ONS-2014-028, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

From kanterella
Jump to navigation Jump to search

Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14064A197
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/28/2014
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, ONS-2014-028
Download: ML14064A197 (6)


Text

Scott L.Batson DUKE Vice President Oconee Nuclear Station ENERGY. Duke Energy ONO1VP 17800 Rochester Hwy Seneca, SC 29672 ONS-2014-028 o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com February 28, 2014 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Duke Energy Carolina, LLC (Duke Energy)

Oconee Nuclear Station, Units 1, 2 and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55

Subject:

Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

References:

1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012, (Accession No. ML12054A679)
2. Duke Energy Letter, Overall Integrated Plans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated February 28, 2013, (Accession No. ML13086A095)
3. Duke Energy Letter, FirstSix-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), Dated August 26, 2013, (Accession No. ML13242A009)
4. NRC Letter to Oconee Nuclear Station, Interim Staff Evaluation And Request For Additional Information-Oconee Nuclear Station, Units 1,2 And 3 Regarding Overall IntegratedPlan For Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051) DatedNovember 1, 2013 (Accession No. ML13298A696)

Ladies and Gentlemen, On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference 1) to Duke Energy which was immediately effective and directed Duke Energy to develop a reliable indication of water level in associated spent fuel storage pools. The Order required that, following NRC's issuance of its final Interim Staff Guidance (ISG), Duke Energy would submit an Overall Integrated Plan (OIP), followed by a status report at six-month intervals following the OIP submittal.

Duke Energy has thus far submitted the OIP (Reference 2) and the first six-month update (Reference 3) for Oconee Nuclear Station. By letter dated November 1, 2013 (Reference 4),

United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051)

February 28, 2014 Page 2 the NRC staff provided an Interim Staff Evaluation (ISE) of the OIP. The ISE also contained a Request for Additional Information (RAI) which requested that RAI responses be included in upcoming six-month status reports as answers become available, such that all responses are provided by March 31, 2015.

The purpose of this letter is to provide the second six-month status report. The enclosure provides updates related to OIP changes, if any, for the six-month period following the first six-month reporting period. The information needed to address the RAI has not been finalized as of the submittal of this letter, and thus no RAI responses are included in this report.

This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments.

Should you have any questions regarding this submittal, please contact David Haile with Oconee Regulatory Affairs, at (864) 873-4742.

I declare under penalty of perjury that the foregoing is true and correct. Executed on February 28, 2014.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station

Enclosure:

1. Oconee Nuclear Station Second Six Month Status Report for Order EA-12-051 (SFPI),

Units 1, 2, and 3

'United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051)

February 28, 2014 Page 3 cc:

Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Eric Leeds, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 13-H16M 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Richard Guzman, Project Manager (ONS)

(by electronic mail only)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8C2 Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station

ENCLOSURE

[3 pages]

Oconee Nuclear Station (ONS)

Second Six Month Status Report for Order EA-12-051 (SFPI),

Units 1, 2, and 3 Encl. Page - 1

ENCLOSURE:

ONS SECOND SIX-MONTH STATUS REPORT: ORDER EA-12-051 (SFPI)

(Note: The references for this Enclosure are listed in Section 8)

Introduction On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference El) to Duke Energy and directs them to develop a reliable indication of water level in associated spent fuel storage pools. The Order required each plant to issue an Overall Integrated Plan (OIP) pursuant to the NRC's Interim Staff Guidance (ISG)

(Reference E2) which endorsed, with clarifications and exceptions, the industry guidance document, NEI 12-02 (Reference E3). The Order also required that update reports on progress or change to the OIP be submitted every six months.

Oconee Nuclear Station (ONS) developed an Overall Integrated Plan (OIP) (Reference E4),

describing how compliance with the requirements in the Order would be achieved. The OIP was submitted to the NRC on February 28, 2013, followed by the first six-month update (Reference E5) on August 26, 2013. The OIP and six-month status reports follow the guidance of NEI 12-02 (Reference E3) as endorsed by the NRC's Interim Staff Guidance JLD-ISG-2012-03 (Reference E2).

This report constitutes the second six-month update of milestones, changes to the compliance method or schedule, or any need for relief/relaxation, and the basis, which occurred during the period from July 31, 2013, to January 28, 2014 (hereafter referred to as "the update period").

The NRC provided an Interim Staff Evaluation (ISE) of the OIP to ONS (Reference E7) which also included a Request for Additional Information (RAI) comprised of questions from a previous RAI dated June 21,2013 (Reference E6) and several new questions. The ISE requested that RAI responses be included in upcoming six-month status reports as answers become available, such that all responses are provided by March 31, 2015. Detailed design is underway for the SFP level channels, however no information needed to address the RAIs has been finalized as of the submittal of this letter, and thus no RAI responses are included in this report.

2 Milestone Accomplishments (during the update period)

The following milestones were completed during the update period:

No milestones were completed during the update period.

3 Schedule Status There are no changes to the schedule as reported in the OIP (Reference E4).

4 Changes to Compliance Method No changes were made during the update period.

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation ONS expects to comply with the order implementation date and no relief/relaxation is required at this time.

Encl. Page - 2

ENCLOSURE:

ONS SECOND SIX-MONTH STATUS REPORT: ORDER EA-12-051 (SFPI)

(Note: The references for this Enclosure are listed in Section 8) 6 Open Items from Overall Integrated Plan and Interim Staff Evaluation There are no open items documented in the OIP or in the Interim Staff Evaluation (ISE).

This six-month status report contains no RAI responses.

7 Potential Interim Staff Evaluation Impacts No potential impacts to the ISE have been identified.

8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.

El. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012, (Accession No. ML120554A679)

E2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012, (Accession No. ML12221A339)

E3. NEI 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA-12-051, "To modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,",dated August 2012, (Accession No. ML12240A307)

E4. Duke Energy Letter, Overall IntegratedPlans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-05 1), dated February 28, 2013, (Accession No. ML13086A095).

E5. Duke Energy Letter, First Six-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (OrderNumber EA-12-051), dated August 26, 2013 (Accession No. ML13242A009).

E6. NRC Letter to Oconee Nuclear Station, Request For Additional Information Regarding Overall Integrated Plan For Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), Dated June 21, 2013 (Accession No. ML13171A301)

E7. NRC letter, Oconee Nuclear Station, Units 1, 2, and 3 - Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation(Order Number EA-12-051), dated November 1, 2013, (Accession Number ML13298A696)

Encl. Page - 3