Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000287/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis Encl9 March 1983Forwards LER 83-001/01T-0.Detailed Event Analysis Encl
05000287/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Encl25 March 1983Forwards LER 83-002/01T-0.Detailed Event Analysis Encl
05000287/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Encl13 April 1983Forwards LER 83-005/01T-0.Detailed Event Analysis Encl
3F0191-07, Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage Factor31 January 1991Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage FactorOperating Basis Earthquake
IR 05000260/197802129 December 1978Addl Info on Reportable Occurrence 50-260/78-21.Subsequent Investigation Has Shown Sensor to Have High Ground Leakage Causing Low Signal Output.Isolation Amplifier Installed to Eliminate Leakage
IR 05000287/199202319 March 1993Responds to NRC 930210 Ltr Re Violations Noted in Insp Repts 50-287/92-23 & 50-388/92-23.C/As:surveillance Procedures Will Be Revised to Address Types of Fire Barrier Matl to Be Inspected to Provide Acceptance Criteria for Fire BarrierFire Barrier
L-81-027, Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-275 October 1981Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-27
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 198318 February 1983Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983
ML15217A10328 February 1990Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation ManualsOffsite Dose Calculation Manual
Process Control Program
ML15217A10526 March 1990Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose CalculationsAnnual Radiological Environmental Operating Report
ML15219A05025 April 1980Forwards Addl Comments to Gaston County Board of Commissioners' Position Opposing Spent Nuclear Fuel Shipment Through County & Two Proposed Alternate Routes.Author Does Not Oppose Shipment If Adequate Safeguards Are Provided
ML15219A07423 August 1993Forwards Rev 0 to ISI Rept Unit 2 Oconee 1993 Refueling Outage 13.Hydrostatic
VT-2
Liquid penetrant
Dissimilar Metal Weld
ML15223A59924 June 1980Forwards Proposed Tech Spec Revision in Response to NRC 800410 Ltr Discussing Term Operable as Applied to Tech Spec Requirements.No License Fees Provided Since Proposal Submitted in Response to NRC RequestShutdown Margin
ML15224A25812 May 1993Forwards Public Version of Rev 93-02,vol a to Oconee Nuclear Site Emergency Plan & Rev 93-08,vol C to Oconee Nuclear Site Epip. W/930628 Release Memo
ML15224A2601 March 1993Forwards Public Version of Rev 93-01 to Vol a & Rev 93-05 to Vol C to Emergency plan.W/930625 Release Memo
ML15224A26213 January 1993Forwards Revs 92-04,92-12 & 92-13 to Vols A,B & C to Emergency Plan & Implementing procedures.W/930628 Release Memo
ML15224A26530 June 1993Forwards Rev 9 to Corporate Process Control Program Manual.Process Control Program
ML15238A6004 June 1982Forwards, Audit of Oconee Procedures & Training for Pressurized Thermal Shock.
ML15238A61210 June 1982Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure HP/0/1009/10 Re Procedures for Quantifying Gaseous Releases Through Steam Relief Valves Under post-accident Conditions
ML15238A89012 July 1983Forwards Proprietary Gadolinia-Bearing Lead Test Assemblies Design Rept. Info Includes Design,Testing & Analysis for Five Lead Test Assemblies w/12 gadolina-bearing Fuel Rods to Be Loaded in Cycle 8.Rept Withheld (Ref 10CFR2.790)Exclusive Use
Affidavit
ML15238B33110 April 1981Forwards Proprietary BAW-1661 P, Mark B2 Demonstration Assemblies in Oconee 1,Cycles 7,8 & 9. Rept Available in Central Files Only.Withholding Per 10CFR2.790 Requested. Nonproprietary Version to Be Submitted by 810430Exclusive Use
Affidavit
ML15239A63616 November 1979Forwards Proposed Tech Spec Changes Required to Support Operation of Facility at Full Rated Power During Cycle 5. BAW-1565, Cycle 5 Reload Rept EnclShutdown Margin
Power change
ML15245A10224 July 1979Responds to NRC 790629 Request for Description of Util Mgt & Technical Resources to Support Facility.Forwards Section 13.1 of Topical Rept DUKE-2 Re Conduct of OperationsHydrostatic
ML15245A11918 September 1979Forwards Preliminary Rept, Description of Proposed Mod to Radiological Effluent Treatment Facility, Sept 1979
ML15245A1468 November 1979Forwards Steam Generator Insp Plan for Upcoming Nov 1979 Refueling Outage
ML15245A18327 December 1979Forwards Revised Emergency Plan in Response to NRC 791010 Request.Intends to Implement Revised Emergency Plan 30 Days Following NRC Approval of Plan
ML15261A06131 August 1988Forwards Proprietary Topical Rept DPC-NE-2003, Oconee Nuclear Station Core Thermal-Hydraulic Methodology Using VIPRE-01. Rept Withheld (Ref 10CFR2.790)Power change
ML15261A07016 October 1991Forwards Nonproprietary & Proprietary Handouts Presented in 911007 & 08 Meeting W/Nrc & Contract Reviewers to Discuss Outstanding Issues Associated W/Topical Repts DPC-NE-2004, DPC-NE-3000 & DPC-NE-3001.Proprietary Handouts WithheldAffidavit
ML16131A3218 October 1990Forwards FSAR Chapter 16, Selected Licensee Commitments, for Facility
ML16134A66325 August 1980Forwards Proposed Revision to Tech Specs to Support Unit 3 at Full Rated Power During Cycle 6 & B&W Rept, Oconee Unit 3,Cycle 6 Reload Rept.Shutdown Margin
ML16148A25810 October 1979Forwards LER 79-005/03L-0
ML16148A35618 September 1980Forwards LER 80-014/03L-0
ML16148A3786 November 1980Forwards LER 80-022/01T-0Fire Barrier
Hourly Fire Watch
ML16148A42322 May 1981Comments on Encl B&W Rept Ltr Rept on Reactor Vessel Brittle Fracture Concerns in B&W Operating Plants. Addl plant-specific Info in Support of Subj Rept Provided.Util Will Complete Analysis to Resolve Generic ConcernsIncorporated by reference
ML16148A93231 October 1990Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6.W/901114 Release Memo
ML16152A86418 October 1989Forwards Public Version of Revs 89-05 & 89-07 to Vol B & C, Respectively,Of Implementing Procedures Emergency Plan. W/891030 Release Memo
ML16152A87030 October 1989Forwards Public Version of Rev 32 to Crisis Mgt Plan for Nuclear Stations. W/891113 Release Memo
ML16152A8731 November 1989Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8 & Rev 31 to CMIP-9.W/891020 Release Memo
ML16152A87521 November 1989Forwards Proprietary DPC-NE-2003P-A & Nonproprietary DPC-NE-2003-A, Core Thermal-Hydraulic Methodology Using VIPRE-01. Proprietary Rept Withheld
ML16152A90619 January 1990Forwards Public Version of Rev 90-01 to Vol C to Oconee Nuclear Station Implementing Procedures Emergency Plan & Rev 89-03 to Vol a to Oconee Nuclear Station Emergency Plan. W/900131 Release Memo
ML16152A90918 January 1990Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo
ML16152A94114 March 1990Forwards Public Version of Rev 90-01 (Vol a) to Emergency Plan Manual & Revs 90-01 (Vol B) & 90-03 (Vol C) to EPIP Manual.W/Dh Grimsley 900329 Release Memo
ML16152A9532 May 1990Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld
ML16152A9629 May 1990Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo
ML16152A98214 June 1990Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo
ML16152A98419 June 1990Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1
ML16154A3204 May 1993Submits Written Followup to 930504 Telcon Request for Enforcement Discretion from TS 4.7.1 Re Control Rod Trip Time Test.On 930504,two Control Rods Declared Inoperable as Result of Test Data Questioning Rod Trip TimesEnforcement Discretion
ML16161A1243 December 1993Forwards PDR Version of Vol C,Rev 93-20 to Oconee Nuclear Site Epip.
ML16161A13217 January 1994Forwards Public Version of Vol A,Rev 93-05 to ONS Emergency Plans & Vol C,Rev 93-21 to ONS EPIP w/940203 Release MemoDeep Dose Equivalent
ML16162A28810 December 1979Ack Receipt of IE Insp Repts 50-269/79-28,50-270/79-26 & 50-287/79-28 on 791024-26.No Proprietary Info