Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ONS-2013-002, Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-1022 October 2013Emergency Plan Implementing Procedures Manual Volume C, Revision 2013-10Shutdown Margin
B.5.b
Earthquake
Fire Protection Program
ONS-2013-006, Technical Specification Bases Change13 November 2013Technical Specification Bases ChangeSafe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
ONS-2013-007, Core Operating Limits Report (COLR)25 November 2013Core Operating Limits Report (COLR)Boric Acid
Shutdown Margin
ONS-2013-012, Station(Ons), Unit 1, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Standby Shutdown Facility (Ssf) Quality Requirements License Amendment Request (LAR) No. 2012-1124 October 2013Station(Ons), Unit 1, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Standby Shutdown Facility (Ssf) Quality Requirements License Amendment Request (LAR) No. 2012-11Safe Shutdown
Tornado Missile
Stress corrosion cracking
License Renewal
ONS-2013-015, Emergency Plan, Volume a, Revision 2013-0114 November 2013Emergency Plan, Volume a, Revision 2013-01Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Probabilistic Risk Assessment
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Siren
Operational leakage
ONS-2013-016, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 225 October 2013Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 2Affidavit
ONS-2013-022, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 52 December 2013Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5
ONS-2013-023, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 329 November 2013Response to Request for Additional Information (RAI) Regarding License Amendment Request to Update Pressure-Temperature Limit Curves License Amendment Request (LAR) No. 2012-10, Supplement 3
ONS-2013-025, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-142 December 2013Emergency Plan Implementing Procedures Manual, Volume C, Revision 2013-14Shutdown Margin
Earthquake
Minimum staff
ONS-2013-027, Emergency Response Data System (ERDS)21 November 2013Emergency Response Data System (ERDS)
ONS-2013-029, Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License.26 November 2013Additional Information Regarding License Amendment Request for Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License.Safe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Offsite Circuit
ONS-2013-031, Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns25 November 2013Response to Request for Additional Information Regarding the Seismic Hazard Walkdowns Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsUnanalyzed Condition
Seismic Walkdown Report
ONS-2013-034, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 529 November 2013Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06, Supplement 5Affidavit
ONS-2013-035, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25H19 December 2013Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments 8T, 10T, 17T, and 25HTornado Missile
Probabilistic Risk Assessment
Aging Management
TORMIS
Commercial Grade
Fire Protection Program
ONS-2013-036, (Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 212 December 2013(Ons), Units 1, 2, and 3 - Completion of Protected Service Water System Milestone 2Fire Protection Program
ONS-2013-037, Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 718 December 2013Licensing Basis for Protected Service Water System - Responses to Request for Additional Information Item Nos. 172 Through 189, License Amendment Request (LAR) 2008-07 - Supplement 7Safe Shutdown
Shutdown Margin
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operator Manual Action
Emergency Lighting
B.5.b
Earthquake
Turbine Missile
Fire Protection Program
GOTHIC
ONS-2013-044, Ufsar/Selected Licensee Commitments Change21 January 2014Ufsar/Selected Licensee Commitments Change
ONS-2013-045, Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers.19 December 2013Special Report in Accordance with Selected Licensee Commitment (SLC) 16.7.4, Hydrogen Analyzers.Grab sample
ONS-2014-002, Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-1444716 January 2014Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-14447Post Accident Monitoring
ONS-2014-003, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System.3 February 2014Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System.Open Phase Condition
ONS-2014-004, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-014 February 2014Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01
ONS-2014-006, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-00212 February 2014Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-002Shutdown Margin
B.5.b
Earthquake
ONS-2014-007, Emergency Plan Implementing Procedures Manual, Volume C, Revision 2014-0034 February 2014Emergency Plan Implementing Procedures Manual, Volume C, Revision 2014-003Boric Acid
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Recently irradiated fuel
ONS-2014-012, Submittal of Technical Specification Bases Change3 February 2014Submittal of Technical Specification Bases ChangeSafe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
ONS-2014-014, Response to Request for Additional Information Regarding Near-Term Task Force (NTTF) Recommendation 2.3, Flooding Walkdowns - Review of Available Physical Margin (APM) Assessments30 January 2014Response to Request for Additional Information Regarding Near-Term Task Force (NTTF) Recommendation 2.3, Flooding Walkdowns - Review of Available Physical Margin (APM) AssessmentsFukushima Dai-Ichi
ONS-2014-015, Responses to U.S. Nuclear Regulatory Commission Request for Additional Information for Duke Energy Carolinas, LLC Exemption Request from Certain Requirements of 10 CFR 72.212(b)(3) and 72.212(b)(11)8 December 2014Responses to U.S. Nuclear Regulatory Commission Request for Additional Information for Duke Energy Carolinas, LLC Exemption Request from Certain Requirements of 10 CFR 72.212(b)(3) and 72.212(b)(11)Exemption Request
Affidavit
ONS-2014-020, License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LAR No. 2013-0520 May 2014License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LAR No. 2013-05Surveillance Frequency Control Program
ONS-2014-020, Oconee, Units 1, 2 and 3 - License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement,20 May 2014Oconee, Units 1, 2 and 3 - License Amendment Request to Remove Obsolete Information from Technical Specifications, Delete Surveillance Requirements That Equipment Design Cannot Support and Correct a Non-Conservative Condition Statement, LARSurveillance Frequency Control Program
ONS-2014-021, Licensing Basis for the Protected Service Water System - Response to Request for Additional Information (RAI) No. 190; Revised Responses to RAI Nos. 134 and 165; License Amendment Request (LAR) 2008-07 - Supplement 814 February 2014Licensing Basis for the Protected Service Water System - Response to Request for Additional Information (RAI) No. 190; Revised Responses to RAI Nos. 134 and 165; License Amendment Request (LAR) 2008-07 - Supplement 8Hydrostatic
Design basis earthquake
Earthquake
Fire Protection Program
ONS-2014-024, Closure Option 1 Response for Generic Safety Issue (GSI)-1 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance in Resolution of Final Issues Related to Generic Letter (GL) 2004-02, Potential Impact of Deb27 February 2014Closure Option 1 Response for Generic Safety Issue (GSI)-1 91, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance in Resolution of Final Issues Related to Generic Letter (GL) 2004-02, Potential Impact of Debris.Fuel cladding
Scaffolding
ONS-2014-026, Submission of 2014 Annual Commitment Change Report26 March 2015Submission of 2014 Annual Commitment Change Report
ONS-2014-028, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2014Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ONS-2014-029, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2014Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Mission time
FLEX
GOTHIC
ONS-2014-031, Technical Specification (TS) Bases Change4 March 2014Technical Specification (TS) Bases ChangeFuel cladding
ONS-2014-032, Ufsar/Selected Licensee Commitments Change4 March 2014Ufsar/Selected Licensee Commitments ChangeFire Barrier
Probabilistic Risk Assessment
License Renewal
Earthquake
Fire Protection Program
Fire Watch
Hourly Fire Watch
ONS-2014-033, End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report3 March 2014End of Cycle 26 Refueling Outage Steam Generator Inservice Inspection Report
ONS-2014-036, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 620 March 2014Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 6Affidavit
ONS-2014-037, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Commitment Due Date Change for Action Item No. 620 March 2014Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Commitment Due Date Change for Action Item No. 6
ONS-2014-040, 2013 Annual Commitment Change Report31 March 20142013 Annual Commitment Change ReportUnidentified leakage
ONS-2014-042, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-00725 March 2014Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-007B.5.b
Earthquake
ONS-2014-046, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3..31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3..Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Seismic Walkdown Report
ONS-2014-048, Licensing Basis for the Protected Service Water (Psw) System - Response to Request for Additional Information (RAI) Nos. 191-194; License Amendment Request (LAR) 2008-07 - Supplement 93 April 2014Licensing Basis for the Protected Service Water (Psw) System - Response to Request for Additional Information (RAI) Nos. 191-194; License Amendment Request (LAR) 2008-07 - Supplement 9Safe Shutdown
Anticipated operational occurrence
Fire Protection Program
ONS-2014-050, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01028 April 2014Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-010Shutdown Margin
B.5.b
Earthquake
ONS-2014-051, Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-01128 April 2014Emergency Plan Implementing Procedures Manual Volume C, Revision 2014-011Shutdown Margin
Earthquake
Minimum staff
ONS-2014-053, Response to Request for Additional Information (RAI) Regarding the Fourth Ten Year Interval ISI Plan, Relief Request 13-ON-001 (ADAMS Accession No. ML14040A014)10 April 2014Response to Request for Additional Information (RAI) Regarding the Fourth Ten Year Interval ISI Plan, Relief Request 13-ON-001 (ADAMS Accession No. ML14040A014)
ONS-2014-055, Cycle 27, Core Operating Limits Report24 April 2014Cycle 27, Core Operating Limits ReportShutdown Margin
ONS-2014-056, License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 1011 April 2014License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 10Probabilistic Risk Assessment
ONS-2014-059, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 723 April 2014Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 7Affidavit
ONS-2014-060, Letter Regarding Ufsar/Selected Licensee Commitments Change12 May 2014Letter Regarding Ufsar/Selected Licensee Commitments ChangeMission time
Operability Determination
Fire Protection Program
ONS-2014-061, Licensing Basis for the Protected Service Water (Psw) System - Response to Requests for Additional Information Regarding Psw Cabling Aging Management Program and Fant Line Supply to Psw Degraded Voltage Protection; License Amendment Req24 July 2014Licensing Basis for the Protected Service Water (Psw) System - Response to Requests for Additional Information Regarding Psw Cabling Aging Management Program and Fant Line Supply to Psw Degraded Voltage Protection; License Amendment RequestAging Management
License Renewal