ML061110085

From kanterella
Jump to navigation Jump to search
NRC Cy 2005 Annual Assessment Meeting, Surry Power Station
ML061110085
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/19/2006
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
Download: ML061110085 (18)


Text

NRC CY 2005 Annual Assessment Meeting SURRY POWER STATION Surry, Virginia April 19, 2006

Purpose of Todays Meeting z A public forum for discussion of Surrys performance z NRC will address Surrys performance issues identified in the annual assessment letter z Surry management will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda z Introduction z Reactor Oversight Process 3/4 Review 3/4 National Summary of Plant Performance z Surrys Plant Performance Results z Remarks 3/4 Surry Management Response and Remarks 3/4 NRC Closing Remarks z Break z NRC Available to Address Public Questions

Region II Organization William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Victor McCree Director Division of Reactor Projects Director Division of Reactor Safety Joseph Shea Harold Christensen Deputy Director Deputy Director Kerry Landis Regional Specialists Branch Chief Larry Garner Norman Garrett Daniel Arnett Heather Gepford Surry Project Engineers Resident Inspectors

NRC Performance Goals PRIMARY GOALS z Ensure protection of public health and safety and the environment z Ensure the secure use and management of radioactive materials Other Goals z Ensure openness in NRC regulatory process z Ensure that NRC actions are effective, efficient, realistic, and timely z Ensure excellence in NRC management to carry out the NRCs strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs /3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs /2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs /2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Safety Significance Green: Very low safety issue White: Low-to-moderate safety issue Yellow: Substantial safety issue Red: High safety issue NRC Inspection Efforts Green: Only Baseline Inspections White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other NRC actions

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance L cen si R espn o

R egto eR esp n

o la u ry e

eD ed d

ra g

e to rn o

C es n

ltiu M p a sto g

eD rn o

C le/R .U ed n r P c lep a

n erfo c n

a b

ta rm c

Cornerstone z Increasing Safety Significance z Increasing NRC Inspection Efforts z Increasing NRC/Licensee Management Involvement z Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103

Surry CY 2005 Inspection Activities z 4900 hours0.0567 days <br />1.361 hours <br />0.0081 weeks <br />0.00186 months <br /> of inspection related activities z Radiation Protection inspections z Emergency Preparedness inspections z Problem Identification and Resolution inspection z Steam Generator Inservice inspections z Modifications inspection z Reactor Operator Requalification inspection z Refueling Outage related inspections z Independent Spent Fuel Storage Installation inspections

Surry CY 2005 Assessment Results z Surrys performance was within the Licensee Response Column of the NRCs Action Matrix z All inspection findings were classified as very low safety significance (Green) z All performance indicators were Green

Surry Assessment Summary z Virginia Electric and Power Co. operated Surry in a manner that preserved public health and safety z All cornerstone objectives were met z NRC plans baseline inspections at Surry for the remainder of CY 2006

Surry CY 2006 Scheduled Inspection Activities z Resident inspector baseline inspections z Radiation Protection inspections z Emergency Preparedness inspections z Steam Generator Inservice inspections z Triennial Fire Protection inspection z Reactor Operator Initial inspection z Component Design Bases inspection z Refueling Outage related inspections z Containment Sump inspection (TI 2515/166) z Independent Spent Fuel Storage Installation inspections

NRC CY 2005 Annual Assessment Meeting SURRY POWER STATION Surry, Virginia April 19, 2006

Contacting the NRC z Report an emergency 3/4 (301) 816-5100 (call collect) z Report a safety concern 3/4 (800) 695-7403 3/4 Allegation@nrc.gov z General information or questions 3/4 www.nrc.gov 3/4 Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process 3/4 http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room 3/4 http://www.nrc.gov/reading-rm.html z Public Document Room 3/4 1-800-397-4209 (Toll Free)

Surry Attendance List April 19, 2006 Licensee Personnel

  • J. Ashley, DOM
  • D. Jernigan, DOM
  • K. Sloane, DOM
  • M. Wilson, DOM
  • R. Simmons, DOM
  • R. Savedge, DOM
  • J. Costello, DOM
  • T. Steed, DOM
  • C. Luffman, DOM
  • J. Grau, DOM
  • W. Renz, DOM NRC Personnel
  • K. Landis, NRC
  • N. Garrett, NRC
  • D. Arnett, NRC
  • K. Lippard, NRC
  • S. Burnell, NRC