RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 5 November 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Met Tower Deep Dose Equivalent Fuel cladding |
RS-03-215, Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters | 7 November 2003 | Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters | |
RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | 14 November 2003 | Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | |
RS-03-228, Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion Time | 5 December 2003 | Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion Time | High winds Probabilistic Risk Assessment Job Performance Measure Large early release frequency |
RS-03-240, Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | 30 December 2003 | Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | High winds |
RS-04-001, Licensed Thermal Power Limit Verification | 13 May 2004 | Licensed Thermal Power Limit Verification | Coast down |
RS-04-007, Sation, Units 1 and 2, Request for Additional Information Regarding License Amendment Request to Revise Pressurizer Safety Valves Lift Settings | 29 January 2004 | Sation, Units 1 and 2, Request for Additional Information Regarding License Amendment Request to Revise Pressurizer Safety Valves Lift Settings | |
RS-04-018, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order | 29 January 2004 | Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order | |
RS-04-026, Additional Information Regarding a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | 18 February 2004 | Additional Information Regarding a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | Fire Watch |
RS-04-033, Stations, Units 1 and 2 - Response to RAI Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings | 3 March 2004 | Stations, Units 1 and 2 - Response to RAI Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings | Loop seal |
RS-04-036, Fitness-for-Duty Performance Data Reports for Second Period of 2003 | 1 March 2004 | Fitness-for-Duty Performance Data Reports for Second Period of 2003 | Fitness for Duty |
RS-04-038, Answer to First Revised NRC Order (EA-03-009) to Modify Licenses Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head | 9 March 2004 | Answer to First Revised NRC Order (EA-03-009) to Modify Licenses Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head | |
RS-04-051, Annual Report of Emergency Core Cooling System Evaluation Model Changes & Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors. | 14 April 2004 | Annual Report of Emergency Core Cooling System Evaluation Model Changes & Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors. | |
RS-04-053, Request for Latest NRC Standardized Plant Analysis Risk (SPAR) Models for Exelon/Amergen Plants | 7 April 2004 | Request for Latest NRC Standardized Plant Analysis Risk (SPAR) Models for Exelon/Amergen Plants | Significance Determination Process |
RS-04-056, Request for Additional Information Regarding a Proposed License Amendment to Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation. | 9 April 2004 | Request for Additional Information Regarding a Proposed License Amendment to Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation. | Pressure Boundary Leakage |
RS-04-060, Response to Request for Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection | 16 April 2004 | Response to Request for Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection | |
RS-04-065, Request for Relief from ASME Section XI for Performance of Class 2 & 3 Raw Water Piping Repairs | 26 April 2004 | Request for Relief from ASME Section XI for Performance of Class 2 & 3 Raw Water Piping Repairs | Weld Overlay Hydrostatic Coatings Liquid penetrant |
RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 30 April 2004 | Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | |
RS-04-068, Unit I, Dresden Nuclear Power Station, Units 2 and 3, Supplemental Response to Issuance of Order to Modify License for Revised Design Basis Threat | 28 April 2004 | Unit I, Dresden Nuclear Power Station, Units 2 and 3, Supplemental Response to Issuance of Order to Modify License for Revised Design Basis Threat | Enforcement Discretion |
RS-04-072, Request for Additional Information Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings | 4 June 2004 | Request for Additional Information Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings | Loop seal |
RS-04-075, Request for a License Amendment to Incorporate Approved Pressure and Temperature Limits Report (PTLR) Methodology Into Technical Specifications | 21 May 2004 | Request for a License Amendment to Incorporate Approved Pressure and Temperature Limits Report (PTLR) Methodology Into Technical Specifications | Non-Destructive Examination Anticipated operational occurrence Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report |
RS-04-080, Response to Generic Letter 2003-01, Control Room Habitability, Integrated Control Room Envelope Unfiltered Inleakage Test Schedules | 19 March 2004 | Response to Generic Letter 2003-01, Control Room Habitability, Integrated Control Room Envelope Unfiltered Inleakage Test Schedules | |
RS-04-093, and Amergen, Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations. | 14 July 2004 | and Amergen, Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-04-100, Response to Request for Additional Information Regarding Bulletin 2003-01 | 15 July 2004 | Response to Request for Additional Information Regarding Bulletin 2003-01 | |
RS-04-108, Amergen Supplemental Response to Requests for Additional Information Related to Revised Physical Security Plans, Sections 1 - 19 | 23 July 2004 | Amergen Supplemental Response to Requests for Additional Information Related to Revised Physical Security Plans, Sections 1 - 19 | |
RS-04-109, Units 1 & 2 and Three Mile Island, Unit 1 - Initial Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized. | 27 July 2004 | Units 1 & 2 and Three Mile Island, Unit 1 - Initial Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized. | Boric Acid Weld Overlay Nondestructive Examination VT-2 Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
RS-04-112, Response to Request for Additional Information Related to Revised Training and Qualification Plans | 23 July 2004 | Response to Request for Additional Information Related to Revised Training and Qualification Plans | |
RS-04-118, and Amergen, Revised Responses to Requests for Additional Information Related to Revised Physical Security Plans Sections 1 - 19 and Appendix B | 4 August 2004 | and Amergen, Revised Responses to Requests for Additional Information Related to Revised Physical Security Plans Sections 1 - 19 and Appendix B | |
RS-04-119, (Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans | 12 August 2004 | (Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans | |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | Safe Shutdown Unanalyzed Condition |
RS-04-138, Submittal of Revised Physical Security Plans | 9 September 2004 | Submittal of Revised Physical Security Plans | |
RS-04-141, Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process | 15 September 2004 | Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Qualified Offsite Circuit Incorporated by reference Pressure and Temperature Limits Report Offsite Circuit |
RS-04-148, Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels | 1 October 2004 | Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels | |
RS-04-149, Exelon/Amergen Notification of Deferral of the Commitment to Submit License Amendment Request Incorporating Requirement for Control Room Envelope Integrity Program Into Technical Specifications | 30 September 2004 | Exelon/Amergen Notification of Deferral of the Commitment to Submit License Amendment Request Incorporating Requirement for Control Room Envelope Integrity Program Into Technical Specifications | |
RS-04-156, Submittal of Revised Physical Security Plans | 14 October 2004 | Submittal of Revised Physical Security Plans | |
RS-04-157, Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License | 17 December 2004 | Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License | Biofouling |
RS-04-159, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections. | 29 October 2004 | Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections. | Nondestructive Examination |
RS-04-160, Request for Amendment to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | 21 October 2004 | Request for Amendment to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | Reactor Vessel Water Level Offsite Dose Calculation Manual Incorporated by reference Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
RS-04-161, Submittal of Revised Physical Security Plans | 21 October 2004 | Submittal of Revised Physical Security Plans | |
RS-04-177, Response to Request for Additional Information - Exemption from 10CFR20.1703 and 10CFR20 Appendix a Use of Delta Protection French Designed Respiratory Protection Equipment | 7 December 2004 | Response to Request for Additional Information - Exemption from 10CFR20.1703 and 10CFR20 Appendix a Use of Delta Protection French Designed Respiratory Protection Equipment | |
RS-05-002, Confirmation of Implementation of NRC Orders EA-03-039 and EA-03-086 | 3 January 2004 | Confirmation of Implementation of NRC Orders EA-03-039 and EA-03-086 | |
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License | 25 February 2005 | Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License | Safe Shutdown Unanalyzed Condition Emergency Lighting Foreign Material Exclusion Scram Discharge Volume Safeguards Contingency Plan Control of Heavy Loads Fire Protection Program Power Uprate |
RS-05-021, Exelon/Amergen Response to NRC Generic Letter 04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 7 March 2005 | Exelon/Amergen Response to NRC Generic Letter 04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | |
RS-05-025, Application for Approval of License Transfers | 3 March 2005 | Application for Approval of License Transfers | Safe Shutdown Fire Protection Program |
RS-05-028, Commitment Change Notification: NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. | 23 March 2005 | Commitment Change Notification: NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. | |
RS-05-035, Report on Status of Decommissioning Funding for Reactors | 24 March 2005 | Report on Status of Decommissioning Funding for Reactors | |
RS-05-044, Exigent LAR | 11 April 2005 | Exigent LAR | Nondestructive Examination Finite Element Analysis |
RS-05-046, Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors. | 14 April 2005 | Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors. | |
RS-05-047, Supplement to Request for Exigent License Amendment Related to Technical Specification 5.5 .9, Steam Generator (SG) Tube Surveillance Program. | 14 April 2005 | Supplement to Request for Exigent License Amendment Related to Technical Specification 5.5 .9, Steam Generator (SG) Tube Surveillance Program. | |
RS-05-049, Answer to Issuance of Order Imposing Requirements for Protecting Certain Safeguards Information | 19 April 2005 | Answer to Issuance of Order Imposing Requirements for Protecting Certain Safeguards Information | |