ML15245A146

From kanterella
Jump to navigation Jump to search
Forwards Steam Generator Insp Plan for Upcoming Nov 1979 Refueling Outage
ML15245A146
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/08/1979
From: Parker W
Duke Power Co
To: Reid R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML15245A147 List:
References
NUDOCS 7911150265
Download: ML15245A146 (2)


Text

REGULATOR*NFORMATION DISTRIBUTION EM (RIDS)

ACCESSION N8R:7911150265 DOCDATE: 79/11/08 NOTARIZED: NO DOCKET #

FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.

05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.

050P1771) 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.

050b-e8 AUTH,NAME AUTHOR AFFILIATION PARKER8W,0.

Duke Power Co.

  • RECIPNAME RECIPIENT AFFILIATION DENTUNH.R.

Office of Nuclear Reactor Regulation REIDR.W.

Operating Reactors branch 4

SUBJECT:

Forwards steam generator insp plan for upcoming Nov 1979 refueling outage.

DISTRIBUTION CODE: AU01S COPIES RECEIVED:LTR ZVENCL +/-

IZE:

TITLE: GerieralVDistribution for after Issuance of Uperating Lic NOTES:**

'~~~j2~t)

~

0 r ~ ~

~

T 0

~t F-; 5rj-Ainc RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL 10 CODE/NAME LTTR ENCL ACTION:

05 C

-1 7

7 INTERNAL:

1REG FIL 1

1 02 NRC PDR 1

1 12 2

2 14 TA/EDO 1

1 15 CORE PERF BR 1

1 17 ENGR BR 1

1 18 REAC SFTY BR 1

1 19 PLANT SYS BR 1

1 20 EEB 1

1 21 EFLT TRT SYS 1

1 22 8INKmAN 1

1 EPt3-DOR 1

1 OELD 1

0 EXTERNAL: 03 LPDR 1

1 04 NSIC 1

1 23 ACRS 16 16 OTA LT ecB Vi UCIDeL s

TOTAL'NUMBER OF COPIES REQUIRED: LTTR 39 ENCL 38

DUKE POWER COMPANY POWER BUILDING 422 SOUTH CHURCH STREET, CRARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.

VICE PRESIOENT November 8, 1979 TELEP ONE:AREA 704 STEAM PRODUCTION 373-4083 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. R. W. Reid, Chief Operating Reactors Branch No. 4 Re:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

In-response to your letter of October 22, 1979. regarding steam generator tube failures at Oconee, please find attached a descrip tion of the planned inspection program for the upcoming Oconee 1 refueling outage. It is currently anticipated that this outage will begin by November 16, 1979.

Very truly yours, William 0. Parker, Jr.

SRL/sch Attachment A*

d4F th 7911150 Anniversary

'oOWER Ag0