Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 07/14/2004
From: Gallagher M
AmerGen Energy Co, Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-04-20146, 5928-04-20163, RIS-04-010, RS-04-093
Download: ML042050384 (13)


Text

Amer~anim Exekrn.

www.exeloncorp.com An Exelon Company AmerGen Energy Company, LLC Nuclear Exelon Generation 4300 Winfield Road 4300 Winfield Road Warrenville, IL 60555 Warrenville, IL 60555 RIS 2004-10 RS-04-093 2130-04-20146 5928-04-20163 July 14, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 . 005 A

Response to RIS 2004-10 July 14, 2004 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatory Issue Summary 2004-10 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary (RIS) 2004-10, "Preparation and Scheduling of Operator Licensing Examinations," dated June 14, 2004.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to RIS 2004-10 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above.

The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Years (CYs) 2005 and 2008, a total of 6 candidates per year are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in . The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and for PBAPS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, 2g e /,<

Michael P. Gallagher Director, Licensing & Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments Attachment 1 - Completed NRC Form 536 for Braidwood Station Attachment 2 - Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 - Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 - Completed NRC Form 536 for LaSalle County Station Attachment 6 - Completed NRC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Generating Station Attachment 8 - Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Attachment 10 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response to RIS 2004-10 July 14, 2004 Page 3 cc: Regional Administrator - NRC Region I w/attachments Regional Administrator - NRC Region III "

NRC Senior Resident Inspector - Braidwood Station "

NRC Senior Resident Inspector - Byron Station "

NRC Senior Resident Inspector - Clinton Power Station "

NRC Senior Resident Inspector - Dresden Nuclear Power Station "

NRC Senior Resident Inspector - LaSalle County Station "

NRC Senior Resident Inspector - Limerick Generating Station "

NRC Senior Resident Inspector - Oyster Creek Generating Station "

NRC Senior Resident Inspector - Peach Bottom Atomic Power Station "

NRC Senior Resident Inspector - Three Mile Island Nuclear Station "

NRC Senior Resident Inspector - Quad Cities Nuclear Power Station "

Response to RIS 2004-10 Attachment 1 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator esaminations. Send comments regarding burden estimate to the Records Management Branch (T-6 E6). U.S. Nuclear Regulatory Commission, Washington, OPERATOR LICENSING DC 20555-0001, or by Internet e-mail to infocollects@nrc.rov, and to the esk EXAMI ATION DATAOfficer. Office of Information and Regulatory Affairs. NEOB 10202. (3150-0131),

EXAMINATION DATA Office of Management and Budget. Wtahinon. DC 20503. If a means used to impose an information collection does not isplay a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACIUTY NRC REGION Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 0 0 2 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 5/15/06-5/26/06 N/A 3/03/08 - 3/14/08 ALTERNATE DATE N/A 5/22/06 - 6/2/06 N/A 3/10/08 - 3/21/08 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED__ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED jET NUMBER OF 8 0 0 0 0 0 0 10 CANDIDATES

Response to RIS 2004-10 Attachment 2 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collectbon is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Manaqeent Branch (T-6 E61.U.S. Nuclear Regulatory Commission, Washin ton, OPERATOR LICENSING DC nem55-ent ror by interet e-mail to infocollectsgnrc.gov. and to the Desk EX EXA MI N.ATI OMN ON T A AOfflcer.

DATA Office ofOffice of Ifrain Management ndRegulatory and Budnge Affairs. 20503.B t.eWahingon,l~DCa NES122 If20 a353 men(1003) )sdt impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 4 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 8 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/31/05 N/A 11/05/07 N/A ALTERNATE DATE 11/07/05 N/A 11/12/07 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 I

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED _ _ __ _ __ __ _ __

NUMBER OF 0 0 0 0 0 18 0 CANDIDATES

Response to RIS 2004-10 Attachment 3 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 07/31/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records OPERATOR LICENSINl_GJ OPERATO I Management Branch (T-6 E6) U.S. Nuclear Regulatory Commission, Washington.

DC 20555-0001. or by internet e-mail to infocollects(Onrc.gov. and to the Desk EXAMNATONATAOfficer. Office of Information and Regulatory Affairs. NEOB-10202. (3150-0131).

EXAMINATION DATA OfOfficeof Management and Budget. ashington. DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number. the NRC may not conduct or sponsor. and a person is not required to respond to. the information collection.

FACILITY NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 5 0 3 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 2 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 0 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES Weeks of Week of PRIMARY DATE N/A N/A 7/11 & 7/18 8/20 Weeks of Week of ALTERNATE DATE N/A N/A 6/13 & 6/20 8/27 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES MARCH 0

10 JUNE 0

SEPTEMBER 0

DECEMBER 0

MARCH 0

JUNE 8

SEPTEMBER 0

DECEMBER 0

Response to RIS 2004-10 Attachment 4 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0713112006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-§ E6). U.S. Nuclear Regulator Commission, Washington.

OPE RATOR LICENSING DC 20555-0001. or by internaee-mail to infocollecist nrc.gov. and to the Desk EI A N DATAOtficer, Office of Information and Regulatory Affairs. NEOB-10202 (3t50.0131)

EXAMINATIO DATAu, Olffce of Management anid Baudgt,>Wasohinton.C253. t pamureans valid Ecotrol impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2005 CY2006 CY2007 CY2008 NUMBER OF REACTOR 0 0 2 0 OPERATORS NUMBER OF SENIOR REACTOR 0 6 6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 9/19/05 - 9/23/05 N/A 1/29/07 - 2/2/07 7/14/08 - 7/18/08 ALTERNATE DATE 9/26/05 - 9/30/05 N/A 2/5/07 - 2/9/07 7/21/08 - 7/25/08 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 10 0 0 0 0 CANDIDATES

Response to RIS 2004-10 Attachment 5 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2006 (5-2003) Estimated burden per response to comply With this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records LG OPERATOR LICENSING Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission. Washington.

DC 20555-0001. or by internet e-mail to infocollectsonrc.gov. and to the esk EXAMINATION DATA Officer. Office of Informanend Regulatory Affairs, NEOB-10202. (3150-0131),

impose an information collection does not gisplay a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 0 0 3 OPERATORS NUMBER OF SENIOR REACTOR 3 6 0 6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 03/07/2005 11/20/2006 N/A 08/18/2008 ALTERNATE DATE 03/07/2005 12/04/2006 N/A 08/25/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED JET NUMBER OF 0 0 6 0 0 0 0 0 CANDIDATES

Response to RIS 2004-10 Attachment 6 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records MaaeetBranch (T-6 E6). U.S. Nuclear Regulatory Commission. Wsign OPERATOR LICENSING DC 20555-0001. or by intemet e-mail to infocollectsgnrc.gov. and to the sk EXAMINATIONEXAMINATIONe DATAfrmaionand DATA Office of Management and Budget.Regulatory Affairs, Wtashingto~n. NECB-110202.

DC 20o503. If22 (3150-0131t.

a meas usedto impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 6 4 4 0 OPERATORS NUMBER OF SENIOR REACTOR 10 6 4 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3 2 4 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 6 0 0 6 OPERATORS-LIMITED PROPOSED DATES ILT 1/10 - 1/21 PRIMARY DATE 7/31-8/11 10/01-10/12 LSRO 6/2-6/6 LSRO 5/30 - 6/10 ALTERNATE DATE LSRO 6/13 - 6/24 8/7 - 8/18 10/08 -10/19 LSRO 6/16 - 6/20 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 14 0 0 CANDIDATES

Response to RIS 2004-10 Attachment 7 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES. 07/31/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Man em en Brnch (T-6 E6). U.S Nuclear Regulator Commission. Washinon OPERATOR LICENSING 2a555-1. or by internet e-mail to infocollectsunrc.gov, and to the esk aDC EXAMINATIONEXAMIATIONDATAOfficer.

DATA Office ofOffice of Information Management arid Regulatory Affairs, NEOB- 10202. (3150-0131).

and Budget. Washinoton. DC 20503. If a means used to impose an information collection does not display a Currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION Oyster Creek Generating Station I Facility Operating License No. DPR-1 6 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY2007 CY2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 8 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 4 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 06/2006 N/A N/A ALTERNATE DATE N/A 08/2006 N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED NUMBER MARCH JUNE SEPTEMBER J DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 20 0 0 0 0 0 0 0 CANDIDATES

Response to RIS 2004-10 Attachment 8 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; NO. 3150-0131 EXPIRES: 07/31/2006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission. Washington, OPERATOR LICENSING DC 20555-001. or by intemet e-mail to infocollectsf@nrc.gov. and to the Desk EXAMINATIONEXAMI ATION DATAOtficer.

DATA Office of Information and Regulatory Affairs. NEOB-10202, (3150.0131).

Office of Magment and Budget. Washington. DC 20503. If a means used to impose an inormation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 5 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR 9 0 5 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR *0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 2/7-2/18 N/A 2/5-2/16 N/A ALTERNATE DATE N/A N/A 2/19-3/2 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED __ _ _ __ _ _ ___ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBERAOF CANDIDATES 0 0 0 7 0 jME~E 0 0 0

  • See Attachment 6 (Limerick Generating Station) for LSRO numbers and exam dates

Response to RIS 2004-10 Attachment 9 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0713112006 (5-2003) Estimated burden per response to comply wth this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator exammations. Send comments regarding burden estimate to the Records ana I B chT-6 E6). U.S. Nuclear Regulatory Commission. Washington.

OPERATOR LICENSING DC 5gment or by Internet e-mail to infocollects@nrc.gov. and to the Desk EXAMI EXAMINATION DATA ATION DATAOfficer. Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131).

Office of Management and Budget. VWashington. DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 7 12 0 4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/9/05 - 5/20/05 10/16/06-10/27/06 N/A 6/16/08 - 6/27/08 ALTERNATE DATE 5/16/05 - 5/27/05 10/30/06-11/10/06 N/A 6/23/08 - 7/3108 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2006 PROPOSED _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEDE MEj NUMBER OF 0 16 0 0 0 0 0 0 CANDIDATES

Response to RIS 2004-10 Attachment 10 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/3112006 (5-2003) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send Comments regarding burden estmate to the Records Brach(T6 E).U.. NclarRegulatoryr Commission.Wahnt.

OPERATOR LICENSING Management oraby ntene-m to i infocollectsanrc.gov. and to the Desk Oflcer olInormtio Ofic ad Roultoy Afais.NEOB-10202. (3150-0131).

EXAMINATION DATA Ofsice of Management and B used to impose an iformation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the information collection.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 2 0 3 0 OPERATORS NUMBER OF SENIOR REACTOR 5 0 6 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 1 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 05/02/2005 N/A 04/02/2007 N/A ALTERNATE DATE 04/11/2005 N/A 04/16/2007 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE