Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000287/LER-1983-001, Forwards LER 83-001/01T-0.Detailed Event Analysis Encl | 9 March 1983 | Forwards LER 83-001/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Encl | 25 March 1983 | Forwards LER 83-002/01T-0.Detailed Event Analysis Encl | |
05000287/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Encl | 13 April 1983 | Forwards LER 83-005/01T-0.Detailed Event Analysis Encl | |
3F0191-07, Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage Factor | 31 January 1991 | Forwards BAW-2127, Final Submittal for NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' Revised Operating Transients Will Accommodate Normal Variations in Operations & Ensure Margin in Total Fatigue Usage Factor | Operating Basis Earthquake |
IR 05000260/1978021 | 29 December 1978 | Addl Info on Reportable Occurrence 50-260/78-21.Subsequent Investigation Has Shown Sensor to Have High Ground Leakage Causing Low Signal Output.Isolation Amplifier Installed to Eliminate Leakage | |
IR 05000287/1992023 | 19 March 1993 | Responds to NRC 930210 Ltr Re Violations Noted in Insp Repts 50-287/92-23 & 50-388/92-23.C/As:surveillance Procedures Will Be Revised to Address Types of Fire Barrier Matl to Be Inspected to Provide Acceptance Criteria for Fire Barrier | Fire Barrier |
L-81-027, Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-27 | 5 October 1981 | Forwards Public Version of Revision 1 to Crisis Mgt Plan. Revision Includes Pages of Radiological Emergency Plans & Implementing Procedures Identified as Containing Privacy or Proprietary Info Per NRC Generic Ltr 81-27 | |
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | 18 February 1983 | Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | |
ML15217A103 | 28 February 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals | Offsite Dose Calculation Manual Process Control Program |
ML15217A105 | 26 March 1990 | Forwards Revised 1989 Annual Radiological Environ Operating Rept,Consisting of Revised Pages Summarizing Annual Liquid Dose Calculations | Annual Radiological Environmental Operating Report |
ML15219A050 | 25 April 1980 | Forwards Addl Comments to Gaston County Board of Commissioners' Position Opposing Spent Nuclear Fuel Shipment Through County & Two Proposed Alternate Routes.Author Does Not Oppose Shipment If Adequate Safeguards Are Provided | |
ML15219A074 | 23 August 1993 | Forwards Rev 0 to ISI Rept Unit 2 Oconee 1993 Refueling Outage 13. | Hydrostatic VT-2 Liquid penetrant Dissimilar Metal Weld |
ML15223A599 | 24 June 1980 | Forwards Proposed Tech Spec Revision in Response to NRC 800410 Ltr Discussing Term Operable as Applied to Tech Spec Requirements.No License Fees Provided Since Proposal Submitted in Response to NRC Request | Shutdown Margin |
ML15224A258 | 12 May 1993 | Forwards Public Version of Rev 93-02,vol a to Oconee Nuclear Site Emergency Plan & Rev 93-08,vol C to Oconee Nuclear Site Epip. W/930628 Release Memo | |
ML15224A260 | 1 March 1993 | Forwards Public Version of Rev 93-01 to Vol a & Rev 93-05 to Vol C to Emergency plan.W/930625 Release Memo | |
ML15224A262 | 13 January 1993 | Forwards Revs 92-04,92-12 & 92-13 to Vols A,B & C to Emergency Plan & Implementing procedures.W/930628 Release Memo | |
ML15224A265 | 30 June 1993 | Forwards Rev 9 to Corporate Process Control Program Manual. | Process Control Program |
ML15238A600 | 4 June 1982 | Forwards, Audit of Oconee Procedures & Training for Pressurized Thermal Shock. | |
ML15238A612 | 10 June 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure HP/0/1009/10 Re Procedures for Quantifying Gaseous Releases Through Steam Relief Valves Under post-accident Conditions | |
ML15238A890 | 12 July 1983 | Forwards Proprietary Gadolinia-Bearing Lead Test Assemblies Design Rept. Info Includes Design,Testing & Analysis for Five Lead Test Assemblies w/12 gadolina-bearing Fuel Rods to Be Loaded in Cycle 8.Rept Withheld (Ref 10CFR2.790) | Exclusive Use Affidavit |
ML15238B331 | 10 April 1981 | Forwards Proprietary BAW-1661 P, Mark B2 Demonstration Assemblies in Oconee 1,Cycles 7,8 & 9. Rept Available in Central Files Only.Withholding Per 10CFR2.790 Requested. Nonproprietary Version to Be Submitted by 810430 | Exclusive Use Affidavit |
ML15239A636 | 16 November 1979 | Forwards Proposed Tech Spec Changes Required to Support Operation of Facility at Full Rated Power During Cycle 5. BAW-1565, Cycle 5 Reload Rept Encl | Shutdown Margin Power change |
ML15245A102 | 24 July 1979 | Responds to NRC 790629 Request for Description of Util Mgt & Technical Resources to Support Facility.Forwards Section 13.1 of Topical Rept DUKE-2 Re Conduct of Operations | Hydrostatic |
ML15245A119 | 18 September 1979 | Forwards Preliminary Rept, Description of Proposed Mod to Radiological Effluent Treatment Facility, Sept 1979 | |
ML15245A146 | 8 November 1979 | Forwards Steam Generator Insp Plan for Upcoming Nov 1979 Refueling Outage | |
ML15245A183 | 27 December 1979 | Forwards Revised Emergency Plan in Response to NRC 791010 Request.Intends to Implement Revised Emergency Plan 30 Days Following NRC Approval of Plan | |
ML15261A061 | 31 August 1988 | Forwards Proprietary Topical Rept DPC-NE-2003, Oconee Nuclear Station Core Thermal-Hydraulic Methodology Using VIPRE-01. Rept Withheld (Ref 10CFR2.790) | Power change |
ML15261A070 | 16 October 1991 | Forwards Nonproprietary & Proprietary Handouts Presented in 911007 & 08 Meeting W/Nrc & Contract Reviewers to Discuss Outstanding Issues Associated W/Topical Repts DPC-NE-2004, DPC-NE-3000 & DPC-NE-3001.Proprietary Handouts Withheld | Affidavit |
ML16131A321 | 8 October 1990 | Forwards FSAR Chapter 16, Selected Licensee Commitments, for Facility | |
ML16134A663 | 25 August 1980 | Forwards Proposed Revision to Tech Specs to Support Unit 3 at Full Rated Power During Cycle 6 & B&W Rept, Oconee Unit 3,Cycle 6 Reload Rept. | Shutdown Margin |
ML16148A258 | 10 October 1979 | Forwards LER 79-005/03L-0 | |
ML16148A356 | 18 September 1980 | Forwards LER 80-014/03L-0 | |
ML16148A378 | 6 November 1980 | Forwards LER 80-022/01T-0 | Fire Barrier Hourly Fire Watch |
ML16148A423 | 22 May 1981 | Comments on Encl B&W Rept Ltr Rept on Reactor Vessel Brittle Fracture Concerns in B&W Operating Plants. Addl plant-specific Info in Support of Subj Rept Provided.Util Will Complete Analysis to Resolve Generic Concerns | Incorporated by reference |
ML16148A932 | 31 October 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 37 to CMIP-1,Rev 27a to CMIP-2,Rev 33 to CMIP-4,Rev 37 to CMIP-5 & Rev 42 to CMIP-6.W/901114 Release Memo | |
ML16152A864 | 18 October 1989 | Forwards Public Version of Revs 89-05 & 89-07 to Vol B & C, Respectively,Of Implementing Procedures Emergency Plan. W/891030 Release Memo | |
ML16152A870 | 30 October 1989 | Forwards Public Version of Rev 32 to Crisis Mgt Plan for Nuclear Stations. W/891113 Release Memo | |
ML16152A873 | 1 November 1989 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8 & Rev 31 to CMIP-9.W/891020 Release Memo | |
ML16152A875 | 21 November 1989 | Forwards Proprietary DPC-NE-2003P-A & Nonproprietary DPC-NE-2003-A, Core Thermal-Hydraulic Methodology Using VIPRE-01. Proprietary Rept Withheld | |
ML16152A906 | 19 January 1990 | Forwards Public Version of Rev 90-01 to Vol C to Oconee Nuclear Station Implementing Procedures Emergency Plan & Rev 89-03 to Vol a to Oconee Nuclear Station Emergency Plan. W/900131 Release Memo | |
ML16152A909 | 18 January 1990 | Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo | |
ML16152A941 | 14 March 1990 | Forwards Public Version of Rev 90-01 (Vol a) to Emergency Plan Manual & Revs 90-01 (Vol B) & 90-03 (Vol C) to EPIP Manual.W/Dh Grimsley 900329 Release Memo | |
ML16152A953 | 2 May 1990 | Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld | |
ML16152A962 | 9 May 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo | |
ML16152A982 | 14 June 1990 | Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo | |
ML16152A984 | 19 June 1990 | Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1 | |
ML16154A320 | 4 May 1993 | Submits Written Followup to 930504 Telcon Request for Enforcement Discretion from TS 4.7.1 Re Control Rod Trip Time Test.On 930504,two Control Rods Declared Inoperable as Result of Test Data Questioning Rod Trip Times | Enforcement Discretion |
ML16161A124 | 3 December 1993 | Forwards PDR Version of Vol C,Rev 93-20 to Oconee Nuclear Site Epip. | |
ML16161A132 | 17 January 1994 | Forwards Public Version of Vol A,Rev 93-05 to ONS Emergency Plans & Vol C,Rev 93-21 to ONS EPIP w/940203 Release Memo | Deep Dose Equivalent |
ML16162A288 | 10 December 1979 | Ack Receipt of IE Insp Repts 50-269/79-28,50-270/79-26 & 50-287/79-28 on 791024-26.No Proprietary Info |