ML051220109 | 22 April 2005 | Slides & Handouts from Meeting with FPL Energy Seabrook, LLC, Regarding Implementation of Technical Specification 3/4.8.1.1 | Offsite Circuit |
ML051530478 | 18 May 2005 | NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 Event | Boric Acid |
ML051960178 | 30 June 2005 | Enclosure Mtg. Summary with Duke Energy Corp. Licensing Basis for High Energy Line Break (Tac No. MC5457) | Safe Shutdown Shutdown Margin Flow Accelerated Corrosion GOTHIC |
ML051990361 | 27 April 2005 | NRC CY2004 Annual Assessment Meeting, Oconee Nuclear Station | |
ML052080113 | 22 June 2005 | Mtg Summary of 6/22/05, Spring 2005 Steam Generator Inspection Presentation | |
ML052140329 | 9 March 2005 | RIC 2005 Presentation - A3 - Donald G. Harrison - 50.69 | |
ML052220679 | 8 August 2005 | Containment Coatings Work Scope 2EOC21 | Coatings |
ML052360432 | 11 August 2005 | Attachment 3 - Duke Power Slides | Safe Shutdown Enforcement Discretion Fire Protection Program |
ML052560447 | 17 August 2005 | B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program | |
ML052650202 | 20 September 2005 | Oconee Nuclear, Regulatory Performance Meeting | |
ML052770190 | 16 August 2005 | Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear | |
ML052900528 | 27 September 2005 | Meeting Summary, Use of Nuhoms Fuel Storage System Under General License at Surry - 10CFR50.68 Implications | |
ML053040158 | 18 October 2005 | Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System | |
ML053250162 | 22 November 2005 | Att. 4 Millstone Power Station Appeal Faq 55.2 | Mission time |
ML053250237 | 1 November 2005 | 11/1/2005, Presentation from Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Part 72-Licensed Casks in Spent Fuel Pools | Unanalyzed Condition |
ML053290020 | 14 November 2005 | Enclosure 1, Meeting Summary High Energy Line Break | Flow Accelerated Corrosion |
ML053290025 | 14 November 2005 | Enclosure 2, Meeting Summary, Tornado Mitigation Methodology | Safe Shutdown Mission time TORMIS |
ML053490153 | 8 December 2005 | Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time Extension | Safe Shutdown |
ML053560337 | 22 December 2005 | Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML053630166 | 29 December 2005 | Containment Coatings Long Range Plans Presentation on 12/20/2005 | Coatings |
ML060130031 | 16 December 2005 | Meeting Slides, Measurement Uncertainty Recapture Fple/Caldon - NRC Meeting December 16, 2005 | |
ML060250035 | 7 November 2005 | Duke Power NFPA-805 Transition Pilot Observation Management Kickoff, Oconee, November 07, 2005 - Slide Presentation | |
ML060250038 | 7 November 2005 | Duke Power Appendix R Reconstitution, Oconee, November 7, 2005 - Slide Presentation | Hot Short Safe Shutdown Operator Manual Action |
ML060250040 | 8 November 2005 | Duke Power NFPA 805 Ch 4 Methodology Transition Oconee, November 8, 2005 - Slide Presentation | |
ML060250044 | 10 November 2005 | Duke Power NFPA-805 Transition Pilot Observation Project Status, Oconee, November 10, 2005 | Multiple Spurious Operation |
ML060440578 | 8 February 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML060520435 | 6 February 2006 | IR-06-009 Regulatory Conference, Enclosure 2 - Ppoint Redacted Version | |
ML060720430 | 1 March 2006 | March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. | Hot Short Safe Shutdown Significance Determination Process Thermoset Exemption Request Fire Protection Program Backfit |
ML060820202 | 23 March 2006 | NRC Slides for Public Meeting with Dominion Nuclear (Millstone) to Discuss CY2005 Performance | Chernobyl |
ML060820248 | 23 March 2006 | NRC Slides for Public Meeting with FPL Seabrook to Discuss Cy 2005 Performance | |
ML060830079 | 24 March 2006 | NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station | Chernobyl |
ML060940371 | 1 November 2005 | Conference Call Summary Regarding Fall 2005 Steam Generator Inspections at Oconee Nuclear Station, Unit 2 | Stress corrosion cracking |
ML061110085 | 19 April 2006 | NRC Cy 2005 Annual Assessment Meeting, Surry Power Station | |
ML061140370 | 25 April 2006 | Slides for Meeting - Duke Energy - Oconee Steam Generator Wear Root Cause Update with NRC | Flow Induced Vibration |
ML061160200 | 24 April 2006 | Annual Assessment Meeting Cy 2005, Slide Show for Oconee Nuclear Station, 04/24/2006 | |
ML061210060 | 22 March 2006 | Duke Power Meeting Slides, Part 50 License Amendment Request for Dry Storage Loadings at Oconee | |
ML061440099 | 28 March 2006 | Duke Energy Slides from the Epri/Nei I&C Workshop Held on March 28-29, 2006 | |
ML061510601 | 23 May 2006 | EPRI HRA Users Group Review of Draft NUREG-1842 | |
ML061530193 | 27 March 2006 | NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts | Hot Short Safe Shutdown Fire Barrier Time to boil Multiple Spurious Operation Hemyc Fire Protection Program Hourly Fire Watch Manual Operator Action |
ML061590167 | 8 June 2006 | 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment | |
ML061740574 | 20 June 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML061790481 | 9 March 2006 | RIC 2006 Presentation - Th5D - T. Preston Gillespie, Jr - Digital Instrumentation and Control-Diversity and Defense-in-Depth for Digital Systems | Manual Operator Action |
ML061800393 | 17 May 2006 | HELB Pre Decisional Powerpoint Presentation | |
ML062290208 | 26 July 2006 | Meeting Slides Tornado and High-Energy Line Break Mitigation Strategies | Safe Shutdown Tornado Generated Missile TORMIS |
ML062700558 | 12 September 2006 | Encl 2 (Slides) 09/21/06 Memo W Ruland Re Summary of Sept 12, 2006, Meeting with Duke Power to Discuss Oconee ISFSI License Renewal (72-04, 50-269, -270, -287) (TAC L24101) (S118244) | Aging Management License Renewal Exemption Request |
ML063470432 | 6 December 2006 | December 6, 2006, Surry Public Meeting Regarding Chilled Water Piping | Internal Flooding VT-2 Through Wall Leak |
ML070080325 | 13 December 2006 | Licensee'S Handouts for Oconee, Summary of December 13, and 14, 2006 | Reactor Vessel Water Level Anticipated operational occurrence Cyber Security License Renewal Commercial Grade Manual Operator Action Dedication package |
ML070080416 | 12 December 2006 | Licensee Handouts for Oconee, Summary of December 12, 2006 Meeting | |
ML070320074 | 16 October 2006 | NFPA 805 Pilot Observation Visit Trip Report - Presentation Handouts - October, 2006 | Hot Short Safe Shutdown Thermoset Hemyc Fire Protection Program Manual Operator Action |
ML070440491 | 7 January 2007 | Licensee Presentation Material |