Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010-06 - Supplement 6
ML14087A174
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/20/2014
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14087A172 List:
References
ONS-2014-036 LAR 10-06, Supple. 6
Download: ML14087A174 (3)


Text

,IF SCOTT L.BATSON Vice President DUKE Oconee Nuclear Station

~ENERGY.

Duke Energy ONO IVP / 7800 RochesterHwy Seneca, SC 29672 ONS-2014-036 864-873-3274 864-873-4208 fax Scott.Batson@duke-energy.com March 20, 2014 10CFR50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55

Subject:

Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan; LAR Number 2010 Supplement 6

References:

1. License Amendment Request (LAR) for the Reactor Vessel Internals (RVI)

Inspection Plan, Duke Energy Carolinas, LLC, dated November 8, 2010.

2. License Amendment Request for the Reactor Vessel Internals Inspection Plan (Supplement 1), Duke Energy Carolinas, LLC, dated June 28, 2012.
3. NRC SER of EPRI Report, Materials Reliability Program Report 1016596 (MRP-227), Revision 0, "Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines," (TAC No. ME0680), dated June 22, 2011.
4. Proposed LAR for the RVI Inspection Plan; LAR Number 2010-06, Supplement 5, dated November 29, 2013.
5. Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) email from Richard Guzman (NRC) to Stephen C. Newman (Duke Energy) dated February 5, 2014.

On November 8, 2010, Duke Energy Carolinas, LLC (Duke Energy) submitted License Amendment Request (LAR) 2010-06, to amend Renewed Facility Operating Licenses DPR-38, DPR-47, and DPR-55 for Oconee Nuclear Station (ONS), Units 1, 2, and 3 (Ref. 1). In that submittal, Duke Energy requested that the Nuclear Regulatory Commission (NRC) review and approve a Reactor Vessel Internals (RVI) inspection plan based on "Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-Rev.0)" published by the Electric Power Research Institute (EPRI).

By letter dated June 28, 2012 (Ref. 2), Duke Energy committed to address Action Item

  1. 7 as described in an NRC Safety Evaluation Report (Ref. 3) associated with the pressurized water reactor internals inspection program's material reliability. Duke Attachment 3 to this letter contains proprietary information.

Withhold From Public Disclosure Under 10 CFR 2.390.

Upon removal of Attachment 3 this letter is uncontrolled.

AcO

U. S. Nuclear Regulatory Commission March 20, 2014 Page 2 Energy addressed Action item #7 in a letter dated November 29, 2013 (Ref. 4). By email dated February 5, 2014, the Staff had additional questions related to this submittal.

Attachments 1 and 3, which are the non-proprietary and proprietary versions of the same document, provide Duke Energy's responses to the Staffs most recent questions. As noted in a couple of the RAI responses, due to the proprietary nature of the requested information, AREVA chose not to supply the information as part of the response(s).

Upon NRC request, AREVA can make the information available for Staff review at its local office. The AREVA affidavit in Attachment 2 provides the basis on which the proprietary information may be withheld from public disclosure by the NRC pursuant to 10 CFR 2.390. In addition, the response to RAI-5 (3) will be submitted separately. Duke Energy plans to submit this response by April 4, 2014.

There are no new commitments contained in this document. Any inquiries on this submittal should be directed to Stephen C. Newman, ONS Regulatory Affairs Group, at (864) 873-4388.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 20, 2014.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachments:

1. Response to NRC Request for Additional Information (RAI) Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS), Units 1, 2, and 3 [Non-Proprietary Version]
2. AREVA Affidavit
3. Response to NRC Request for Additional Information (RAI) Related to the MRP-227-A Applicant/Licensee Action Item #7 Analysis Supporting the Reactor Vessel Internals Inspection Plan Amendment Request for Oconee Nuclear Station (ONS), Units 1, 2, and 3 [Proprietary Version]

Attachment 3 to this letter contains proprietary information.

Withhold From Public Disclosure Under 10 CFR 2.390.

Upon removal of Attachment 3 this letter is uncontrolled.

U. S. Nuclear Regulatory Commission March 20, 2014 Page 3 cc: (w/attachments)

Mr. Richard Guzman, Senior Project Manager (by electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, MD 20852 Mr. Victor M. McCree, Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station Ms. Susan E. Jenkins, Manager Radioactive & Infectious Waste Management SC Dept. of Health and Environmental Control 2600 Bull St.

Columbia, SC 29201 Attachment 3 to this letter contains proprietary information.

Withhold From Public Disclosure Under 10 CFR 2.390.

Upon removal of Attachment 3 this letter is uncontrolled.