief Safeguards Section Nuclear Materials Safety and Safeguards branch Divisicn of Radiation Safety and Safeguards FROM:

William J. Tobin, Senior Safeguards Inspector

SUBJECT:

SAFEGUARDS REVIEW REPORT REVISION 44 TO THE ST. LUCIE PHYSICAL P'_AN CASE CONTROL NUMBER N5S72VA50033595 BACKGROUND: By letter dated May 9, 1995, Florida Power and Light Company submitted revision 44 to the Physical Security Plan under the provisions os 10 CFR 5054(p).

i i

EVALUATION: The enclosure represents and accurate summary of the changes made.

7 The revision does no appear to lessen the effectiveness of the previously approved Plan and is, therefore, acceptable for inclusion in the Plan.

i l

Enclosure:

Summary of Change cc: Region II Licensing File No. 72VA 50-335, 389 9704070173 970325 PDR FOIA BINDER 96-485 PDR

,