Category:Meeting Briefing Package/Handouts
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML18227B3212018-09-0505 September 2018 Tornado License Amendment Pre-Application Meeting Slides ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15343A1142015-12-0808 December 2015 NRC Questions to Duke Energy Regarding Cable Testing in Support of Public Meeting on 12/15/15 ML15321A1782015-11-17017 November 2015 Presentation Material in Support of November 18, 2015 Pre-Application Meeting Between NRC and Duke 50.55a(z) Alternative to Code and Standards Requirements ML15286A0762015-10-13013 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement. (Revised) ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14058A0482014-02-0404 February 2014 NRR Briefing on Oconee Flood Protection (Nrr/Dra) ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13099A4472013-04-10010 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection ML13095A2132013-04-0909 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation ML13123A2042013-03-25025 March 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Concerning the Flooding Hazard Reevaluation Report ML13064A1022013-03-0505 March 2013 Slides from Predecisional Enforcement Conference with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Apparent Violation of a License Condition on Fire Protection ML13056A1042013-02-0606 February 2013 Briefing Slides on the Fliod Scenario Rupture of Jocassee Dam ML13056A1032013-02-0606 February 2013 Briefing on Draft Information Notice - Potential Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments. ML13056A1022013-02-0606 February 2013 Meeting Slides on Oconee Flood Issue Jocassee Dam Failure Frequency ML13056A0992013-02-0606 February 2013 Meeting Slides on Oconee Ssf Flood Barrier Breach Sdsp - Lessons Learned ML13052A7822013-02-0606 February 2013 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML13035A2442013-01-30030 January 2013 Projects Meeting - NRC Slides ML13035A2332013-01-30030 January 2013 Projects Meeting - Licensee'S Public Meeting Slides 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23087A2972023-04-17017 April 2023 Annual Assessment Meeting Presentation ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22075A2012022-03-0707 March 2022 Duke 03/07/2022 Presentation - Bolting Integrity ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22301A1672022-02-0505 February 2022 Presentation 5 - Oconee Trip and Notification of Unusual Event on February 5, 2022 ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML21034A5552021-01-26026 January 2021 SLRA - NRC Presubmittal Meeting Slides ML21034A5562021-01-26026 January 2021 SLRA - Duke Presubmittal Meeting Slides ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20134J0052020-05-13013 May 2020 EOC Slides (2) ML20125A2312020-05-0404 May 2020 EOC Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17296A1462017-10-24024 October 2017 Duke Energy Presentation to CRGR - Oconee Nuclear Station ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0512014-02-0404 February 2014 Slides on Oconee Nuclear Station - Standby Shutdown Facility (Ssf) Flood Barrier Breach Violation SDP Assessment ML14058A0352014-02-0404 February 2014 Meeting Slides on Oconee Flood Protection and the 10 CFR 50.54(f) Response ML14055A4102014-02-0404 February 2014 Meeting Slides on Standby Shutdown Facility Flood Barrier Breach Violation Informal Reassessment ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13226A2662013-05-0303 May 2013 E-mail from J. Boska, NRR to S. Hicks, Ois FW: Change in Public Availability of Slide Package ML13226A2592013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Non-Security Sensitive Version of March 25th Presentation ML13226A2652013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Security Sensitive Version ML13099A4472013-04-10010 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection 2023-04-17
[Table view] |
Text
P Duke Duke Energy Oconee Nuclear Station HELB/Tomado Mitigation Strategies Meeting NRR Offices Rockville, MD July 26, 2006, 10:00 a.m. - 12:30 p.m.
1 Enclosure 2
Duke Energy,. Duke Attendees Larry Nicholson Rich Freudenberger Graham Davenport
- Jim Sumpter
- Jeff Robertson
- Allen Park Tim Brown Lee Kanipe Steve Newman Keith Graham 2
POEnergy.
Duke Agenda Opening Remarks c Duke Responses to NRC Items from the July 12, 2006 HELB / Tornado Strategies Letter.
Enclosure 1 Discussion Closing Remarks 3
kDuke Opening Remarks 4
4
Duke Item 1: Use of TORMIS
- Conditions outlined in the October 26, 1983 TORMIS methodology
- Atmospheric Dump Valves (ADVs) access
" Duke concurs that TORMIS must collectively assess probability of damage on a function basis
" Criteria for physical separation
" Planned modifications 5
Physical Separation In resolution of Systematic Evaluation Program (SEP) ISSUE 156.1.5, the NRC acknowledged that there was no guidance relative to missile protection prior to 1972.
Physical separation was approved by the NRC as part of the Oconee SER (Unit 1, Section 6.2, page 34, last paragraph).
Physical separation was outlined as an acceptable approach in NUREG-75/087 (Standard Review Plan)
Section 3.5.2, "SSCs to be Protected from Externally Generated Missiles", Item III, next to last paragraph, dated 11-24-75.
Intended Use of TORMIS.
October 26, 1983 TORMIS Methodology SER indicates TORMIS to be used to offset large expenditures.
November 7, 1983 NRC memo from Denton to Stello tied use of PRA for tornado missile analysis to function (Oconee effort cited in first paragraph):
Based on the guidance In SRP Sections 3.5.1.4 and 2.2.3, we plan to permitapplicants and licensees to use risk assessments for tomado and otherhiph wind missiles and to judge theiracceptabilityagainsta numerical criterion which is as follows: The probabilityof significantdamage to SSCs requiredto prevent a releaseof radioactivityIn excess of 10CFR Part 100 following a missile strike, assuming loss of offsite power,shall be less than or equal to a median value of E-7peryearora mean value of E-6 peryear. Significant damage is damage that would prevent meeting the design basis function....
Applied to ONS secondary heat removal function In post-TMI EFW ONS SER dated July 28,1989.
Applicability of TORMIS Methodoloov to ONS.
SEP NRC GL 95-04, 4/28/95, ISSUE 156.1.5: TORNADO MISSILES:
This issue is one of the nineteen Category3 issues identifiedby NRR in SECY-90-343. All plants licensed after 1972 were designedfor protection againsttornadoes. The concern existed,however, that plants constructedpriorto 1972 may not be adequatelyprotected,in particular,those reviewed before 1968 when criteria on tornadoprotection were first developed ..... Thus, the staff beieves that any vulnerability associatedwith tornado missiles will be evaluated and reportedin the IPEEEsubmittals.
ONS was one of the 41 plants.
IPEEE dispositioned missiles using TORMIS. NRC issued SER for ONS IPEEE on March 15, 2000. There were no outstanding Issues other than protection of emergency response personnel.
Also used to address post-TMI EFW tornado issue. NRC issued SER on July 28, 1989.
5
Duke Item 2: Cold Shutdown
maintain hot standby for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
- Initiate plant cooldown to -250 degrees F
- Cold shutdown following damage repair
- Systems
- Vulnerabilities
" Human Factors Assessment
- Time critical actions will be in EOPs
- CSD is not time critical
- Damage repair guidelines
- Time to achieve CSD will be based on damage assessment and repair 6
6
Duke Item 3: Technical Specifications
- Incorporation of new PSW system LCOs and AOTs should and will be included in a controlled regulatory document
" PSW to be incorporated into SLC manual (a.k.a. TRM)
- New PSW system does not meet the 10 CFR 50.36 criteria
- New PSW system and functions not in NUREG 1430
- Preliminary PRA results - medium risk system
- LCO and AOT times to be determined using PRA analysis
" Maintenance Rule criteria will ensure that stringent controls for system availability for all tornado and HELB mitigating systems are met.
7 7
Duke Energy,, Item 5: Application of GL 87-11
- Duke will fully apply criteria for intermediate pipe ruptures per GL 87-11
- Duke will utilize the following MEB 3-1 criteria:
- No Class 1 piping outside containment
- Will apply to postulated pipe breaks and critical cracks in all seismically analyzed lines
- For leakage cracks:
- Auxiliary Building - will be postulated
- Turbine Building - will not be postulated
- Moderate energy cracks will not be postulated
- Circumferential and longitudinal breaks and crack orientations will be adopted 8
The power piping code of record at Oconee is the USAS 831.1 code.
8
Duke Item 4: Reactor Coolant System Energy. Letdown Line
" For HELB: Evaluation approach
- Probability of break is low
- Relocation of pressure reducing orifice impractical
- Validation of results of original HELB report
- Critical cracks (will use MEB 3-1 criteria)
" For Tornado: Missile damage resulting in concurrent LOCA is not credible based on physical construction and configuration 9
HELB The Safety Evaluation Report (SER) for Units 2&3 (dated 7/6173) approved the original HELB report and noted that protection was to be provided for fluid piping systems that exceeded 200 degrees F and 275 psig. The letdown line at the containment penetration is at 120 degrees F and 2160 psig and thus is not technically a high energy line. The SER acknowledged the following: "The reactor coolant letdown is cooled before leaving the reactor building so this system is essentially a high pressure system rather than a high pressure and high temperature system."
Credible Tornado Threshold for Later Plants Around 1E-7 Staff objective outlined in SRP Section 2.2.3, Rev. 2.
Endorsed in ANSI/ANS 51.1-1983: Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants 9
SDuke Item 6: Protection of Electrical Energy, Penetrations Electrical penetration enclosures housing circuits necessary for safe shutdown (SSD) will be protected from jet impingement and spray:
- East Penetration Room - jet impingement and spray
- West Penetrations Room - jet impingement only
- Other enclosures housing circuits in the East Penetration Room, whose failure or inadvertent operation due to spray could impact SSD capability, will be protected from spray.
10 10
P Duke Closing Remarks 11 11