ML15245A183
| ML15245A183 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/27/1979 |
| From: | Parker W Duke Power Co |
| To: | Reid R, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML15245A184 | List: |
| References | |
| NUDOCS 8001030519 | |
| Download: ML15245A183 (2) | |
Text
REGULATURY *ORMATION DISTRIBUTION SYS (RIDS)
ACCESSION NBR:8001030519 DOC.DATE: 79/12/27 NOTARIZED: NO DOCKET FACK:50*269 Oconee Nuclear Station, Unit Is DukeowerCo, 50-270 Oconee Nuclear Station, Unit 2, Duke-Power Co.
50-287 Oconee Nuclear Station, Unit 3# Duke Power Co.
AUTHqNAME AUTHOR AFFILIATION PARKERvP.O DukePower Co.
HECIP,NAME RECIPIENT AFFILIATION uENTON,H.R, Office of Nuclear Reactor Regulation EIDR..
Operating Reactors Branch 4
SUBJECT:
Forwards revised emergency plan in response to NRC 791010 request.Plans to implement revised emergency plan 30 days following NRC approval of plane DISTRIBUTION CODES A0433 COPIES RECEIVED:LTR,
ENCL 7 SIZE:.L. 2 TITLE: Emergency Planning Implementation (OL Stage)
NUTES: -
C-AA
//-
L Aa/ S TBSAiAE5_
RECIPIENT COPIES RECIPIENT COPIES I CO0E7NAME LTTR EN ID CODE/NAME LTTR ENCL ACTION:
7 BC 7
INTERNAL: 1.
15 I E
2 2
17 TINT 1NAL 18 CORE PERF BR 1
I 19 ENGR BR 1
1 2 NRC PDR i
20 REAC SFTY BR 1
1 21 PLANT SYS BR 1
22 EEB 1
1 23 EFLT TRTSYS 1
24 BRINKMAN 1
3LPDR 1
4 NSIC i
1 5 EPB-DOR 2
2 OELD i
EXTERNAL: 16 ACRS 16 1
EAJCL ra F/LES A/L P
LPagR TE R 1 N ER C-EU D L TUrAL NUMBER OF COPIES REGUIRED: LTTR 40 ENCL 4-~*~
DUKE POWER COMPANY POWER BUILDING 422 SOUTH CHURCH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKERJR.
ViCE PRESIDENT December 27, 1979 TELEPHONE: AREA 704 STEAM PRODUCTION 373-4083' Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. R. W. Reid, Chief Operating Reactors Branch #4 Re:
Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Sir:
As requested by Mr. Harrell G. Eisenhut's letter of October 10, 1979, please find enclosed the Emergency Plan for the Oconee Nuclear Station. This document was revised in accordance with the format and content of Regulatory Guide 1.101 and other regulatory positions recently released.
It is expected that further revisions to this emergency plan will be necessary as a result of the NRR review team site visit and changing regu latory requirements. Therefore, we would propose to implement the revised emergency plan thirt (30) days following NRC approval of the plan.
V y truly yours/
William 0. Parker, Jr.
RLG/sch Attachment O94 Ais
- 09. ?OG F~.S.'
Anniversary.
8001 o3oj