Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0505500832005-02-24024 February 2005 Facsimile Transmission Draft RAI (TAC MC4414, MC4415, MC4415, MC4417, MC4418. MC4419 and MC4420) Project stage: Draft RAI ML0524903372005-09-0909 September 2005 Approval of Dominion Nuclear Connecticut and Virginia Electric and Power Company Quality Assurance Program Description Topical Report for Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2 Project stage: Other 2005-02-24
[Table View] |
Facsimile Transmission Draft RAI (TAC MC4414, MC4415, MC4415, MC4417, MC4418. MC4419 and MC4420)ML050550083 |
Person / Time |
---|
Site: |
Millstone, Surry, North Anna |
---|
Issue date: |
02/24/2005 |
---|
From: |
Nerses V NRC/NRR/DLPM/LPD1 |
---|
To: |
Darrell Roberts NRC/NRR/DLPM/LPD1 |
---|
Nerses V, NRR//DLPM, 415-1484 |
References |
---|
TAC MC4414, TAC MC4415, TAC MC4416, TAC MC4417, TAC MC4418, TAC MC4419, TAC MC4420 |
Download: ML050550083 (4) |
|
|
---|
Category:Memoranda
MONTHYEARML24222A6992024-08-16016 August 2024 August 6, 2024, Summary of Regarding Potential License Amendment Request Change to Surveillance Requirements for Moderator Temperature Coefficient for Millstone, Unit No. 3, North Anna, Unit Nos. 1 and 2, and Summer, Unit No. 1 - ML24089A0632024-03-29029 March 2024 Memorandum from the Secretary Referring Hearing Request to the Atomic Safety and Licensing Board Panel ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22255A1862022-10-0303 October 2022 Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML22028A3502022-01-21021 January 2022 Green Mountain Power, 2021 Annual Summary of Special Nuclear Committee ML21293A0992021-12-10010 December 2021 Meeting Summary for Draft Supplemental Environmental Impact Statement Public Meeting ML21221A3012021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21239A0642021-09-0202 September 2021 August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - Memo ML21236A0512021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21221A0262021-08-26026 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21067A0922021-04-20020 April 2021 Documentation of Decision by NRC Staff That EPRI Report 3002012988, Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, Meets Criteria for a Federal Record ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20350B4562020-12-17017 December 2020 Summary of the Historic and Cultural Resources Environmental Audit Meeting Related to the Review of the Subsequent License Renewal Application for the North Anna Power Station, Units 1 and 2 ML20176A5632020-06-24024 June 2020 Reconciliation - Analysis for April 30, 2020 Surry, Units 1 and 2 for NRR Response, Subsequent License Renewal Letter ML20161A1922020-06-15015 June 2020 SLRA - Delay in Issuance of Surry Subsequent Renewed Licenses ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML19304C1462019-11-20020 November 2019 Correction to Summary of August 13, 2019 Category 2 Public Meeting Related to the Safety Review of the Surry Power Station Units 1 and 2 SLRA ML19283B6222019-10-10010 October 2019 Subsequent License Renewal Application Safety Review - Documentation of Draft Third Round Requests for Additional Information ML19253D7082019-09-24024 September 2019 Summary of August 13, 2019, Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19253A7002019-09-0606 September 2019 (FEMA Letter to NRC 09-06-19) Preliminary Capabilities Assessment (PCA) for the Surry Power Station ML19219A2842019-08-13013 August 2019 July 29, 2019, Summary of Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19190A2862019-07-16016 July 2019 Summary of July 7, 2019, Public Meeting with Dominion to Discuss Open Phase Condition RAI Responses ML19165A1122019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted ML19165A1192019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted ML19128A3432019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML19128A3372019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding Surry Power Station Docket Nos. 50-280 and 50-281 ML18151A4682018-05-29029 May 2018 Public Meeting Summary - 2017 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18144A0712018-05-23023 May 2018 Summary of Annual Assessment Public Meeting Regarding Surry Power Station ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application ML18057A2752018-03-0101 March 2018 February 7, 2018, Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry Power Station, Units 1 and 2 Subsequent Renewal Application ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17209A7652017-08-0303 August 2017 Fire Protection Input for Millstone Power Station Unit 2 Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability, for Use of Operator Manual Actions ML17137A0932017-05-17017 May 2017 Request for Additional Information, Alternative to Reactor Vessel Threads in Flange Examination Requirements ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML17123A1162017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the Surry Power Station, Units 1 and 2 with the Public for Period of January 01, 2016 Through December 31, 2016 ML16215A0752016-08-24024 August 2016 North Anna Power Station - Audit Report for Proposed License Amendment to Revise the Technical Specifications to Address the Issue Identified in Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I ML16209A4132016-07-27027 July 2016 Safety Evaluation For North Anna Power Station, Units 1 And 2, Proposed License Amendment To Revise The Technical Specifications To Address The Issue Identified In Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I (TAC No. MF7186 and MF7187) ML16139A5892016-05-23023 May 2016 North Anna Trip Report, April 11, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16098A5302016-04-14014 April 2016 Audit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1 ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants 2024-08-16
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23073A1802023-03-14014 March 2023 Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements 2024-07-31
[Table view] |
Text
February 24, 2005 MEMORANDUM TO: Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Senior Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NOS. 1, 2 AND 3; NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2; SURRY POWER STATION, UNIT NOS. 1 AND 2 FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4414, MC4415, MC4416, MC4417, MC4418, MC4419 AND MC4420)
The attached draft request for additional information (RAI) was transmitted by facsimile on February 24, 2005, to Mr. Paul. Willoughby, Dominion Nuclear Connecticut, Inc. (DNC).
This draft RAI was transmitted to facilitate the technical review being conducted by the NRC staff and to support a conference call with Virginia Electric and Power Company (VEPCO) and DNC in order to clarify certain items in the licensees submittal. This draft RAI is related to VEPCOs and DNCs combined submittal dated August 24, 2004, regarding a request for approval of the Nuclear Facility Quality Assurance Program Description (Topical Report DOM-AQ-1). Review of the RAI would allow VEPCO and DNC to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.
Docket No. 50-280, 50-281, 50-338, 50-339, 50-245, 50-336 and 50-423
Enclosure:
Draft Request for Additional Information
February 24, 2005 MEMORANDUM TO: Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Senior Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
MILLSTONE POWER STATION, UNIT NOS. 1, 2 AND 3; NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2; SURRY POWER STATION, UNIT NOS. 1 AND 2 FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4414, MC4415, MC4416, MC4417, MC4418, MC4419 AND MC4420)
The attached draft request for additional information (RAI) was transmitted by facsimile on February 24, 2005, to Mr. Paul. Willoughby, Dominion Nuclear Connecticut, Inc. (DNC).
This draft RAI was transmitted to facilitate the technical review being conducted by the NRC staff and to support a conference call with Virginia Electric and Power Company (VEPCO) and DNC in order to clarify certain items in the licensees submittal. This draft RAI is related to VEPCOs and DNCs combined submittal dated August 24, 2004, regarding a request for approval of the Nuclear Facility Quality Assurance Program Description (Topical Report DOM-AQ-1). Review of the RAI would allow VEPCO and DNC to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey a formal request for information or represent an NRC staff position.
Docket No. 50-280, 50-281, 50-338, 50-339, 50-245, 50-336 and 50-423
Enclosure:
Draft Request for Additional Information DISTRIBUTION PUBLIC DRoberts PKrohn, RGN-I DTrimble PDI-2 Reading KKavanagh KHeck VNerses JPearson ACCESSION NO.: ML050550083 OFFICE PDI-2/PM PD2-I/PM PDI-2/SC IPSB/SC PDI-2/SC NAME VNerses SMonarque GWunder DThatcher DRoberts DATE 2/23/05 2/22/05 2/23/05 2/18/05 2/23/05 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION MILLSTONE POWER STATION, UNIT NOS 1, 2 AND 3 NORTH ANNA POWER STATION, UNIT NOS 1 AND 2 SURRY POWER STATION, UNIT NOS 1 AND 2 DOCKET NOS 50-280, 50-281, 50-338, 50-339, 50-245, 50-336 AND 50-423 By letter dated August 24, 2004, Virginia Electric and Power Company (VEPCO) and Dominion Nuclear Connecticut, Inc. (DNC) submitted a combined request for approval of the Nuclear Facility Quality Assurance Program Description (NFQAPD) (Topical Report DOM-AQ-1). In the following, VEPCO and DNC together shall be referred to as licensee. The NRC has developed the following draft questions during its review of the letter:
General
- 1. Provide a matrix that describes the migration of each unit/facility current quality assurance commitments to the proposed commitments for each unit/facility. The matrix should state whether each commitment is a non-reduction, reduction, or an increase in commitment.
Provide justification for all reductions in commitments. Also provide references to any safety evaluation precedents used to change existing commitments. Demonstrate that these precedents are applicable to the licensees facilities. to NFQAPD provides the proposed NFQAPD for the licensees facilities.
- 1. Section 11.2, test procedures, states the prerequisites are normally completed prior to commencement of the test. How do you ensure the item is ready for testing if the prerequisites are not completed? What is the basis for this statement?
- 2. Section 13.3 provides the quality standards commitment and provides alternatives for Subpart 2.2 and subpart 2.15. What are the bases for these proposed alternatives?
- 3. Section 17.2, records of activities, states that the records and their retention times are based on Regulatory Position C.2, Table 1, of NRC Regulatory Guide 1.28. The applicable revision number, i.e., Rev. 3, should be used to be consistent with the remainder of the NFQAPD. to NFQAPD provides a discussion of changes to the current Quality Assurance (QA) program for Millstone, North Anna and Surry.
- 1. In attachment 2, an evaluation of alternatives to committed standards is provided.
Specifically, pages 5 and 6 discuss commitments to ANS-3.1 (draft 12/79) and alternatives to ANS-3.1-1993. Since the proposed NFQAPD is adopting NQA-1-1994 and ANS-3.1-1994, in part, it is not clear why the licensee has chosen to maintain its commitment to ANS-3.1 (draft
12/79). Although approved as part of the licensing basis for North Anna and Surry, the draft 12/79 ANS-3.1 standard was not endorsed by the NRC staff. Provide a discussion as to why you are is maintaining your commitment to ANS-3.1 (draft 12/79) for North Anna and Surry and why ANS-3.1 (draft 12/79) is applicable to Millstone (as it appears to be in this section).
- 2. In attachment 2, page 8 describes an alternative to NQA-1-1994 Appendix 2A-1 regarding the use of Level I, II, and III for qualification of inspectors. As proposed, the alternative does not provide an adequate description of the education and experience requirements for those individuals performing quality control verification. Provide further description of what is meant by the qualification program will ensure that only personnel that meet the education and experience requirements, and have demonstrated appropriate capabilities in the inspection and test activities they are assigned will be certified and used to perform those inspections (page 13 of proposed NFQAPD). How does the proposed alternative meet the requirements of 10 CFR 50 Appendix B, Section II(Quality Assurance Program)?
- 3. In attachment 2, page 8 describes an alternative to NQA-1-1994 Appendix 2A-1. The alternative to the education requirement of a high school graduation is proposed to be satisfactory demonstration of reading, writing, and mathematical skills through completion of an NANT accredited training development program or an approved inspector training program for nuclear facility personnel. Provide the justification for this proposed alternative. Specifically, how is the proposed alternative equivalent to the education and experience qualifications described in section 3.1 of NQA-1-1994 Appendix 2A-1 for Level I inspectors and test personnel? to NFQAPD contains the ANSI N45.2 requirements that are addressed by NQA-1-1994 standards and/or the new QA topical report.
- 1. ANSI N45.2.12 section 4.3.2.7 states that specific attention should be given to corrective action on program deficiencies identified during previous audits. In the comments section of page 21 of 22 (Audits), it states that this requirement is not addressed in NQA-1 and that corrective action is an element evaluated in each audit as stated in the NFQAPD, Appendix C.
Neither the NFQAPD or Appendix C of the NFQAPD address this requirement. Provide an explanation as to how this requirement is met in the proposed NFQAPD. to NFQAPD contains the ANSI N18.7 requirements that are addressed by NQA-1-1994 standards and/or the new QA topical report.
- 1. ANSI N18.7 section 2.2 Glossary of Terms contains the following terms: operational phase, surveillance testing, and system. Attachment 4 states that these definitions are contained in the NFQAPD, Appendix D. However, Appendix D does not contain these definitions.
- 2. ANSI N18.7 Section 5.2.2 Procedure Adherence discusses temporary changes which do not change the intent of the approved procedure. Attachment 4 states that this information is located in NFQAPD Section 6. However, Section 6 does not discuss temporary changes to approved procedures. Specify where this information is located.
- 3. ANSI N18.7 section 5.2.9 discusses plant security and visitor control. Attachment 4 states that administrative controls are established through the security measures required by regulation (10 CFR 73) and NRC orders. These regulatory requirements have superceded the requirements of ANSI N18.7. However, NFQAPD section 5.4 item (3) is a restatement of ANSI N18.7 section 5.2.9. If the requirements of ANSI N18.7 are superceded, why are they listed in NFQAPD section 5.4?
North Anna and Surry
- 1. Section 17.2.1.2 D.3.c describes the function of the Manager Nuclear Engineering. Where is this function located in the proposed NFQAPD?
Millstone
- 1. Section 1.3.9 of the current Millstone QA Program states that Unit No. 2 Nuclear Operations is responsible for operations regarding the Millstone Power Station, Unit No. 1 Spent Fuel Pool Island and auxiliary systems. Section 1.2.3.a of the proposed NFQAPD states that the staff for operating units may be responsible for activities related to a decommissioned units spent fuel pool and auxiliary systems,... The proposed NFQAPD is no longer specific as to who is responsible for Millstone Power Station, Unit No. 1 and it could be assumed that operators at other operating facilities may have that responsibility. In addition, no basis for the change for the change was provided. Provided the basis for the change and justification for the applicability to the North Anna and Surry facilities.
- 2. Section 1.3.13 of the current Millstone QA Program list the radiological protection responsibilities which includes maintaining records and reports on radioactive contamination levels. This responsibility is not listed in section 1.2.3.2.b of the proposed NFQAPD. Since 1.2.3.2.b is the same wording as section 1.3.13, explain why this responsibility is no longer listed.
- 3. Section 2.1 of the current Millstone QA Program states that the QAP applies to other quality programs including Anticipated Transient Without Scram (ATWS) Quality Assurance that is applicable to Millstone Power Station, Unit No. 2 only.... and to Electrical Equipment Qualification (EEQ), as defined by company commitments. Basic Requirement 2 of NQA-1-1994 states that the program shall identify the activities and items to which it applies.
However, section 2.2 of the proposed NFQAPD does not list the above programs as being applicable. Specify the current commitments with regards to ATWS Quality Assurance and EEQ.