MONTHYEARML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23275A1712023-10-16016 October 2023 October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21333A1512021-11-29029 November 2021 Pre-Submittal Meeting Slides License Amendment Request Addressing Portable Lighting for Operator Manual Actions ML21179A0892021-07-13013 July 2021 Background Information July 13, 2021, Pre-Submittal Public Teleconference ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20308A7332020-11-18018 November 2020 Slides for GSI-191 Pre-Submittal Public Teleconference November 18, 2020 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides IR 05000482/20174072017-12-22022 December 2017 Summary of Closed Regulatory Conference to Discuss Wolf Creek, Unit 1, Security Inspection Report 05000482/2017407 ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16320A5232016-09-0707 September 2016 Pre-Submittal Meeting with Surry Power Station Regarding Carbon Fiber Reinforced Polymer Alternative Request ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML16095A0782016-04-12012 April 2016 Slides for the WCGS Meeting Discussion 4/12/16 ML16095A0852016-04-12012 April 2016 Large Scale Head Loss Test Specification 4/12/16 ML16095A0802016-04-12012 April 2016 Large Scale Penetration Test Specification 4/12/16 ML16095A0922016-03-31031 March 2016 Large Scale Penetration and Head Loss Test Plan 4/12/16 ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13218A0212013-08-0707 August 2013 Licensee Slides, 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13205A2142013-07-30030 July 2013 Operating Corporation - Slides for Pre-application Meeting on 7/30/13 - Core Design and Safety Analysis Methodology Transition License Amendment Request for Wolf Creek Generating Station ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12263A3622012-09-20020 September 2012 Pre-application Meeting Slide Core Design and Safety Analysis Methodology Transition License Amendment Request TAC No. ME9495) ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304302011-04-13013 April 2011 Public Meeting/Open House - Handouts ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1016901162010-06-16016 June 2010 6/16/2010 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Meeting Slides (Enforcement Cases) ML1016204902010-06-16016 June 2010 Notice of Construction Reactor Oversight Process Category 2 Public Meeting Handout: Wolf Creek 2, Notice of Violation and Proposed Imposition of Civil Penalty, Dated 11/21/1984 ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas 2023-04-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23275A1712023-10-16016 October 2023 October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21333A1512021-11-29029 November 2021 Pre-Submittal Meeting Slides License Amendment Request Addressing Portable Lighting for Operator Manual Actions ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20310A2232020-11-19019 November 2020 Slides for ERO Staffing pre-submittal Public Teleconference November 19, 2020 (L-2020-LRM-0104) ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19296D7862019-11-0606 November 2019 Dseis Slides for November 7, 2019 Public Meeting ML19248C7352019-09-0909 September 2019 CFR 50.69 License Amendment Request Pre-Submittal Meeting with NRC - September 9, 2019 ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides IR 05000482/20174072017-12-22022 December 2017 Summary of Closed Regulatory Conference to Discuss Wolf Creek, Unit 1, Security Inspection Report 05000482/2017407 ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16236A0972016-08-25025 August 2016 Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML16095A0782016-04-12012 April 2016 Slides for the WCGS Meeting Discussion 4/12/16 ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13219A1932013-08-0707 August 2013 Licensee Slides (Final), 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13218A0212013-08-0707 August 2013 Licensee Slides, 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13205A2142013-07-30030 July 2013 Operating Corporation - Slides for Pre-application Meeting on 7/30/13 - Core Design and Safety Analysis Methodology Transition License Amendment Request for Wolf Creek Generating Station ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML12263A3622012-09-20020 September 2012 Pre-application Meeting Slide Core Design and Safety Analysis Methodology Transition License Amendment Request TAC No. ME9495) ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML12129A2532012-05-0808 May 2012 EOC Poster Boards 2011 ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304092011-04-13013 April 2011 Annual Assessment Meeting Summary Slides ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1016901162010-06-16016 June 2010 6/16/2010 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Meeting Slides (Enforcement Cases) ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML1011005472010-04-20020 April 2010 NRC Strategic Plan Posters ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas 2023-04-14
[Table view] |
Text
RIC 2005 Session W-A3 Risk-Informing Special Treatment Requirements 10 CFR 50.69 --
Application Content Expectations Donnie Harrison USNRC, Senior Risk Analyst March 9, 2005
Rule Requirement 10 CFR 50.69(b)(2)
- An application for license amendment under §50.90
- Description of categorization process
- Description of measures taken to assure quality and level of detail for the processes that evaluate the plant for internal and external events during normal operation, low power, and shutdown (including plant-specific PRA and margins-type approaches, etc.) are adequate for categorization of SSCs
- Results of the PRA review process conducted to meet
§50.69(c)(1)(i)
- Description of, and basis for acceptability of, evaluations to be conducted to satisfy §50.69(c)(1)(iv). Evaluations shall include the effects of common cause interaction susceptibility, and the potential impacts from known degradation mechanisms for both active and passive functions, and addresses internally and externally initiated events and plant operating modes 2
10 CFR 50.69(b)(2)(i)
- Description of categorization process
- NEI 00-04, as endorsed by NRC, provides an acceptable categorization process
- Will need to identify and address deviations in plant-specific processes from those identified in NEI 00-04
- Use of a different process must provide a complete description of the categorization process
- Level of detail should be similar to that of NEI 00-04
- Will require more staff effort and an extended review schedule 3
10 CFR 50.69(b)(2)(ii)
- Description of measures taken to assure quality and level of detail for the processes that evaluate the plant for internal and external events during normal operation, low power, and shutdown (including plant-specific PRA and margins-type approaches, etc.) are adequate for categorization of SSCs
- Description of quality of plant-specific PRA
- Typical of any risk-informed licensing action
- Also must address quality of non-PRA approaches
- Scope, level of detail, and technical acceptability
- Realistically reflect the actual design, construction, operational practices, and operational experience of the plant 4
10 CFR 50.69(b)(2)(iii)
- Results of the PRA review process conducted to meet
§50.69(c)(1)(i)
- Summarize results/impacts of PRA peer review and self assessment findings per RG 1.200
- If a licensee uses an external events or shutdown PRA, for which no standards are currently endorsed, a peer review should be performed (similar to what was done for internal events PRAs prior to the ASME Standard) and the results/impacts summarized
- In NEI 00-04 process, the findings from the peer reviews and self assessments (e.g., key uncertainties that could impact categorization and those supporting level requirements that are not Capability Category II for internal events PRA) are to be addressed in the individual sensitivity studies 5
10 CFR 50.69(b)(2)(iv)
- Description of, and basis for acceptability of, evaluations to be conducted to satisfy §50.69(c)(1)(iv). Evaluations shall include the effects of common cause interaction susceptibility, and the potential impacts from known degradation mechanisms for both active and passive functions, and addresses internally and externally initiated events and plant operating modes
- Intent is to ensure that the categorization process results (i.e., small risk increase) are maintained throughout implementation of the rule
- PRA used to perform these evaluations (i.e., CDF and LERF)
- NEI 00-04 addresses non-PRA approaches by limiting the SSCs that can be made LSS
- To invalidate the categorization process results would require the creation of intersystem CCFs and/or degradation mechanisms resulting from reductions in treatment
- These types of impacts are typically not modeled in PRAs and are not understood well enough to establish a factor of reduction in reliability for the change in risk calculations
- It is expected that licensees will rely on other aspects of their implementation of the rule to control these impacts (e.g., inspection, testing, feedback, corrective action)
- Licensees will need to state this is how they are addressing intersystem CCF and degradation mechanisms (so they do not have to be quantitatively considered in the change in risk evaluations) 6
IMPLEMENTATION SCHEDULE
- Expect interactions on NEI 00-04 implementation guidance to continue in 2005
- Pilots from Wolf Creek and Surry may support determination of details needed to support any future §50.69 submittals
- Submittal pilots may be useful in developing a submittal template that could be included in a revision to NEI 00-04 as Appendix C 7
CONCLUDING THOUGHTS
- The staff will perform a process review to ensure that all the required elements of the process are in place and that the licensees analysis capability is adequate for this process (i.e., quality of PRA and non-PRA methods used in evaluations)
- The submittal does not need to include any specific categorization results or implementation schedule, but will need to identify the evaluation methods (e.g., fire PRA versus FIVE) that will be used
- NEI 00-04 approach is consistent with the PRA quality phases action plan and may be qualified as a Phase 2 application 8