ML15245A146
| ML15245A146 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/08/1979 |
| From: | Parker W Duke Power Co |
| To: | Reid R, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML15245A147 | List: |
| References | |
| NUDOCS 7911150265 | |
| Download: ML15245A146 (2) | |
Text
REGULATOR*NFORMATION DISTRIBUTION EM (RIDS)
ACCESSION N8R:7911150265 DOCDATE: 79/11/08 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co.
05000269 50-270 Oconee Nuclear Station, Unit 2, Duke Power Co.
050P1771) 50-287 Oconee Nuclear Station, Unit 3, Duke Power Co.
050b-e8 AUTH,NAME AUTHOR AFFILIATION PARKER8W,0.
Duke Power Co.
- RECIPNAME RECIPIENT AFFILIATION DENTUNH.R.
Office of Nuclear Reactor Regulation REIDR.W.
Operating Reactors branch 4
SUBJECT:
Forwards steam generator insp plan for upcoming Nov 1979 refueling outage.
DISTRIBUTION CODE: AU01S COPIES RECEIVED:LTR ZVENCL +/-
IZE:
TITLE: GerieralVDistribution for after Issuance of Uperating Lic NOTES:**
'~~~j2~t)
~
0 r ~ ~
~
T 0
~t F-; 5rj-Ainc RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL 10 CODE/NAME LTTR ENCL ACTION:
05 C
-1 7
7 INTERNAL:
1REG FIL 1
1 02 NRC PDR 1
1 12 2
2 14 TA/EDO 1
1 15 CORE PERF BR 1
1 17 ENGR BR 1
1 18 REAC SFTY BR 1
1 19 PLANT SYS BR 1
1 20 EEB 1
1 21 EFLT TRT SYS 1
1 22 8INKmAN 1
1 EPt3-DOR 1
1 OELD 1
0 EXTERNAL: 03 LPDR 1
1 04 NSIC 1
1 23 ACRS 16 16 OTA LT ecB Vi UCIDeL s
TOTAL'NUMBER OF COPIES REQUIRED: LTTR 39 ENCL 38
DUKE POWER COMPANY POWER BUILDING 422 SOUTH CHURCH STREET, CRARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.
VICE PRESIOENT November 8, 1979 TELEP ONE:AREA 704 STEAM PRODUCTION 373-4083 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. R. W. Reid, Chief Operating Reactors Branch No. 4 Re:
Oconee Nuclear Station Docket Nos. 50-269, -270, -287
Dear Sir:
In-response to your letter of October 22, 1979. regarding steam generator tube failures at Oconee, please find attached a descrip tion of the planned inspection program for the upcoming Oconee 1 refueling outage. It is currently anticipated that this outage will begin by November 16, 1979.
Very truly yours, William 0. Parker, Jr.
SRL/sch Attachment A*
d4F th 7911150 Anniversary
'oOWER Ag0