ONS-2014-056, License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 10

From kanterella
Jump to navigation Jump to search

License Condition for the Unit 3 High Energy Line Break (Helb); License Amendment Request (LAR) 2008-07; Supplement 10
ML14107A034
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/11/2014
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2014-056
Download: ML14107A034 (11)


Text

SCOTT L.BATSON 4 DUKE Vice President Oconee Nuclear Station e'~ENERGY.

Duke Energy ONO IVP / 7800 RochesterHwy Seneca, SC 29672 ONS-2014-056 864-873-3274 864-873-4208 fax Scott.Batson@duke-energy.com April 11, 2014 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2746 Duke Energy Carolinas, LLC Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287, Renewed Operating Licenses DPR-38, DPR-47, and DPR-55

Subject:

License Condition for the Unit 3 High Energy Line Break (HELB); License Amendment Request (LAR) 2008-07; Supplement 10 As part of a HELB LAR submittal dated December 16, 2011, Duke Energy Carolinas, LLC (Duke Energy) committed to the implementation of a Protected Service Water (PSW) system. This LAR has subsequently been supplemented by Duke Energy letters dated January 20, 2012, March 1 and 16, 2012, July 11 and 20, 2012, August 31, 2012, November 2, 2012, April 5, 2013, June 28, 2013, August 7, 2013, December 18, 2013, February 14, 2014, and April 3, 2014.

Recently there have been phone discussions and Request for Information (RAI) response correspondence between the Staff and Duke Energy regarding seismic qualification and design basis requirements for the PSW building (primarily RAI item 141). As such, and as previously discussed with the Staff, in order to support the completion of a PSW Safety Evaluation, Duke Energy proposes the following Licensing Condition "1":

Duke Energy Carolinas,LLC (Duke Energy) shall perform a seismic probabilisticrisk assessment (SPRA) which includes the ProtectedService Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No. 1025287, "Seismic Evaluation Guidance: Screening, Prioritizationand Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation

2. 1: Seismic,"(i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Equipment List (SEL) to include the PS W system.

Attachments 1 and 2 contain the marked-up and reprinted pages for the ONS Units 1, 2, and 3 Renewed Facility Operating Licenses.

www.duke-energy.com A4co

U. S. Nuclear Regulatory Commission April 11, 2014 Page 2 The aforementioned License Condition does not impact the conclusions of the No Significant Hazards Consideration or Environmental Evaluation included in the December 16, 2011, HELB LAR.

Pursuant to 10 CFR 50.91, a copy of this proposed license amendment is being sent to the State of South Carolina.

If you have any questions in regard to this letter, please contact Stephen C. Newman, Regulatory Affairs Lead Engineer, Oconee Nuclear Station, at (864) 873-4388 or Timothy D.

Brown, PSW Licensing Manager at (864) 873-3952.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 11, 2014.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachments:

1. Marked-up pages (Renewed Facility Operating Licenses for Units 1, 2, and 3)
2. Reprinted pages (Renewed Facility Operating Licenses for Units 1, 2, and 3)

U. S. Nuclear Regulatory Commission April 11, 2014 Page 3 cc: (w/attachments)

Mr. James R. Hall, Senior Project Manager (by electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation, Mailstop: O-8B1 11555 Rockville Pike Rockville, MD 20852 Mr. Victor M. McCree, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Ms. Susan E. Jenkins, Manager Radioactive & Infectious Waste Management SC Dept. of Health and Environmental Control 2600 Bull St.

Columbia, SC 29201

Attachment 1 Marked-up pages Renewed Facility Operating Licenses for ONS Units 1, 2, and 3

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
1. Protected Service Water System Seismic Assessment License Condition Duke Ener-gy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No. 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Eguipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on February 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Roy P. Zimmerman Roy Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-38 Date of Issuance May 23, 2000 Renewed License No. DPR-38 Amendment No. xxx,374

-11 -

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders I. Protected Service Water System Seismic Assessment License Condition Duke Enermy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No.

1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Ener-qy shall expand the Seismic Equipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on October 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-47 Date of issuance: May 23, 2000 Renewed License No. DPR-47 Amendment No. xxx3-7,

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders I. Protected Service Water System Seismic Assessment License Condition Duke Energy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No. 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Equipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on July 19, 2034.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-55 Date of issuance: May 23, 2000 Renewed License No. DPR-55 Amendment No. xxx3-72

Attachment 2 Reprinted pages Renewed Facility Operating Licenses for ONS Units 1, 2, and 3

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Protected Service Water System Seismic Assessment License Condition Duke Energy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No. 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Equipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on February 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Roy P. Zimmerman Roy Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-38 Date of Issuance May 23, 2000 Renewed License No. DPR-38 Amendment No. xxx

-11 -

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders Protected Service Water System Seismic Assessment License Condition Duke Energy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No.

1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Equipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on October 6, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-47 Date of issuance: May 23, 2000 Renewed License No. DPR-47 Amendment No. xxx

-11 -

(b) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. SFP mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders
1. Protected Service Water System Seismic Assessment License Condition Duke Energy Carolinas, LLC (Duke Energy) shall perform a seismic probabilistic risk assessment (SPRA) which includes the Protected Service Water (PSW) system, in accordance with the Electric Power Research Institute (EPRI) Report No. 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic," (i.e., the SPID report, November 2012) for the Oconee Nuclear Station (ONS). Duke Energy shall expand the Seismic Equipment List (SEL) to include the PSW system.

4. This renewed license is effective as of the date of issuance and shall expire at midnight on July 19, 2034.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Roy P. Zimmerman Roy P. Zimmerman, Acting Director Office of Nuclear Reactor Regulation

Attachment:

1) Appendix A - Technical Specifications Renewed License No. DPR-55 Date of issuance: May 23, 2000 Renewed License No. DPR-55 Amendment No. xxx