Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure5 November 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureMet Tower
Deep Dose Equivalent
Fuel cladding
RS-03-215, Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters7 November 2003Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters
RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty14 November 2003Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty
RS-03-228, Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion Time5 December 2003Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion TimeHigh winds
Probabilistic Risk Assessment
Job Performance Measure
Large early release frequency
RS-03-240, Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time30 December 2003Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion TimeHigh winds
RS-04-001, Licensed Thermal Power Limit Verification13 May 2004Licensed Thermal Power Limit VerificationCoast down
RS-04-007, Sation, Units 1 and 2, Request for Additional Information Regarding License Amendment Request to Revise Pressurizer Safety Valves Lift Settings29 January 2004Sation, Units 1 and 2, Request for Additional Information Regarding License Amendment Request to Revise Pressurizer Safety Valves Lift Settings
RS-04-018, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order29 January 2004Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Access Authorization Issued January 7, 2003, NRC Order
RS-04-026, Additional Information Regarding a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time18 February 2004Additional Information Regarding a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion TimeFire Watch
RS-04-033, Stations, Units 1 and 2 - Response to RAI Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings3 March 2004Stations, Units 1 and 2 - Response to RAI Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift SettingsLoop seal
RS-04-036, Fitness-for-Duty Performance Data Reports for Second Period of 20031 March 2004Fitness-for-Duty Performance Data Reports for Second Period of 2003Fitness for Duty
RS-04-038, Answer to First Revised NRC Order (EA-03-009) to Modify Licenses Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head9 March 2004Answer to First Revised NRC Order (EA-03-009) to Modify Licenses Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head
RS-04-051, Annual Report of Emergency Core Cooling System Evaluation Model Changes & Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors.14 April 2004Annual Report of Emergency Core Cooling System Evaluation Model Changes & Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors.
RS-04-053, Request for Latest NRC Standardized Plant Analysis Risk (SPAR) Models for Exelon/Amergen Plants7 April 2004Request for Latest NRC Standardized Plant Analysis Risk (SPAR) Models for Exelon/Amergen PlantsSignificance Determination Process
RS-04-056, Request for Additional Information Regarding a Proposed License Amendment to Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.9 April 2004Request for Additional Information Regarding a Proposed License Amendment to Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation.Pressure Boundary Leakage
RS-04-060, Response to Request for Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection16 April 2004Response to Request for Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection
RS-04-065, Request for Relief from ASME Section XI for Performance of Class 2 & 3 Raw Water Piping Repairs26 April 2004Request for Relief from ASME Section XI for Performance of Class 2 & 3 Raw Water Piping RepairsWeld Overlay
Hydrostatic
Coatings
Liquid penetrant
RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process30 April 2004Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
RS-04-068, Unit I, Dresden Nuclear Power Station, Units 2 and 3, Supplemental Response to Issuance of Order to Modify License for Revised Design Basis Threat28 April 2004Unit I, Dresden Nuclear Power Station, Units 2 and 3, Supplemental Response to Issuance of Order to Modify License for Revised Design Basis ThreatEnforcement Discretion
RS-04-072, Request for Additional Information Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift Settings4 June 2004Request for Additional Information Regarding a License Amendment Request to Revise the Pressurizer Safety Valves Lift SettingsLoop seal
RS-04-075, Request for a License Amendment to Incorporate Approved Pressure and Temperature Limits Report (PTLR) Methodology Into Technical Specifications21 May 2004Request for a License Amendment to Incorporate Approved Pressure and Temperature Limits Report (PTLR) Methodology Into Technical SpecificationsNon-Destructive Examination
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
RS-04-080, Response to Generic Letter 2003-01, Control Room Habitability, Integrated Control Room Envelope Unfiltered Inleakage Test Schedules19 March 2004Response to Generic Letter 2003-01, Control Room Habitability, Integrated Control Room Envelope Unfiltered Inleakage Test Schedules
RS-04-093, and Amergen, Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations.14 July 2004and Amergen, Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-04-100, Response to Request for Additional Information Regarding Bulletin 2003-0115 July 2004Response to Request for Additional Information Regarding Bulletin 2003-01
RS-04-108, Amergen Supplemental Response to Requests for Additional Information Related to Revised Physical Security Plans, Sections 1 - 1923 July 2004Amergen Supplemental Response to Requests for Additional Information Related to Revised Physical Security Plans, Sections 1 - 19
RS-04-109, Units 1 & 2 and Three Mile Island, Unit 1 - Initial Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized.27 July 2004Units 1 & 2 and Three Mile Island, Unit 1 - Initial Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized.Boric Acid
Weld Overlay
Nondestructive Examination
VT-2
Pressure Boundary Leakage
Through-Wall Leak
Dissimilar Metal Weld
RS-04-112, Response to Request for Additional Information Related to Revised Training and Qualification Plans23 July 2004Response to Request for Additional Information Related to Revised Training and Qualification Plans
RS-04-118, and Amergen, Revised Responses to Requests for Additional Information Related to Revised Physical Security Plans Sections 1 - 19 and Appendix B4 August 2004and Amergen, Revised Responses to Requests for Additional Information Related to Revised Physical Security Plans Sections 1 - 19 and Appendix B
RS-04-119, (Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans12 August 2004(Exelon) and Amergen Energy Co, LLC (Amergen), Response to Request for Additional Information Related to the Safeguards Contingency Plans and Section 9.4.1 of the Physical Security Plans
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity ProgramSafe Shutdown
Unanalyzed Condition
RS-04-138, Submittal of Revised Physical Security Plans9 September 2004Submittal of Revised Physical Security Plans
RS-04-141, Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process15 September 2004Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Incorporated by reference
Pressure and Temperature Limits Report
Offsite Circuit
RS-04-148, Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels1 October 2004Amergen/Exelon Nuclear, Summary of Teleconference Regarding Implementation of Revised Emergency Action Levels
RS-04-149, Exelon/Amergen Notification of Deferral of the Commitment to Submit License Amendment Request Incorporating Requirement for Control Room Envelope Integrity Program Into Technical Specifications30 September 2004Exelon/Amergen Notification of Deferral of the Commitment to Submit License Amendment Request Incorporating Requirement for Control Room Envelope Integrity Program Into Technical Specifications
RS-04-156, Submittal of Revised Physical Security Plans14 October 2004Submittal of Revised Physical Security Plans
RS-04-157, Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License17 December 2004Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating LicenseBiofouling
RS-04-159, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections.29 October 2004Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections.Nondestructive Examination
RS-04-160, Request for Amendment to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports21 October 2004Request for Amendment to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure ReportsReactor Vessel Water Level
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
RS-04-161, Submittal of Revised Physical Security Plans21 October 2004Submittal of Revised Physical Security Plans
RS-04-177, Response to Request for Additional Information - Exemption from 10CFR20.1703 and 10CFR20 Appendix a Use of Delta Protection French Designed Respiratory Protection Equipment7 December 2004Response to Request for Additional Information - Exemption from 10CFR20.1703 and 10CFR20 Appendix a Use of Delta Protection French Designed Respiratory Protection Equipment
RS-05-002, Confirmation of Implementation of NRC Orders EA-03-039 and EA-03-0863 January 2004Confirmation of Implementation of NRC Orders EA-03-039 and EA-03-086
RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License25 February 2005Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating LicenseSafe Shutdown
Unanalyzed Condition
Emergency Lighting
Foreign Material Exclusion
Scram Discharge Volume
Safeguards Contingency Plan
Control of Heavy Loads
Fire Protection Program
Power Uprate
RS-05-021, Exelon/Amergen Response to NRC Generic Letter 04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.7 March 2005Exelon/Amergen Response to NRC Generic Letter 04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
RS-05-025, Application for Approval of License Transfers3 March 2005Application for Approval of License TransfersSafe Shutdown
Fire Protection Program
RS-05-028, Commitment Change Notification: NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.23 March 2005Commitment Change Notification: NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
RS-05-035, Report on Status of Decommissioning Funding for Reactors24 March 2005Report on Status of Decommissioning Funding for Reactors
RS-05-044, Exigent LAR11 April 2005Exigent LARNondestructive Examination
Finite Element Analysis
RS-05-046, Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.14 April 2005Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.
RS-05-047, Supplement to Request for Exigent License Amendment Related to Technical Specification 5.5 .9, Steam Generator (SG) Tube Surveillance Program.14 April 2005Supplement to Request for Exigent License Amendment Related to Technical Specification 5.5 .9, Steam Generator (SG) Tube Surveillance Program.
RS-05-049, Answer to Issuance of Order Imposing Requirements for Protecting Certain Safeguards Information19 April 2005Answer to Issuance of Order Imposing Requirements for Protecting Certain Safeguards Information