CY-98-136, Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line12 August 1998Ro:On 980727,flow Blockage Occurred & Caused Pressure in Sys to Increase,Resulting in Relief Valve Lifting & Pipe Vibration,Which Caused Leaks to Develop.Caused by Nearly Closed post-filter Inlet Valve.Repaired 2 Leaks in Line
CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With31 December 1998Annual Rept for 10CFR50.59, for Jan-Dec 1998.WithSafe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Temporary Modification
Process Control Program
Exemption Request
Earthquake
Fuel cladding
Continuous fire watch
Fire Protection Program
Fire Watch
CY-99-047, Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use23 March 1999Ro:On 981217,identified Unsuccessful Dewatering of Cnsi HIC, Model PL8-120R,containing Resins.Caused by Apparent Failure of Dewatering Tree.Other HICs Have Been Procured,Recertified & Returned to Plant for Use
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
IA-84-930, Safety Evaluation Supporting Amends 105 & 99 to Licenses DPR-31 & DPR-41,respectively24 August 1984Safety Evaluation Supporting Amends 105 & 99 to Licenses DPR-31 & DPR-41,respectively
IA-85-826, Partially Released Commission Paper Recommending NRC Response to co-owner Petition for Exemption from License Fee for Withdrawn CP Be in Form of Order.Draft Order Encl25 November 1985Partially Released Commission Paper Recommending NRC Response to co-owner Petition for Exemption from License Fee for Withdrawn CP Be in Form of Order.Draft Order Encl
IA-86-299, Partially Deleted Commission Paper Informing That TMI Alert, Inc Requested Dismissal of Order Granting C Husted Hearing & to Stay Proceedings Pending Resolution of Motion to Dismiss7 March 1986Partially Deleted Commission Paper Informing That TMI Alert, Inc Requested Dismissal of Order Granting C Husted Hearing & to Stay Proceedings Pending Resolution of Motion to Dismiss
IA-86-367, Partially Withheld Affirmative Adjudicatory Issue Re CBS 850324 Broadcast of 60 Minutes on Const of Shoreham5 December 1985Partially Withheld Affirmative Adjudicatory Issue Re CBS 850324 Broadcast of 60 Minutes on Const of Shoreham
IA-87-213, SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp Instrumentation11 June 1986SER Finding Facility Design Acceptable W/Respect to Conformance to Reg Guide 1.97,Rev 3,except for Accumulator Tank Level & Pressure Instrumentation,Containment Sump Water Temp Instrumentation & Quench Tank Temp InstrumentationBoric Acid
IA-87-439, Partially Withheld Secy Rept Re 861020 Order Issued by IE to Licensee to Show Cause Why Operating License Should Not Be Modified to Prohibit Use of Radios,Tapes & Other Entertainment Devices in Plant Control Rooms28 January 1987Partially Withheld Secy Rept Re 861020 Order Issued by IE to Licensee to Show Cause Why Operating License Should Not Be Modified to Prohibit Use of Radios,Tapes & Other Entertainment Devices in Plant Control Rooms
IR 05000482/198501930 September 1985Allegation Review Data Sheet for Case 4-85-A-050 Re Mishandling of Document Control Program.Concerns Addressed in Insp Rept 50-482/85-19.Dept of Labor & Allegation Cases Closed
IR 05000482/198503128 August 1985Allegation Review Data Sheet for Case 4-85-A-077 Re 6 Rem Exposure in Containment Bldg Due to Pipe Break.Allegation Investigated During Insp 50-482/85-31 on 850715-19 & Found UnsubstantiatedOverexposure
L-83-479, Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 198330 June 1983Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 1983Safe Shutdown
Boric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Temporary Modification
Emergency Lighting
Earthquake
Coast down
L-84-224, Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 198430 June 1984Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 1984Safe Shutdown
Boric Acid
Emergency Lighting
Locked High Radiation Area
Design basis earthquake
Earthquake
Scaffolding
L-84-379, Monthly Operating Repts for Nov 198430 November 1984Monthly Operating Repts for Nov 1984
L-85-116, Monthly Operating Repts for Feb 198528 February 1985Monthly Operating Repts for Feb 1985
L-85-156, Monthly Operating Repts for Mar 198531 March 1985Monthly Operating Repts for Mar 1985
L-85-189, Monthly Operating Repts for Apr 198530 April 1985Monthly Operating Repts for Apr 1985
L-85-235, Monthly Operating Repts for May 198531 May 1985Monthly Operating Repts for May 1985
L-85-270, Monthly Operating Repts for June 198530 June 1985Monthly Operating Repts for June 1985
L-85-313, Monthly Operating Repts for Jul 198531 July 1985Monthly Operating Repts for Jul 1985
L-85-362, Monthly Operating Repts for Aug 198531 August 1985Monthly Operating Repts for Aug 1985
L-85-395, Monthly Operating Repts for Sept 198530 September 1985Monthly Operating Repts for Sept 1985
L-85-434, Monthly Operating Repts for Oct 198531 October 1985Monthly Operating Repts for Oct 1985
L-85-460, Monthly Operating Repts for Nov 198530 November 1985Monthly Operating Repts for Nov 1985
L-86-161, Monthly Operating Repts for Mar 198631 March 1986Monthly Operating Repts for Mar 1986
L-86-252, Monthly Operating Repts for May 198631 May 1986Monthly Operating Repts for May 1986
L-86-292, Monthly Operating Repts for June 198630 June 1986Monthly Operating Repts for June 1986
L-86-424, Monthly Operating Repts for Sept 198630 September 1986Monthly Operating Repts for Sept 1986
L-86-465, Monthly Operating Repts for Oct 198631 October 1986Monthly Operating Repts for Oct 1986
L-86-506, Monthly Operating Repts for Nov 198630 November 1986Monthly Operating Repts for Nov 1986
L-87-167, Monthly Operating Repts for Mar 198731 March 1987Monthly Operating Repts for Mar 1987Boric Acid
L-87-214, Monthly Operating Repts for Apr 198730 April 1987Monthly Operating Repts for Apr 1987
L-87-250, Monthly Operating Rept for May 198731 May 1987Monthly Operating Rept for May 1987
L-87-344, Monthly Operating Repts for Jul 198731 July 1987Monthly Operating Repts for Jul 1987
L-87-382, Monthly Operating Repts for Aug 198731 August 1987Monthly Operating Repts for Aug 1987
L-87-421, Monthly Operating Repts for Sept 198730 September 1987Monthly Operating Repts for Sept 1987
L-87-475, Monthly Operating Repts for Oct 198731 October 1987Monthly Operating Repts for Oct 1987
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde26 October 1984Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde
ML09343079431 October 1981Evaluation of Indian Point 3 Nuclear Power Plant.High Radiation Area
ML10032154531 October 1981Evaluation of Indian Point Station Unit No 2.Nondestructive Examination
Temporary Modification
ML17053D16727 May 1982Annual Financial Rept 1981High winds
ML17053D1691 March 1982Annual Financial Rept 1981
ML17223A74526 January 1990Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N
ML17251A48128 February 1989Ultrasonic Indication Sizing Technique Development. Related Info EnclHydrostatic
ML17258A37531 August 1981Evaluation of Robert E Ginna Nuclear Power Plant.
ML17261A53018 June 1987Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys
ML17279A1917 April 1987Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl
ML17298B53930 November 1984Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80.Hydrostatic
ML17298B54030 November 1984Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3.