Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML032760003 | 3 October 2003 | Facsimile Transmissions Supporting Conference Calls | Boric Acid VT-2 |
ML033070125 | 3 November 2003 | Stations, Units 1 and 2 Facsimile Transmission of Issues to Be Discussed in a Conference Call | |
ML033100154 | 7 November 2003 | Letter to Christopher W. Becker Approval of Immobilization Time Requirement of 10 CFR 73.37(c)(4) | |
ML040140558 | 14 January 2004 | Forthcoming Meeting with Virginia Electric and Power Company (VEPCO) and Framatome | |
ML040410422 | 4 February 2004 | Request Approval of Excused Absence for Employees Affected by Inclement Weather Conditions | |
ML040480019 | 17 February 2004 | Transmission of Issues to Be Discussed in Conference Call | Boric Acid VT-2 Incorporated by reference Scaffolding |
ML040620415 | 2 March 2004 | Memo, Facsimile Transmission on Request for Additional Information on Proposed Technical Specification Change to Implement Alternate Source Term | |
ML041040866 | 13 April 2004 | Facsimile Transmission of Request for Additional Information on Proposed on Proposed Technical Specification Change to Implement Alternate Source Term | |
ML041400007 | 17 May 2004 | Memo, Units 1 and 2, Fax Transmission of Request for Additional Information on Proposed Technical Specification Changes to Implement Alternate Source Term | |
ML042100332 | 30 June 2004 | Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements | |
ML043480242 | 29 December 2004 | November Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML050120261 | 12 January 2005 | December Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML050550083 | 24 February 2005 | Facsimile Transmission Draft RAI (TAC MC4414, MC4415, MC4415, MC4417, MC4418. MC4419 and MC4420) | |
ML050630070 | 2 March 2005 | January Monthly Report on the Status of Open TIAs Assigned to NRR | |
ML050700411 | 10 March 2005 | RAI on TS Amendment Nos. MC4410, MC4413, MC4745, MC4746 and MC4747 | |
ML050900290 | 14 April 2005 | Notice of Meeting Between NRC Staff, Pacific Northwest National Laboratory Staff, and Industry Representatives on Non-Destructive and Destructive Examinations of Nozzles Salvaged from the Discarded North Anna 2 Vessel Head | |
ML052520245 | 22 September 2005 | Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors | Severe Accident Management Guideline |
ML052560628 | 13 September 2005 | Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 | |
ML060270090 | 27 January 2006 | Forthcoming Meeting with Virginia Electric and Power Co. and Westinghouse to Discuss License Amendments to Increase the Lead Rod Average Burnup Limit to 62,000 Mwd/Mt at Surry Power Station, Unit 1 | |
ML060590273 | 12 September 2006 | Letter, Response to TIA 2004-04, Acceptance of Proceduralized Departures from Tss. (TAC Mc 4331 and TAC MC4332) | Ultimate heat sink Internal Flooding Severe Accident Management Guideline Earthquake |
ML061720366 | 6 July 2006 | Trip Report - September 19-22, 2005, Tour of the North Anna River, Lake Anna, and the Surry Alternative Site | |
ML061780559 | 10 July 2006 | Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. | |
ML062550577 | 7 September 2006 | Memo. E-Mail Transmission of Request for Additional Information | |
ML062920444 | 26 October 2006 | Safety Evaluation Input for North Anna License Amendment to Adopt TSTF-374 as Part of the Consolidated Line Item Improvement Process (CLIIP) | |
ML063260512 | 22 November 2006 | Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 | |
ML071840152 | 3 July 2007 | Special Inspection Team Charter | |
ML072120543 | 9 August 2007 | Draft Open Items from Staff Audit of Corrective Actions to Address GL 2004-02 | Coatings |
ML073030405 | 31 October 2007 | E. Marinos Memo Technical Assistance Request-Dominion Resources, Inc.'S December 6, 2006, Request for Exemption from 10 CFR 74.13(a) Requirements Regarding Material Status Report Submittal Time Frame | Exemption Request |
ML073100167 | 15 November 2007 | Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 | |
ML080740084 | 14 March 2008 | Draft Regulatory Guide for Comment | |
ML083570453 | 19 February 2002 | Application for Renewal of Operating Licenses at North Anna and Surry Power Stations | Aging Management |
ML091560555 | 8 June 2009 | Notice of Meeting with Virginia Electric and Power Co. (Dominion) to Discuss a Proposed License Amendment Regarding the Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System | |
ML092540460 | 10 September 2009 | Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ | |
ML093340028 | 4 November 2009 | 2009 Surry FEMA Exercise Report Letter | |
ML101730481 | 22 June 2010 | Forthcoming Meeting with Virginia Electric and Power Company (Vepco), Regarding North Anna Power Station, Unit Nos. 1 and 2 to Discuss Fuel Transition Licensing Approach, Schedule of Submittals, Alignment of Resources and Key Deliverables | |
ML102310015 | 18 August 2010 | Notice of Meeting with Virginia Electric & Power to Discuss Proposed Addition of Analytical Methodology to Core Operating Limits Report | |
ML102780072 | 4 October 2010 | Special Inspection Charter | |
ML11171A702 | 29 June 2011 | Final Response to TIA 2011-003, Nine Mile Point Nuclear Station Unit 1 Licensing Basis for Degraded Grid Relay Time Delays | Anticipated operational occurrence |
ML11249A156 | 7 September 2011 | Notice of Forthcoming Meeting with Virginia Electric and Power Company (Vepco), on the August 23, 2011 Earthquake Near the North Anna Power Station, Unit Nos. 1 and 2 | Earthquake |
ML11271A178 | 3 October 2011 | Review of Topical Report, Revision 11 for Kewaunee Power Station and ISFSI, Millstone Power Station, Units 1, 2, & 3 and ISFSI, North Anna Power Station, Units 1 & 2 and ISFSI, Surry Power Station, Units 1 & 2 and ISFSI (Tac ME6649, ME6650, | |
ML11277A029 | 4 October 2011 | Summary Audit Report of North Anna Post-Seismic Fuel Inspections | Design basis earthquake Earthquake |
ML12005A030 | 30 August 2011 | Letter from V. Mccree, Region II to M. Franke, Region II; Augmented Inspection Charter to Evaluate Total Loss of Offsite Power, Dual Unit Reactor Trips and Plant Equipment Issues Following a Seismic Event at North Anna | Safe Shutdown Earthquake Reserve Station Service Transformer Operating Basis Earthquake Significance Determination Process Earthquake |
ML12053A408 | 15 September 2011 | Email from M. Khanna, NRR to K. Karwoski, NRR Et Al. on North Anna Seismic Issue Restart Action Plan Draft Final.Docx | Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML12054A145 | 19 September 2011 | Email from G. Thomas, NRR to D. Hoang, NRR Et Al. FW: North Anna Seismic Report - Summary Report of August 23/2011 Earthquake Response and Restart Readiness Determination Plan North Anna Power Station Units 1 and 2 and ISFSI | Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML120660070 | 6 March 2012 | 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry | |
ML120870428 | 26 March 2012 | Memo C Bladey, Adm, Notice of EA and Fonsi - VEPCO, North Anna Power Station (72-1030, 50-338, 50-339, 72-56) | |
ML120870528 | 26 March 2012 | Memo C Bladey, Adm, Notice of EA and Fonsi - VEPCO, Surry Power Station (72-1030, 72-55, 50-280, 50-281) | |
ML12087A350 | 27 March 2012 | Surrey Power Station, Units 1 and 2 - Safety Evaluation Regarding License Amendment Request - Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair | Probabilistic Risk Assessment Finite Element Analysis |
ML12277A072 | 20 September 2012 | Initial Exam 2012-301 Post Exam Comments - Addendum | High Radiation Area |
ML13127A368 | 13 March 2012 | Memo from M. Case to P. Hiland, Subject: Review of Draft Nureg/Cr - Xxxx Entitled, Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Vali | Boric Acid Nondestructive Examination Liquid penetrant |