Letter Sequence Response to RAI |
---|
|
|
|
|
---|
Category:Letter type:RS
MONTHYEARRS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-118, Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-10-31031 October 2022 Withdrawal of License Amendment Request to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-072, Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0606 June 2022 Response to Request for Additional Information Regarding License Amendment to Revise Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-075, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2022-06-0202 June 2022 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . RS-22-073, Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube.2022-05-19019 May 2022 Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube. RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2022-04-21021 April 2022 License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-04-0808 April 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-014, Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time2022-03-24024 March 2022 Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time RS-22-041, Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes2022-03-22022 March 2022 Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-008, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin2022-01-24024 January 2022 Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-117, Application for Amendment to Renewed Facility License to Remove License Condition 2.C.(12)(d)2021-12-0909 December 2021 Application for Amendment to Renewed Facility License to Remove License Condition 2.C.(12)(d) RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections 2024-01-11
[Table view] |
Text
RS-04-060 April 16, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 1 Facility Operating License No. NPF-72 NRC Docket No. 50-456
Subject:
Response to Request for Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection
References:
(1) Letter from J. D. von Suskil to U. S. NRC, Tenth Refuel Outage Steam Generator In-Service Inspection Report, dated May 7, 2003 (2) Letter from M. J. Pacilio to U. S. NRC, Braidwood Station , Unit1 Tenth Refueling Outage Steam Generator Inservice Inspection Summary Report, dated July 29, 2003 Based on the review of the referenced reports, the NRC determined that additional information was required in order to complete their evaluation of the Braidwood Station Unit 1 April 2003 steam generator inspection reports. During a March 18, 2004 teleconference, the NRC requested responses to four questions. The attachment to this letter documents the Braidwood Station responses that were provided verbally during the teleconference.
Should you have any questions concerning this letter, please contact David J. Chrzanowski at (630) 657-2816.
Respectfully, Kenneth A. Ainger Manager, Licensing
Attachment:
Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection
Attachment Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection Question 1 Various types of tube wear have occurred in Babcock and Wilcox recirculating steam generators (SG) including typical wear, localized fan bar wear (theorized to be a result of arch-bar distortion which affects specific columns of tubes), and atypical wear (attributed to asperities on the flat surfaces of the fan bar supports). For the indications of tube wear detected at Braidwood 1 at the fan bar and lattice grids, clarify the type of tube wear that is occurring at these locations.
Braidwood Station Response:
All indications of fan bar wear and lattice grid wear were categorized as typical wear.
All these indications received Plus Point inspection during the Braidwood Station Unit 1 April 2003 refueling outage. Of the seven fan bar wear indications, the largest was identified as 10% through-wall (TW). The largest of the five lattice grid wear indications was listed as 12% TW.
Question 2 The February 9, 2001 amendment request 1 to extend the operating interval between inspections indicated that several tubes were in contact with other tubes and this condition is expected to naturally correct itself. Discuss the extent to which this condition (i.e., tube-to-tube contact) was monitored during your 2003 inspections. Discuss whether any tubes in contact were identified during the 2003 outage. If tubes in contact were identified, discuss whether the tubes were also in contact prior to placing the SG inservice. Discuss whether all tubes previously determined to be in contact were inspected in 2003. If all tubes known to be in contact were not inspected, discuss the basis for concluding that the structural and leakage integrity of the SG will be maintained at these locations until the next inspection.
Braidwood Station Response:
All tubes identified as being in contact during the previous outage i.e., the Braidwood Station Unit 1 outage in March 2000, were re-inspected during the Unit 1 outage in April 2003 and none showed any signs of wear. During the preservice examination, 508 tubes were identified as being in contact. This number of tubes in contact dropped to 85 when examined in the March 2000 outage. Reinspection of these 85 tubes during the Unit 1 April 2003 outage showed 67 of the 85 still in contact. Also, during this outage, 65 tubes were newly identified as being in contact.
1 Letter from R. M. Krich to U. S. NRC, Request for Technical Specification Change Braidwood Station Unit 1, Steam Generator Inspection Frequency Revision for the Fall 2001 Refueling Outage, dated February 9, 2001 Page 1 of 4
Attachment Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection When tube to tube contact was identified during fabrication of the SG, Babcock and Wilcox developed a report to assess the condition: B&W-TR-97-18, U-Bend Radial Gap Assessment Report, Revision 0, October 1997. This report provides an evaluation of the tube-to-tube contact condition and assessed the potential of fretting, wear damage, and corrosion-induced degradation due to long-term tube-to-tube contact.
Based on conservative estimates of wear coefficients and work-rates at the tube-to-tube contact area, the report concluded that a maximum tube wall loss of 40% would not occur until after 60 years of continuous full power operation. Therefore, it is not expected that tube contact fretting would result in challenging the structural integrity criteria during the life of the SG.
The potential for corrosion induced degradation (as a result of excessive fouling or deposit bridging) compounded by tube contact is bounded by the top of tubesheet expansion region. This condition at the top of tubesheet has been previously qualified by extensive testing. The Babcock and Wilcox report recommends that the tube contact be monitored over time through the plants normal inspection program. Exelon Generation Company, LLC will continue to monitor the condition and perform inspection of the affected tubes during each scheduled steam generator inspection.
Question 3 The February 9, 2001 amendment request to extend the operating interval between inspections indicated that no foreign objects were known to be present in the SG. For the loose parts that were identified during the 2003 outage, were these locations (i.e.,
the locations where the loose parts were detected in 2003) inspected (visually) during the inspections in 2000? The inspection results indicate wear on one tube proceeding to 48% through-wall in the course of two operating cycles (or possibly less), therefore, the staff requests a discussion on when these loose parts were introduced into the SG.
Braidwood Station Response All areas where foreign objects were identified during the April 2003 outage were inspected by both visual and 100% eddy current during the March 2000 outage. During the March 2000 examination three objects were identified. These objects were removed and no tube wear was identified.
The majority of the objects identified in the secondary side of the SG during the April 2003 examination are believed to have been the result of a collapsed feedwater pump suction strainer. The collapsed suction strainer was identified during the outage and repaired prior to returning the associated feedwater pump to service. The remaining feedwater suction strainers were inspected during the outage and were intact.
A review of online feedwater iron transport data over the last two cycles of operation indicates a spike in iron concentrations in August of 2001; this is most likely when the suction strainer collapsed. The spike in August 2001 was late in Cycle 9 (i.e., March 5, 2000 thru September 22, 2001) of Unit 1 operation.
Page 2 of 4
Attachment Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection As part of the assessment of foreign objects identified during the April 2003 Braidwood Station Unit 1 refueling outage, Babcock and Wilcox performed an evaluation of the identified conditions. The evaluation assumed all foreign object wear had occurred in one cycle of operation and used the bounding wear identified during the 2003 inspection.
The evaluation used the maximum flow velocity region of the top of tubesheet region as a bounding condition.
The evaluation concluded that for objects at the top of tubesheet region, the outermost five tubes on the bundle periphery were most susceptible to foreign object wear.
Inboard of the first five tubes, the flow velocity substantially reduces and accordingly so does the potential for significant tube wear. The evaluation concluded that for an object similar to the bounding object identified in the 2003 examination and assuming that the object was located in the limiting high flow region of the periphery of the tube bundle, the expected wear morphology would not be projected to exceed the SG tube structural limit for two cycles of operation.
During the upcoming Braidwood Station Unit 1 outage, scheduled for October 2004, eddy current inspection of one SG is planned. If foreign object wear is identified that does not support two cycles of operation, scope expansion to assess the condition of the other SG will be required.
Question 4 The SG at Braidwood 1 were replaced in 1998. Provide the following general design information: the manufacturer of the tubes, the thickness (axial extent) of the tube supports (fan bars and lattice grid), and the pitch and pattern (e.g., triangular) of the tubes. Also, clarify the rows of tubes that were stress relieved after bending (i.e., what rows have bend radii less than or equal to 12-inches).
Braidwood Station Response Steam Generator Manufacturer Babcock and Wilcox International (BWI)
Tubing Manufacturer Sumitomo Japan Tube Outside Diameter 0.6875" Tube Wall Thickness 0.040" Tube Material Inconel 690 Thermally Treated (SB-163) 410 stainless steel lattice grids 9 elevations high lattice ~ 3" tall every sixth pitch Tube Support System low lattice ~ 1" tall all other locations lowermost lattice grid uses a ~ 2" tall low lattice in place of the 1" low lattice near the periphery tubes ends are captured by a ring around the periphery Page 3 of 4
Attachment Additional Information Regarding the Braidwood Station Unit 1 April 2003 Steam Generator Inspection 410 stainless steel fan bars 10 bars (5 each half of bundle)
U-bend Support System fan bars are ~ 1.25" tall nominal tube to bar clearance is 0.006" tubes are triangular pitch Tube Pitch 0.93" pitch gap between tubes is < 1/4" all U-Bends up to a 12" centerline radius U-Bend Stress Relief are stress relieved rows 1 to 21 have bend radii less than or equal to 12" Page 4 of 4