ONS-2013-002, Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-10 | 22 October 2013 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-10 | Shutdown Margin B.5.b Earthquake Fire Protection Program |
ONS-2013-006, Technical Specification Bases Change | 13 November 2013 | Technical Specification Bases Change | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ONS-2013-007, Core Operating Limits Report (COLR) | 25 November 2013 | Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin |
ONS-2013-012, Station(Ons), Unit 1, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Standby Shutdown Facility (Ssf) Quality Requirements License Amendment Request (LAR) No. 2012-11 | 24 October 2013 | Station(Ons), Unit 1, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Standby Shutdown Facility (Ssf) Quality Requirements License Amendment Request (LAR) No. 2012-11 | Safe Shutdown Tornado Missile Stress corrosion cracking License Renewal |
ONS-2013-015, Emergency Plan, Volume a, Revision 2013-01 | 14 November 2013 | Emergency Plan, Volume a, Revision 2013-01 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Probabilistic Risk Assessment Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage Siren Operational leakage |
ONS-2013-016, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 2 | 25 October 2013 | Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 2 | Affidavit |
ONS-2013-022, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 | 2 December 2013 | Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 | |
ONS-2013-023, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3 | 29 November 2013 | Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3 | |
ONS-2013-025, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14 | 2 December 2013 | Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14 | Shutdown Margin Earthquake Minimum staff |
ONS-2013-027, Emergency Response Data System (ERDS) | 21 November 2013 | Emergency Response Data System (ERDS) | |
ONS-2013-029, Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License. | 26 November 2013 | Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License. | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Offsite Circuit |
ONS-2013-031, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 25 November 2013 | Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Unanalyzed Condition Seismic Walkdown Report |
ONS-2013-034, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 5 | 29 November 2013 | Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 5 | Affidavit |
ONS-2013-035, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25H | 19 December 2013 | Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25H | Tornado Missile Probabilistic Risk Assessment Aging Management TORMIS Commercial Grade Fire Protection Program |
ONS-2013-036, (Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 2 | 12 December 2013 | (Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 2 | Fire Protection Program |
ONS-2013-037, Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7 | 18 December 2013 | Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7 | Safe Shutdown Shutdown Margin Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Operator Manual Action Emergency Lighting B.5.b Earthquake Turbine Missile Fire Protection Program GOTHIC |
ONS-2013-044, Ufsar/Selected Licensee Commitments Change | 21 January 2014 | Ufsar/Selected Licensee Commitments Change | |
ONS-2013-045, Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers. | 19 December 2013 | Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers. | Grab sample |
ONS-2014-002, Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-14447 | 16 January 2014 | Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-14447 | Post Accident Monitoring |
ONS-2014-003, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. | 3 February 2014 | Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. | Open Phase Condition |
ONS-2014-004, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01 | 4 February 2014 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01 | |
ONS-2014-006, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-002 | 12 February 2014 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-002 | Shutdown Margin B.5.b Earthquake |
ONS-2014-007, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2014-003 | 4 February 2014 | Emergency Plan Implementing Procedures Manual, Volume C, Revision 2014-003 | Boric Acid Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Recently irradiated fuel |
ONS-2014-012, Submittal of Technical Specification Bases Change | 3 February 2014 | Submittal of Technical Specification Bases Change | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ONS-2014-014, Response to Request for Additional Information Regarding Near-Term Task Force (NTTF) Recommendation 2.3, Flooding Walkdowns - Review of Available Physical Margin (APM) Assessments | 30 January 2014 | Response to Request for Additional Information Regarding Near-Term Task Force (NTTF) Recommendation 2.3, Flooding Walkdowns - Review of Available Physical Margin (APM) Assessments | Fukushima Dai-Ichi |
ONS-2014-015, Responses to U.S. Nuclear Regulatory Commission Request for Additional Information for Duke Energy Carolinas, LLC Exemption Request from Certain Requirements of 10 CFR 72.212(b)(3) and 72.212(b)(11) | 8 December 2014 | Responses to U.S. Nuclear Regulatory Commission Request for Additional Information for Duke Energy Carolinas, LLC Exemption Request from Certain Requirements of 10 CFR 72.212(b)(3) and 72.212(b)(11) | Exemption Request Affidavit |
ONS-2014-020, License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LAR No. 2013-05 | 20 May 2014 | License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LAR No. 2013-05 | Surveillance Frequency Control Program |
ONS-2014-020, Oconee, Units 1, 2 and 3 - License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, | 20 May 2014 | Oconee, Units 1, 2 and 3 - License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LAR | Surveillance Frequency Control Program |
ONS-2014-021, Licensing Basis for the Protected Service Water System - Response to Request for Additional Information (RAI) No. 190; Revised Responses to RAI Nos. 134 and 165; License Amendment Request (LAR) 2008-07 - Supplement 8 | 14 February 2014 | Licensing Basis for the Protected Service Water System - Response to Request for Additional Information (RAI) No. 190; Revised Responses to RAI Nos. 134 and 165; License Amendment Request (LAR) 2008-07 - Supplement 8 | Hydrostatic Design basis earthquake Earthquake Fire Protection Program |
ONS-2014-024, Closure Option 1 Response for Generic Safety Issue (GSI)-1 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance in Resolution of Final Issues Related to Generic Letter (GL) 2004-02, Potential Impact of Deb | 27 February 2014 | Closure Option 1 Response for Generic Safety Issue (GSI)-1 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance in Resolution of Final Issues Related to Generic Letter (GL) 2004-02, Potential Impact of Debris. | Fuel cladding Scaffolding |
ONS-2014-026, Submission of 2014 Annual Commitment Change Report | 26 March 2015 | Submission of 2014 Annual Commitment Change Report | |
ONS-2014-028, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 February 2014 | Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ONS-2014-029, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2014 | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Mission time FLEX GOTHIC |
ONS-2014-031, Technical Specification (TS) Bases Change | 4 March 2014 | Technical Specification (TS) Bases Change | Fuel cladding |
ONS-2014-032, Ufsar/Selected Licensee Commitments Change | 4 March 2014 | Ufsar/Selected Licensee Commitments Change | Fire Barrier Probabilistic Risk Assessment License Renewal Earthquake Fire Protection Program Fire Watch Hourly Fire Watch |
ONS-2014-033, End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report | 3 March 2014 | End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report | |
ONS-2014-036, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 6 | 20 March 2014 | Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 6 | Affidavit |
ONS-2014-037, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Commitment Due Date Change for Action Item No. 6 | 20 March 2014 | Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Commitment Due Date Change for Action Item No. 6 | |
ONS-2014-040, 2013 Annual Commitment Change Report | 31 March 2014 | 2013 Annual Commitment Change Report | Unidentified leakage |
ONS-2014-042, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-007 | 25 March 2014 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-007 | B.5.b Earthquake |
ONS-2014-046, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3.. | 31 March 2014 | Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3.. | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake Seismic Walkdown Report |
ONS-2014-048, Licensing Basis for the Protected Service Water (Psw) System - Response to Request for Additional Information (RAI) Nos. 191-194; License Amendment Request (LAR) 2008-07 - Supplement 9 | 3 April 2014 | Licensing Basis for the Protected Service Water (Psw) System - Response to Request for Additional Information (RAI) Nos. 191-194; License Amendment Request (LAR) 2008-07 - Supplement 9 | Safe Shutdown Anticipated operational occurrence Fire Protection Program |
ONS-2014-050, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-010 | 28 April 2014 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-010 | Shutdown Margin B.5.b Earthquake |
ONS-2014-051, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-011 | 28 April 2014 | Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-011 | Shutdown Margin Earthquake Minimum staff |
ONS-2014-053, Response to Request for Additional Information (RAI) Regarding the Fourth Ten Year Interval ISI Plan, Relief Request 13-ON-001 (ADAMS Accession No. ML14040A014) | 10 April 2014 | Response to Request for Additional Information (RAI) Regarding the Fourth Ten Year Interval ISI Plan, Relief Request 13-ON-001 (ADAMS Accession No. ML14040A014) | |
ONS-2014-055, Cycle 27, Core Operating Limits Report | 24 April 2014 | Cycle 27, Core Operating Limits Report | Shutdown Margin |
ONS-2014-056, License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 10 | 11 April 2014 | License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 10 | Probabilistic Risk Assessment |
ONS-2014-059, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 7 | 23 April 2014 | Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 7 | Affidavit |
ONS-2014-060, Letter Regarding Ufsar/Selected Licensee Commitments Change | 12 May 2014 | Letter Regarding Ufsar/Selected Licensee Commitments Change | Mission time Operability Determination Fire Protection Program |
ONS-2014-061, Licensing Basis for the Protected Service Water (Psw) System - Response to Requests for Additional Information Regarding Psw Cabling Aging Management Program and Fant Line Supply to Psw Degraded Voltage Protection; License Amendment Req | 24 July 2014 | Licensing Basis for the Protected Service Water (Psw) System - Response to Requests for Additional Information Regarding Psw Cabling Aging Management Program and Fant Line Supply to Psw Degraded Voltage Protection; License Amendment Request | Aging Management License Renewal |