Issue date | Title | Topic | |
---|---|---|---|
ML17053A406 | 5 February 1979 | Forwards GE Topical Rept NEDO-24010-2,Suppl 2,Bases for Criteria for Combination of Earthquake & Other Transient Responses by the Square-Root-Sum-Of-The-Squares Method. Rept Is Provided on Behalf of Mark 2 Owner'S Group | Earthquake |
ML17053A530 | 20 March 1979 | Forwards Proprietary Copies of Alternate Load Spec Info Document Applicable to Wetwell Walls,To Replace Info in NUREG-0487.Encl Withheld (Ref 10CFR2.790).W/affidavit | |
ML17272A965 | 7 May 1980 | Advises of Coordinated Efforts of Util Owners of near-term Bwrs.Utils Will Define Common Licensing Issues & Work Toward Consensus Position Which,When Accepted by Nrc,Will Expedite Closure | |
ML19207A395 | 9 August 1979 | Requests That All Official Correspondence Be Addressed to SW Shields.Chapter 13 of FSAR & Application Vol Will Be Revised to Reflect Organizational Changes | |
ML19207A467 | 29 June 1979 | Supports Prompt Licensing & Operation of Facility.Recommends Adoption of Wastee Disposal Methods & Fuel Reprocessing Begun in Europe | |
ML19207B429 | 3 July 1979 | Responds to IE Bulletin 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Forwards Evaluation of Analysis Procedures for Design of Expansion Anchored Plates in Concrete by Sargent & Lundy Engineers | |
ML19207B462 | 23 August 1979 | Interim Deficiency Rept Re Failure to Incorporate Contractor Change Request 200 Into Concrete Pour in Auxiliary Bldg. Caused by QA Program Breakdown.Review Conducted to Assure Presence of Hold Tags at Pour Locations | |
ML19207C009 | 30 August 1979 | Submits Interim Deficiency Rept Re Potentially Reportable Defect in Concrete Surrounding Fuel Transfer Canal Sump Reported on 790731.Diagnostic Testing Delayed by Recent Order Halting Const.Sonic Testing to Be Performed Soon | |
ML19207C026 | 3 July 1979 | Advises That D Blanch Was Unable to Testify Re Contention 14 on 790629 as Rebuttal Witness for Util.Witness Was in Court as Party in Other Case.Requests to Present Witness During Aug Hearing | |
ML19207C186 | 3 September 1979 | Requests That Const of Facility Be Stopped Permanently Due to Defective Workmanship & Matls | |
ML19207C448 | 5 September 1979 | Confirms 790806 Telcon of Reportable Incident Re Installation of Studs in safety-related Steel Plates W/O Approved Procedure or Evaluation.Procedures Have Been Revised & QA Indoctrination Session Held | |
ML19207C456 | 3 July 1979 | Supports NRC Actions in Rejecting Proposals to End Work at Facility.Suspension of Activities Would Have Inflicted Economic Hardships on Many People | |
ML19208A589 | 17 July 1979 | Forwards for Consideration Ltr from N Ficher Re Allegations Concerning Plant | |
ML19208A872 | 18 May 1979 | Discusses Statements Made by Util Personnel Before ACRS Re Facility Staffing Plans.Util Had No Intention of Misrepresenting Staffing Plans | |
ML19208B105 | 27 July 1979 | Responds to NRC 790625 Ltr Re Violations Noted in IE Insp Rept 50-358/79-14.Corrective Actions:Mgt Audit Scheduled for Week of 790730 & Procedures Will Be Reviewed & Revised | Nondestructive Examination |
ML19208B383 | 11 July 1979 | Requests That NRC Satisfactorily Address Concerns Re Improper Const | |
ML19208B385 | 9 July 1979 | Forwards Affidavits of T Martin,R Anderson & GL Reynolds Re Improper Const & Lack of Compliance W/Qc Stds.Requests Investigation Into Charges | |
ML19208B407 | 17 September 1979 | Forwards Revision 7 to Industrial Security Plan,Constituting Amend 98 to Ol.Revised Pages Withheld (Ref 10CFR2.790) | |
ML19208B545 | 23 July 1979 | Submits Interim Rept Re Silting Condition in River Pump House Intake Flume & Intake Structure,Reported in 790620 Ltr.Caused by Various Seasonal River Conditions. Sedimentation Monitoring Program to Be Implemented | |
ML19208D061 | 7 August 1979 | Forwards Responses to IE Bulletin 79-08, Events Relevant to BWRs Identified During TMI Incident. Cold License Candidates Have Participated in TMI Review.Simulation Refresher Course Conducted | |
ML19208D114 | 31 July 1979 | Requests Limited Appearance Before Public Hearings in Cincinnati,Oh,For Eight Individuals | |
ML19208D165 | 30 August 1979 | Status Rept Re Potential Delamination of Carbozinc 11/Phenoline Coating Sys on Polar Cranes.Blasting of Prime Coat & Repriming Will Be Done When safety-related Work Resumes.Final Rept Will Be Filed Upon Work Completion | |
ML19208D500 | 24 September 1979 | Forwards Petition Calling for Revocation of Facility CP | |
ML19208D568 | 30 August 1979 | FOIA Request for Documents Filed by Plant Workers at Recent Public Hearings in Cincinnati,Oh Re Safety Hazards Surrounding Plant Const.Also Requests Responses to Charges from Util Officials | |
ML19208D720 | 26 July 1979 | Opposes Complete Halt to Const Due to Minor Problems.Urges NRC to Ensure Public Safety by Correcting Problems & to Develop Future Energy Source | |
ML19208D788 | 16 August 1979 | Requests Response to s Rigberg & Citizens Against Radioactive Environ Objections to Delivery of Fuelto Site Prior to Licensing of Plant | |
ML19209A348 | 7 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. No Deep Draft Pumps of Type Described Are Used | |
ML19209A735 | 28 September 1979 | Forwards Amend 99 to OL as Revision 61 to FSAR | |
ML19209B061 | 14 August 1979 | Forwards Applicants 790730 Application for Amend to License SNM-1823.Also Forwards Applicants 790814 Response Re NRC 790807 Questions | |
ML19209B139 | 24 August 1979 | Confirms That R Hofstadter Will Testify on Behalf of Miami Power Project,Re Project Contention 17 | |
ML19209B202 | 13 September 1979 | Responds to NRC 790813 Ltr Re Violations Noted in IE Insp Rept 50-358/79-03.Corrective Actions:Accepted NRC Alternative 2.Coordinating Data Collection W/Leak Chase Channel Installer & A/E | |
ML19209B337 | 10 September 1979 | FOIA Request for Correspondence Between Util & NRC from 780910-790910 Re Postponement & Delay of Inservice Date | |
ML19209B427 | 6 September 1979 | Responds to NRC 790815 Ltr Re Violations Noted in IE Insp Rept 50-358/79-22.Corrective Actions:Ball Bushings Cleaned, Restored Parts Cleaned,Hanger Parts Removed from Floor & Uncleaned Parts Quarantined | |
ML19209B878 | 4 August 1979 | Advises of Actions Completed,Per NRC 790807 Ltr,Re Receipt of Reactor Fuel Under License SNM-7823. Requests Prompt Notification of Approval | |
ML19209C058 | 16 August 1979 | Advises That s Rigberg of Citizens Against Radioactive Environ Expressed Concerns Re Shipment of Fuel to Facility. Answers Addressing s Rigberg Concerns Will Be Appreciated | |
ML19209C163 | 8 October 1979 | Forwards Certificate of Svc for License Application, Amend 99,submitted as Fsar,Revision 61 | |
ML19209C901 | 26 September 1979 | Confirms 790925 Telcon to NRC Reporting Receipt of 790917 Ltr from Gould,Inc,Re Potential Defect in NEMA Size 3 Starters & Contactors.Retrofit Kits & Installation Details Will Be Supplied by Gould,Inc | |
ML19210B907 | 21 September 1979 | Requests That Cooperation Be Given in Const Investigation of R Brown of Congressional Subcommittee.Mutually Convenient Times Should Be Arranged to Meet W/Region 3 Personnel. Document Access Should Be Permitted | |
ML19210B910 | 19 October 1979 | Forwards 791002 PSC of in Project Diagnostic, by Mgt Analysis Co,Fulfilling Requirements of Item 4 of 790815 Confirming Order | |
ML19210B918 | 7 November 1979 | Requests Info Re Facility Concrete Problems,To Aid in Researching Concrete Problems at Limerick Facilities | |
ML19210B997 | 16 October 1979 | FOIA Request for Util OL Applications.Forwards LS Rubenstein 790723 Ltr Providing Description of Requested Document | |
ML19210C083 | 31 October 1979 | Requests Amend of Item 4 of Indemnity Agreement B-85 to Assure Consistency Between Agreemenmt & Both Liability & Property Insurance Coverage.Drawing Encl | |
ML19210C120 | 6 November 1979 | Forwards Certificate of Svc for Amend 100,in Form of Revision 62 to Fsar,Re 791031 Application for License | |
ML19210D030 | 14 November 1979 | Forwards Response Re NEDO-24708, Addl Info Required for NRC Staff Generic Rept on Bwrs. | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Hydrostatic Squib FLEX Scram Discharge Volume Earthquake Power Operated Valves Liquid penetrant |
ML19210D229 | 21 November 1979 | Responds to 791109 Ltr Requesting Response Schedule for Info Per Util Interim Position on Environmental Qualifications of Class IE Equipment.Response Provided by 800615 | |
ML19210D458 | 30 October 1979 | Informs of Direct Testimony Util Will Introduce for Contention 17 Re Fire Protection | |
ML19210D877 | 15 November 1979 | Requests Util Environ Rept | |
ML19210D946 | 15 November 1979 | Requests to Make Limited Appearance Statement at Licensing Prehearing | |
ML19210D966 | 7 November 1979 | Forwards Listing of References Which Will Be Referred to by Intervenor Miami Valley Power Project in Discussing Contention 17 at Licensing Hearings | |
ML19210D968 | 9 November 1979 | Forwards Calculations Re Ampacity of Power Cable Trays Which Disagree W/Fsar Table 8.3-18.OL Should Not Be Granted Until Util Determines Ampacity of Cable Trays |