t
. J i.L*.7. 0 ^. U..
July 23,19 79 QA-1168 U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Director Gentlemen:
RE:
WM.
H.
ZIMMER NUCLEAR POWER STATION - UNIT 1 SERVICE WATER INTAKE STRUCTURE 50.55 (e)
W.O. #57300-957_ JOB E-5590 On June 20, 1979, we submitted our letter QA-1148 to your office, identifying a silting condition which had been dis-covered in the river pump house intake flume and intake structure.
We have evaluated the cause of this condition and have determined that it was influenced to a large extent by various seasonal river conditions.
bulkhead between September,1976 and March,1978.The river entranc During the period of September, 1976 through April 24, 1979, there were two (2) long duration flood stages of the Ohio River which were the apparent cause of much of the collection of sedimentation in the intake flume.
The service water pumps were not in operation during most of this period and as the river increased in elevation and subsequently returned to pool stage, in suspension was deposited within the intake flume behind thethe silt normally held bulkhead.
A thorough inspection of the intake flume and the service water pump bay was conducted and a significant mmount of sedi-mentation was discovered.
We are presently in the process of removing this sedimentation and anticipate that during. normal plant operation similar circumstances will not result in a com-parable sedimentation condition.
Also, during operation of the plant, a sedimentation monitoring program will -be implemented to assure that excess sedimentation is not accumulated in the intake.
3W2G1 JUL 261979 7 909 2 00f530$I-
THE CINCINNATI GAS & ELECTRIC COMPANY vo:
U.
h S. Nuclear Regulatory Commission July 23,1979 QA-ll68 FROM:
E. A. Borgmann
. pact so, 2 Hardware to carry out this monitoring program is being evaluated, and procedures will be developed which will assure that the intake flume and structure are maintained in a cond consistent with operational requirements.
on In accordance with 10CFR50.55(e),
design and construction, which were it to remain uncorrecteda deficiency found could adversely affect the safe operation of the nuclear power plant at any time throughout the expected lifetime of the plant and which represents any one of four other specified conditions is considered a reportable item.
have not remained uncorrected, and the corrective cleaning actionTh implemented has assured non-degredation of the safe operation of the plant.
We, reportable under the requirements of 10CFR50.55 (e).therefor is established and include a copy of the plan for your i We will mation.
We trust that this letter of 10CFR50.55 (e)regarding the monitoring program, w,ill satisfy those and close the item reported on June relative to silting of the service water intake structure.
18, 1979 Yours very truly, THE CINCINNATI GAS & ELECTRIC COMPANY W
E. A. Borgmann Sr. Vice President WWS:jk d g 4,'hb V t'