MONTHYEARONS-2018-025, 2017 Annual Radiological Environmental Operating Report (AREOR)2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report (AREOR) ONS-2018-024, 2017 Annual Radioactive Effluent Release Report (ARERR)2018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report (ARERR) ONS-2018-032, Ufsar/Selected Licensee Commitment Changes2018-04-17017 April 2018 Ufsar/Selected Licensee Commitment Changes ONS-2018-029, Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 32018-04-0404 April 2018 Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 3 ONS-2018-027, Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-0022018-03-28028 March 2018 Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-002 ONS-2018-023, Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency2018-03-20020 March 2018 Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency ONS-2018-017, Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan2018-03-15015 March 2018 Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan ONS-2018-021, ISFSI - Submittal of 2017 Annual Effluent Release Report2018-03-0101 March 2018 ISFSI - Submittal of 2017 Annual Effluent Release Report ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2018-015, Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cabl2018-02-19019 February 2018 Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cables i ONS-2018-014, License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-012018-02-12012 February 2018 License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-01 ONS-2018-019, Submittal of Emergency Plan, Section B2018-02-0505 February 2018 Submittal of Emergency Plan, Section B ONS-2018-011, Ufsar/Selected Licensee Commitment Changes2018-01-25025 January 2018 Ufsar/Selected Licensee Commitment Changes ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2017-12-0404 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ONS-2017-083, Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 02017-11-21021 November 2017 Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 0 ONS-2017-041, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments2017-11-15015 November 2017 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments ONS-2017-085, Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)2017-11-15015 November 2017 Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR) ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-11-13013 November 2017 Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-078, Emergency Plan Revision 2017-0042017-11-0909 November 2017 Emergency Plan Revision 2017-004 ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 ONS-2017-067, Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 22017-10-16016 October 2017 Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 2 ONS-2017-069, (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement2017-10-13013 October 2017 (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0022017-10-0505 October 2017 Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 ONS-2017-072, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-10-0303 October 2017 Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-066, Registration for Use of General License Spent Fuel Cask Numbers 147 and 1482017-09-20020 September 2017 Registration for Use of General License Spent Fuel Cask Numbers 147 and 148 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ONS-2017-060, Registration for Use of General License Spent Fuel Cask Numbers 145 and 1462017-08-0303 August 2017 Registration for Use of General License Spent Fuel Cask Numbers 145 and 146 ONS-2017-059, Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary2017-07-31031 July 2017 Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-047, Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 1442017-06-27027 June 2017 Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 144 ONS-2017-042, Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 22017-06-0101 June 2017 Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 2 ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0032017-05-22022 May 2017 Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 ONS-2017-037, 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 2016 Annual Radiological Environmental Operating Report ONS-2017-026, Submittal of Ufsar/Selected Licensee Commitment Change2017-04-11011 April 2017 Submittal of Ufsar/Selected Licensee Commitment Change ONS-2017-024, Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program2017-03-16016 March 2017 Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program ONS-2017-001, Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 0452017-03-0202 March 2017 Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 045 ONS-2017-017, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-001 ONS-2017-018, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-001 ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2017-011, Emergency Plan Revised Evaluation2017-02-0202 February 2017 Emergency Plan Revised Evaluation ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.2017-02-0101 February 2017 Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. ONS-2017-004, Submittal of Core Operating Limits Report2017-01-12012 January 2017 Submittal of Core Operating Limits Report ONS-2017-006, Emergency Plan Revision 2016-0032017-01-12012 January 2017 Emergency Plan Revision 2016-003 ONS-2016-097, Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S)2016-11-17017 November 2016 Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S) ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors2016-11-14014 November 2016 Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2016-11-10010 November 2016 Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations 2018-05-15
[Table view] |
Text
DUKEScott L.Bon Vice President ENERGY, Oconee Nuclear Station Duke Energy ONOIVP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274
- f. 864.873. 4208 Scott.Batson@duke-energy.com ONS-2013-045 December 19, 2013 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station (ONS), Unit No. 2 Docket Nos. 50-270 Renewed License No DPR-47
Subject:
Special Report in accordance with Selected Licensee Commitment (SLC) 16.7.4, "Hydrogen Analyzers" Pursuant to Oconee Nuclear Station's Selected Licensee Commitment (SLC) 16.7.4, Condition C, this letter constitutes a special report regarding the inoperability of both channels of Hydrogen Analyzers on Unit 2. The SLC commitment requires that if one Hydrogen Analyzer channel is inoperable for greater than 30 days or if both channels are inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, a Special Report shall be prepared and submitted within 14 days of the entering the condition. The report is to outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel(s).
This Special Report is being submitted due to both Unit 2 Hydrogen analyzer channels being non-functional for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The information required by this Special Report is included as an attachment.
This letter contains no new regulatory commitments.
Ifyou have any questions regarding this submittal, please contact David Haile, Oconee Regulatory Affairs at 864-873-4742.
Sincerely, Scott L. Batson, Vice President, Oconee Nuclear Station
Attachment:
Oconee Nuclear Station Unit 2 Special Report per SLC 16.7.4, Condition C
United States Nuclear Regulatory Commission Seismic Walkdown RAI November 25, 2013 Page 2 cc:
Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman, Project Manager (ONS)
(by electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8C2 Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Page 2 of 2
United States Nuclear Regulatory Commission Seismic Walkdown RAI November 25, 2013 Page 3 bxc:
T.P. Gillespie (EC07H)
T.D. Ray (ON01VP)
R.H. Guy (ON01VP)
T.L. Patterson (ON01VP)
C.J. Wasik (ON03RC)
D.C. Haile (ON03RC)
ONS Master File (ON02DM, File OS 801.01)
ELL (EC2ZF)
Page 3 of 2
Attachment Oconee Nuclear Station, Unit 2 Special Report per SLC 16.7.4, (Condition C)
Reporting Requirement:
The ONS Selected Licensee Commitment (SLC) 16.7.4, "Hydrogen Analyzers," is applicable in Modes 1,2, and 3. Condition C of the SLC addresses the circumstance of having one Hydrogen Analyzer channel inoperable for greater than 30 days or two channels inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. When either of these scenarios occur, a Special Report is required to be prepared and submitted within 14 days. The report is to outline a preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the channel(s).
Background
The Hydrogen Analyzers are provided to detect high hydrogen concentration conditions that represent a potential for containment breach from a hydrogen explosion during accident conditions. The elimination of the design basis LOCA hydrogen release, eliminated the need for Hydrogen Analyzers to mitigate design basis accidents. The Hydrogen Analyzers serve as Regulatory Guide 1.97, Category 3 instrumentation and are used to assess the degree of core damage following a severe accident and can confirm when an ignition of hydrogen has occurred (random or deliberate).
The Hydrogen Analyzers are used to detect high hydrogen concentration conditions and to provide information to monitor and assess unit status and behavior following an accident. Two OPERABLE channels ensure that no single failure prevents having the information necessary to determine if high hydrogen concentrations are present.
The Hydrogen Analyzers consist of two independent channels with readout from each channel and a recorder on one channel.
Description of Condition:
Unit 2 initiated refueling outage (RF26) activities in early October 2013. During the outage maintenance was performed on both trains of Hydrogen Analyzers, involving replacement and refurbishment of associated solenoid valves inside and outside the reactor building. When post maintenance testing was performed on 11/21 and 11/30 (for Train A and B respectively),
acceptable results could not be achieved for either channel. Troubleshooting and repair efforts were initiated. However, due to the long durations required for iterations of troubleshooting and testing (approximately 12-16 hours for a complete cycle), repairs could not be completed prior to mode escalations coming out of the outage. Mode 3 was entered on December 3, 2013 and neither of the channels were returned to service within the following 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time.
This required entry into Condition C of the SLC, which in turn requires this special report to be written.
Page 1 of 2
Attachment Oconee Nuclear Station, Unit 2 Special Report per SLC 16.7.4, (Condition C)
Cause of the Non-functional Monitors The Hydrogen Analyzers were declared non-functional due to the unacceptable calibration results obtained following maintenance on both channels. Maintenance and replacement of system valves in the sample flow path made it difficult to determine if the problem was related to the analyzer or the affected valves, especially since Operating Experience on analyzer regulator failures existed.
The Train B channel was restored to functional status on December 12, 2013 after replacing a flow diverter valve (2PR-89, "Train B Bypass To Post Accident Sample Panel").
Efforts to identify which component is affecting the A train analyzer remains under troubleshooting and investigation.
Preplanned Alternate Method of Monitoring The pre-planned alternate method for monitoring Reactor Building hydrogen concentrations is to obtain discrete samples for manual analysis.
During times when information regarding Reactor Building Hydrogen concentration would be needed, the Technical Support Center (TSC) will initiate a request (via the Operational Support Center) for Radiation Protection (RP) to obtain a grab sample from the applicable Reactor Building process radiation monitor sample line. The sample is given to Chemistry for analysis and the results (% of H2) are provided back to the TSC.
This method has been reviewed and determined to provide adequate information for the decision making processes that would use hydrogen concentration as an input.
Plans and Schedule for Restoring Functionality The Train B channel was restored to functional status on December 12, 2013. Troubleshooting and repair of the A train channel is ongoing. The A train will be returned to service as opportunity allows and no later than the next Unit 2 refueling outage.
Page 2 of 2