Forwards Proprietary BAW-1661 P, Mark B2 Demonstration Assemblies in Oconee 1,Cycles 7,8 & 9. Rept Available in Central Files Only.Withholding Per 10CFR2.790 Requested. Nonproprietary Version to Be Submitted by 810430ML15238B331 |
Person / Time |
---|
Site: |
Oconee |
---|
Issue date: |
04/10/1981 |
---|
From: |
Taylor J BABCOCK & WILCOX CO. |
---|
To: |
Stolz J NRC |
---|
Shared Package |
---|
ML15238B332 |
List: |
---|
References |
---|
NUDOCS 8104230207 |
Download: ML15238B331 (10) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155D2651998-10-23023 October 1998 Expresses Appreciation for Supporting Commission Initiative in Issuing Recent Statement of Policy on Conduct of Adjudicatory Proceedings.Case-specific Orders Were Issued in Calvert Cliffs & Oconee License Renewal Proceedings ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc ML20153D1831998-09-17017 September 1998 Ack Receipt of of Duke Energy Co Inviting Reconsideration of Denial by NRC CFO of Duke Exemption Request from Annual Fee Requirements for General License Under 10CFR171.11(d) ML20151S7501998-08-31031 August 1998 Provides Update on Commitment Made by Licensee in Response to NOV & Imposition of Civil Penalty Re Valves in Ldst Instrument Lines That Were Incorrectly Translated Into Station Procedures ML20237B0871998-08-11011 August 1998 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 981007.Sample Registration Ltr Encl ML20236V9581998-07-27027 July 1998 Forwards Corrected Pages 3.5-30b of 961211 & 3.16-2 of 970205 TS Bases.Old Amend Numbers Were Left on Pages.Rev Changes Footer on Both Pages to Reflect Bases Changes ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML20153D1961998-07-0909 July 1998 Requests NRC Reconsider & Grant Util Request for Exemption from Duplicative License Fee Under 10CFR171.11(d) for Storage of Spent Nuclear Fuel at Oconee Nuclear Station ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20247G0881998-05-14014 May 1998 Provides Rev 2 to Section 3.3, Instrumentation, in Support of TS-362 Amend Request.Position on Testing of Analog Trip Type Instruments W/Regard to Transition from CTS to ITS, Restated.Summary Description of Its/Bases Changes,Encl 05000269/LER-1998-002, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown1998-04-30030 April 1998 Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown ML20217G0351998-03-26026 March 1998 Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence ML20203J9301998-02-26026 February 1998 Submits Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Suppl 1 to Bulletin Attached & Contains Listed Commitments ML20199J7441998-02-0202 February 1998 Responds to NRC Bulletin 96-004 for NUHOMS-24P Sf Storage Sys Used at Plant Site.Nrc Reviewed Response & Found Response to Be Acceptable ML20198K9321998-01-13013 January 1998 Ack Receipt of Requesting Exemption from 10CFR171 for ISFSI License SNM-2503 & General License Provisions of 72.214 ML20198M9361998-01-12012 January 1998 Responds to Request That rept,BAW-2303P,rev 3 Be Considered Exempt from Mandatory Public Disclosure.Determined That Info Sought to Be Withheld Contains Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20203C8481997-12-10010 December 1997 Forwards Emergency Response Data Sys Implementation Documents for Plants.W/O Encl 05000269/LER-1997-003, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action1997-11-12012 November 1997 Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action ML20198Q5741997-11-0303 November 1997 Provides Suppl to Initial 971020 Application for Amend to TS Re SG Tubing Surveillance Requirements,In Response to NRC 971030 Request for Addl Info.Proprietary Rev 3 to BAW-2303P, OTSG Repair Roll Qualification Rept Encl.Rept Withheld ML20211P1591997-10-17017 October 1997 Ack Receipt of & Check for $330,000 in Payment for Civil Penalty.Corrective Actions Will Be Examined During Future Insp ML20217D7261997-10-0101 October 1997 Informs That Staff Intends to Use Working Draft SRP-LR as Aid in Reviewing License Renewal Submittals Received from Dpc,Other Licensees & Owners Groups.Policy Issues Will Be Referred to Commission for Resolution ML20211F7981997-09-25025 September 1997 Submits Response to Violations Noted in Insp Repts 50-269/97-10,50-270/97-10 & 50-287/97-10 & Proposed Imposition of Civil Penalty in Amount of $330,000.Corrective Actions:Ldst Instrument Mods on All Three Units Completed ML20217D9341997-09-22022 September 1997 Informs That NRC Staff Has Accepted Deferral of Completion of Certain Actions Requested by Bulletin 96-03, Potential of Plugging of ECCS Strainers by Debris in Boiling Water Reactor ML20211C8021997-09-18018 September 1997 Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error ML20210T7121997-09-0404 September 1997 Informs That Representatives from Oconee Who Compose LERs Would Like to Meet W/Staff & AEOD at Convenient Place & Time to Facilitate Process.Concerns Addressed in Encl ML20216G5821997-09-0404 September 1997 Informs That 970730 Submittal Re Oconee Nuclear Station, Units 1,2 & 3 Will Be Marked Proprietary & Being Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEC Act of 1954 IR 05000269/19970071997-08-27027 August 1997 Discusses Insp Repts 50-269/97-07,50-270/97-07,50-287/97-07, 50-269/97-08,50-270/97-08 & 50-287/97-08 on 970606 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000 ML20210N1531997-08-13013 August 1997 Confirms 970807 Telcon Between J Burchfield & R Carroll Re Management Meeting to Be Conducted at Oconee Nuclear Station on 970922.Purpose of Meeting to Discuss Oconee Emergency Power Project Initiatives ML20210M8381997-08-13013 August 1997 Confirms Conversation Between J Burchfield & R Carroll on 970807 Re Mgt Meeting to Be Conducted in Region II Ofc on 971113.Meeting to Discuss Status of Plant Performance Improvement Initiatives ML20210N1121997-08-12012 August 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 971008. Facililty Must Submit Either Ltr Indicating No Candidates Scheduled to Participate or Listing Names of Candidates ML20149J4841997-07-21021 July 1997 Forwards Addl Pages to Rev 5 to Duke Power Co Nuclear Security & Contingency Plan. Encl Withheld 1999-08-10
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML20198Q8971998-12-17017 December 1998 Expresses Concerns Re License Renewal of Duke Energy,Oconee Nuclear Station,Units 1,2 & 3.Commends NRC on Steps Agency Has Undertaken to Conclude Renewal Process.With Certificate of Svc.Served on 990107 05000269/LER-1998-012, Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date1998-12-0303 December 1998 Forwards LER 98-012-01,re RB Spray Pumps Being Declared Inoperable Due to Npsh.Rept Has Been Revised to Indicate Results of Testing & Corrective Actions Taken to Date 05000269/LER-1998-013, Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 9812021998-11-0202 November 1998 Forwards LER 98-013-00 Re Condition Prohibited by Ts,Per 10CFR50.73(a)(1)(d).Circumstances & Causes for Event Have Not Been Fully Determined & Will Be Provided in Supplemental LER on or Before 981202 ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154A8971998-09-30030 September 1998 Requests That Submitted Info Be Attached to Amends to Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew Operating Licenses for Units 1,2 & 3 ML20154B9421998-09-30030 September 1998 Amends Chattooga River Watershed Coalition Petition to Intervene in Proceedings Re Application of Duke Energy Corp to Renew OLs for Oconee Nuclear Station,Units 1,2 & 3 ML20153H6881998-09-27027 September 1998 Requests Consideration of Motion to Enlarge Time Required to Submit Amended Petition to Intervene in Proceeding Re Application of Duke Energy Corp to Renew OLs for Facilities ML20153E4721998-09-24024 September 1998 Forwards Notices of Appearances for Attorneys Representing Duke Energy Corp,Applicant in Proceeding for License Renewal of Oconee Units 1,2 & 3.With Certificate of Svc ML20151S7501998-08-31031 August 1998 Provides Update on Commitment Made by Licensee in Response to NOV & Imposition of Civil Penalty Re Valves in Ldst Instrument Lines That Were Incorrectly Translated Into Station Procedures ML20236V9581998-07-27027 July 1998 Forwards Corrected Pages 3.5-30b of 961211 & 3.16-2 of 970205 TS Bases.Old Amend Numbers Were Left on Pages.Rev Changes Footer on Both Pages to Reflect Bases Changes ML20153D1961998-07-0909 July 1998 Requests NRC Reconsider & Grant Util Request for Exemption from Duplicative License Fee Under 10CFR171.11(d) for Storage of Spent Nuclear Fuel at Oconee Nuclear Station ML20247G0881998-05-14014 May 1998 Provides Rev 2 to Section 3.3, Instrumentation, in Support of TS-362 Amend Request.Position on Testing of Analog Trip Type Instruments W/Regard to Transition from CTS to ITS, Restated.Summary Description of Its/Bases Changes,Encl 05000269/LER-1998-002, Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown1998-04-30030 April 1998 Forwards LER 98-002-01 Re non-isolable Weld Leak on Pressurizer Surge Line Drain Pipe Which Resulted in Unit Shutdown ML20217G0351998-03-26026 March 1998 Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence ML20203J9301998-02-26026 February 1998 Submits Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Suppl 1 to Bulletin Attached & Contains Listed Commitments 05000269/LER-1997-003, Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action1997-11-12012 November 1997 Forwards LER 97-003-01 Re post-LOCA Boron Dilution Design Basis Not Being Met.Rept Includes Updated Info & Revised Corrective Action ML20198Q5741997-11-0303 November 1997 Provides Suppl to Initial 971020 Application for Amend to TS Re SG Tubing Surveillance Requirements,In Response to NRC 971030 Request for Addl Info.Proprietary Rev 3 to BAW-2303P, OTSG Repair Roll Qualification Rept Encl.Rept Withheld ML20211F7981997-09-25025 September 1997 Submits Response to Violations Noted in Insp Repts 50-269/97-10,50-270/97-10 & 50-287/97-10 & Proposed Imposition of Civil Penalty in Amount of $330,000.Corrective Actions:Ldst Instrument Mods on All Three Units Completed ML20211C8021997-09-18018 September 1997 Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error ML20210T7121997-09-0404 September 1997 Informs That Representatives from Oconee Who Compose LERs Would Like to Meet W/Staff & AEOD at Convenient Place & Time to Facilitate Process.Concerns Addressed in Encl ML20149J4841997-07-21021 July 1997 Forwards Addl Pages to Rev 5 to Duke Power Co Nuclear Security & Contingency Plan. Encl Withheld ML20141F1381997-06-25025 June 1997 Forwards Rev 4 to Nuclear Security Training & Qualification Plan, Per 10CFR50.4 ML20140C9531997-06-0303 June 1997 Requests NRC Approval of Amend to Oconee ISFSI to Obtain Commission Approval of Proposed Rev 6 to Encl Physical Security Plan.W/O Encls ML20148C8621997-05-22022 May 1997 Informs That TR BAW-2241P Will Be Ref in Future Submittals of P/T Limit Curve Revs for B&W Plants as Result of 970519 Telcon Between L Lois & J Taylor ML20141K1981997-05-19019 May 1997 Forwards Rev 6 to Duke Power Co Nuclear Security & Contingency Plan.Encl Withheld,Per 10CFR73.21 ML20138G8981997-04-30030 April 1997 Forwards Rev 5 to DPC Security & Contingency Plan.Encl Withheld ML20138B3421997-04-22022 April 1997 Submits Response to Request for Addl Info Re Proposed Amend to Reactor Bldg Structural Integrity Tech Specs.Info Provided in Attachments 2 & 3 Supersedes Revised Pages & Markup Pages in Attachment 1 & 2,respectively ML20137N0231997-03-26026 March 1997 Forwards Revised TS 3.1.6 Bases Pages Deleting Detection Time of Reactor Bldg Air Particulate Monitor for RCS Leak of 1 Gpm ML20137B4731997-03-12012 March 1997 Forwards Rev 3 to Security Training & Qualification Plan.Rev Withheld,Per 10CFR73.21 ML20134P3831997-02-18018 February 1997 Submits Clarification of Design Basis Requirements at ONS for Permanently Installed Insulation in Response to NRC Bulletin 93-002, Debris Plugging of Emergency Core Cooling Suction Strainers ML20138L2101997-02-14014 February 1997 Forwards Monthly Operating Repts for Jan 1997 for Oconee Nuclear Station,Units 1,2 & 3 & Revised Monthly Operating Status Repts for Dec 1996 ML20134G5511997-02-0404 February 1997 Requests Exemption to Requirements of 10CFR70.24 Re Criticality Accident Monitoring,Per 10CFR70.14(a) & 70.24(d) ML20133M5971997-01-13013 January 1997 Forwards Revs to Oconee Selected Licensee Commitments Manual ML20138G8411996-12-26026 December 1996 Submits Supplementatl Info Re Emergency Power Engineered Safeguards Functional Test Amend Request ML20132F0911996-12-17017 December 1996 Forwards Response to 961212 & 13 Telcons Re Amend to Licenses for Proposed Changes to Updated Final Safety Analysis Rept Re one-time Emergency Power Engineered Safeguards Functional Test 05000269/LER-1996-008, Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability1996-10-31031 October 1996 Forwards Suppl to LER 96-008 Concerning Missed Valve Surveillance Which Resulted in Borated Water Storage Tank Technical Inoperability ML20134H2231996-10-30030 October 1996 Forwards Revised TS 3.7 Bases,Indicating Info Deleted ML20129B2571996-10-16016 October 1996 Submits Addl Info Re 960220 Application for Amends to Licenses DPR-38,DPR-47 & DPR-55 Concerning Proposed Rev to Chemistry TS Sections 3.1.5,3.1.10 & 4.1,in Response to NRC Telcon Request.Revised TS Pages Encl ML20128H2731996-09-19019 September 1996 Forwards Public Version of Rev 96-06 to Plant Emergency plan.W/961003 Release Memo ML20117D5691996-08-23023 August 1996 Requests Exemption for Ons,Units 1 & 2 & Cns,Units 1 & 2 Iaw/Provisions of 10CFR73.5, Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage ML20116F0051996-08-0101 August 1996 Forwards Corrected Page for Proposed Amend to TS Re Removal of Es Signal from Valves LPSW-4 & LPSW-5 ML20117E6031996-06-26026 June 1996 Forwards Public Version of Change 2 to RP/0/B/1000/01, Emergency Classification & Change 4 to RP/0/B/1000/22, Procedures for Site Fire Damage Assessment & Repair ML20112A0581996-05-14014 May 1996 Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment ML20115C4371996-05-13013 May 1996 Responds to NRC Bulletin 96-02, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, ML20117D4931996-04-24024 April 1996 Submits Clarification of Reporting Requirements Under 10CFR50.72(b)(2)(vi) ML20107K4991996-04-19019 April 1996 Forwards Rev 2 to Security Training & Qualification Plan. Changes Identified in Rev 2 Do Not Decrease Effectiveness of Plan & Thereby Submitted,Per 10CFR50.54(p),(2).Rev Withheld, Per 10CFR73.21 ML20108C7031996-04-18018 April 1996 Forwards Public Version of Rev 96-03 to Vol B of Epips, Including Cover Sheet,Table of Contents Page 1,change 7 to CP/1&2/A/2002/05 & Change 6 to CP/3/A/2002/05 1999-07-15
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML19324C3151989-02-20020 February 1989 Informs of Change in Vendor Plans for Inspecting Fuel Rods Containing Fuel Pellets Supplied by Ge.Ultrasonic Insp of Fuel Rods at Oconee 1 Found No Failed Rods in three-cycle, Discharged Fuel Assemblies ML20133C1961985-10-0101 October 1985 Submits Verification Results for Serial Numbers on Each Irvsp Capsule in Lynchburg Research Ctr Storage Pool,Per Rev 2 to BAW-1543 ML20094C1431984-07-24024 July 1984 Forwards Extension of Retainer Lifetime to Four Cycles, for Oconee,Unit 3 W/Results of Exams of Two Retainers After Three Cycles.Approval of four-cycle Retainer Usage Requested Before Dec 1984 ML15238A8901983-07-12012 July 1983 Forwards Proprietary Gadolinia-Bearing Lead Test Assemblies Design Rept. Info Includes Design,Testing & Analysis for Five Lead Test Assemblies w/12 gadolina-bearing Fuel Rods to Be Loaded in Cycle 8.Rept Withheld (Ref 10CFR2.790) ML20041E7641982-02-19019 February 1982 Forwards Proprietary NPGO-TM-585, PCRIT-Critical Pressure Calculation - Linear Elastic Fracture Mechanics Analysis, Dtd Nov 1981 & Referenced in Thermal Shock Rept on Facility. Affidavit Encl.Rept Withheld (Ref 10CFR2.790) ML20010E2161981-08-11011 August 1981 Discusses Recent Reactor Internals Bolt Problems Observed During Plant 10-yr Insp & Documented in Repts Dtd 810724 & 0805.Provides Addl Info Re Potential Applicability of Bolt Problems to Other Operating Plants.Insps Continuing ML15238B3311981-04-10010 April 1981 Forwards Proprietary BAW-1661 P, Mark B2 Demonstration Assemblies in Oconee 1,Cycles 7,8 & 9. Rept Available in Central Files Only.Withholding Per 10CFR2.790 Requested. Nonproprietary Version to Be Submitted by 810430 ML19322B3141979-04-27027 April 1979 Requests Continuance of Facility Operations Through High Demand Season Beginning in June 1979 ML19317F1561974-03-27027 March 1974 Forwards BAW-1400, Fuel Densification Rept. W/O Encl ML19316A2021973-12-0404 December 1973 Forwards B&W Rept BAW-1339, Oconee 3 Fuel Densification Rept, to Be Incorporated by Util in License Application by Separate Ltr.Requests Withholding of Rept (Ref 10CFR2.790). W/O Encl ML19322B6961973-07-16016 July 1973 Forwards B&W Rept BAW-1388, Oconee 1 Fuel Densification Rept, Revision 1 (Nonproprietary Version of BAW-1387, Revision 1) ML19316A0391973-01-15015 January 1973 Forwards Description & Mechanical Design of Core Flooding Nozzle Flow Restrictor,Analysis of Core Flooding Line Break W/Flow Restrictor in Place & Charts Showing Effect of Device on ECCS Operation for Both Large & Small Breaks ML19312C8051968-01-22022 January 1968 Requests Addl Info on Facility on Behalf of Div of Reactor Licensing 1989-02-20
[Table view] |
Text
REGULAWORY INFORMA;ION DISTRIBUTI(SYSTEMA(RIDS)
ACCESSION NBR:8104230207 DOC.DATE: 81/04/10 NOTARIZED: YES DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit to Duke Power Co,. 05000269 AUTHNAME AUTHOR AFFILIATION TAYLOR,J.H. Sabcock & Wilcox Co.
RECIP.NAME RECIPIENT AFFILIATION STOLZJ. Office of Nuclear Reactor Regulation, Director:
SUBJECT:
Forwards proprietary BAW*1661 P, "Mark B2 Demonstration Assemblies in Oconee 1,Cycles 7,8 & 9." Withhold per 10CFR2,790 requestedAffidavit encl.Nonproprietary version to be submitted by 810430. _C &'47 4-' ygr 4tA"'
DISTRIBUTION CODE: PA01S COPIES RECEIVED:LTR .1ENCLd Se TITLE: Proprietary Review Distribution - OL Stage NOTES:AEODOrnstein:1icc. 05000269 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMEi LTTR FNL ID CODE/NAME LTTR E."
ACTION: ORB # 02 7 7 INTERNAL: I&E#/p-// 09 2 N 1 0 OELD 1 0ILE1 I EXTERNAL: ACRS l// 1 19 16 LPDR 1 NSIC 1 c~<s \
0 \ H.S I CBC APR 2 199, 0
TOTAL NUMBER OF COPIES REQjUIRED: LTTR 31 ENCL
Babcock & Wilcox Nuclear Power Generation Division a McDermott company 3315 Old Forest Road P.O. Box 1260 Lynchburg, Virginia 24505 (804) 384-5111 April 10, 1981 Mr. John Stolz, Chief LWR Branch, Division of Project Management AR2218 Office of Nuclear Reactor Regulation VI C M7SgWL,4oaW U. S. Nuclear Regulatory Commission ,1 Washington, DC 20555
Dear Mr. Stolz:
Enclosed are 60 copies of Babcock & Wilcox report BAW-1661 P, "Mark BZ Demonstration Assemblies in Oconee 1, Cycles 7, 8, and 9."
Babcock and Wilcox requests in accordance with 10 CFR 2.79 that this report be considered proprietary. The reason for this classification is given in the attached affidavit. We will be submitting a non-proprietary version of the report by the end of the month.
If you have any questions, please call Mr. C. F. McPhatter on Extension 2401.
V truly yours, J. H. Taylor Manager, Licensing JHT/fw cc: Mr. R. B. Borsum - B&W Bethesda Office
?Ao/
810.42300%
Babcock&Wilcox AFFIDAVIT OF JAMES H. TAYLOR A. My name is James H. Taylor. I am Manager of Licensing in the Nuclear Power Generation Division of Babcock & Wilcox, and as such I am authorized to execute this Affidavit.
B. I am familiar with the criteria applied by Babcock & Wilcox to de termine whether certain information of Babcock & Wilcox is proprietary and I am familiar with the procedures established within Babcock & Wilcox, particularly the Nuclear Power Generation Division (NPGD), to ensure the proper application of these criteria.
C. In determining whether a Babcock & Wilcox document is to be classi fied as proprietary information, an initial determination is made by the unit manager who is responsible for originating the document as to whether it falls within the criteria set forth in Paragraph D hereof. If the information falls within any one of these criteria, it is classified as proprietary by the originating unit manager.
This initial determination is reviewed by the cognizant section manager. If the document is designated as proprietary, it is re viewed again by Licensing personnel and other management within NPGD as designated by the Manager of Licensing to assure that the regulatory requirements of 10 CFR Section 2.790 are met.
D. The following information is provided to demonstrate that the pro visions of 10 CFR Section 2.790 of the Commission's regulations have been considered:
(i) The information has been held in confidence by the Babcock &
Wilcox Company. Copies of the document are clearly identified as proprietary. In addition, whenever Babcock & Wilcox transmits theinformation to a customer, customer's agent, potential customer or regulatory agency, the transmittal re quests the recipient to hold the information as proprietary.
Also, in order to strictly limit any potential or actual customer's use of proprietary information, the following
Babcock&Wilcox AFFIDAVIT OF JAMES H. TAYLOR (Cont'd) provision is included in all proposals submitted by Babcock
& Wilcox, and an applicable version of the proprietary provision is included in all of Babcock & Wilcox's contracts:
"Purchaser may retain Company's Proposal for use in connection with any contract resulting therefrom, and, for that purpose, make such copies thereof as may be necessary. Any proprietary information concerning Company's or its Suppliers' products or manufacturing processes which is so designated by Company or its Suppliers and disclosed to Purchaser incident to the performance of such contract shall remain the property of Company or its Suppliers and is disclosed in confi dence, and Purchaser shall not publish or otherwise disclose it to others without the written approval of Company, and no rights, implied or otherwise, are granted to produce or have produced any products or to practice or cause to be practiced any manufacturing processes covered thereby.
Notwithstanding the above, Purchaser may provide the NRC or any other regulatory agency with any such pro prietary information as the NRC or such other agency may require; provided, however, that Purchaser shall first give Company written notice of such proposed disclosure and Company shall have the right to amend such proprietary information so as to make it non-pro prietary. In the event that Company cannot amend such proprietary information, Purchaser shall, prior to disclosing such information, use its best efforts to obtaina commitment from NRC or such other agency to have such information withheld from public inspection.
(2)
Babcock&Wilcox AFFIDAVIT OF JAMES H. TAYLOR (Cont'd)
Company shall be given the right to participate in pursuit of such confidential treatment."
(ii) The following criteria are customarily applied by Babcock &
Wilcox in a rational decision process to determine whether the information should be classified as proprietary. Information may be classified as proprietary if one or more of the following criteria are met.
- a. Information reveals cost or price information, commercial strategies, production capabilities, or budget levels of Babcock & Wilcox, its customers or suppliers.
- b. The information reveals data or material concerning Babcock
& Wilcox research or development plans or programs of present or potential competitive advantage to Babcock &
Wilcox.
- c. The use of the information by a competitor would decrease his expenditures, in time or resources, in designing, producing or marketing a similar product.
- d. The information consists of test data or other similar data concerning a process, method or component, the application or which results in a competitive advantage to Babcock &
Wilcox.
- e. The information reveals special aspects of a process, method, component or the like, the exclusive use of which results in a competitive advantage to Babcock & Wilcox.
- f. The information contains ideas for which patent protection may be sought.
(3)
Babcock&Wilcox AFFIDAVIT OF JAMES H. TAYLOR (Cont'd)
The document(s) listed on Exhibit "A", which is attached hereto and made a part hereof, has been evaluated in accordance with normal Babcock & Wilcox procedures with respect to classification and has been found to contain information which falls within one or more of the criteria enumerated above. Exhibit "B", which is attached hereto and made a part hereof, specifically identifies the criteria applicable to the document(s) listed in Exhibit "A".
(iii) The document(s) listed in Exhibit "A", which has been made avail able to the United States Nuclear Regulatory Commission was made available in confidence with a request that the document(s) and the information contained therein be withheld from public disclosure.
(iv) The information is not available in the open literature and to the best of our knowledge is not known by Combustion Engineering, EXXON, General Electric, Westinghouse or other current or potential domestic or foreign competitors of B&W.
(v) Specific information with regard to whether public disclosure of the information is likely to cause harm to the competitive position of Babcock & Wilcox, taking into account the value of the information to Babcock & Wilcox; the amount of effort or money expended by Babcock & Wilcox developing the information; and the ease or difficulty with which the information could be properly duplicated by others is given in Exhibit "B".
E. I have personally reviewed the document(s) listed on Exhibit "A" and have found that it is considered proprietary by Babcock & Wilcox because it contains information which falls within one or more of the criteria enumerated in Paragraph D, and it is information which is customarily held in confidence and protected as proprietary in formation by Babcock & Wilcox. This report comprises.information utilized by Babcock & Wilcox in its business which afford Babcock
& Wilcox an opportunity to obtain a competitive advantage over (4)
Babcock&Wilcox those who may wish to know or use the information contained in the document(s).
SJAMES H. TAYR State of Virginia)
) SS. Lynchburg City of Lynchburg)
James H. Taylor, being duly sworn, on his oath deposes and says that he is the person who subscribed his name to the foregoing state ment, and that the matters and facts set forth in the statement are true.
JAMES H. TAYLO Subscribedjnd sworn before-me this /4 day of 1981.
Notary Public in and or the City of Lynchburg, State of Virginia My Commission Expires c , /9'/
(5)
Babcock&Wilcox EXHIBIT "A" Proprietary Document - BAW-1661 P, Mark BZ Demonstration Assemblies in Oconee 1, Cycles 7, 8, and 9.
Babcock&Wilcox Exhibit "B" Identification of proprietary information deleted for this report Section Page Description Applicable Criteria 2 3 Spacer Grid Comparison Figure C 4 7 Changes in Form Loss Coefficients C 5 9 Change in Form Loss Coefficient C
9 .
OCCET NO. 5O -026e DATE:
NOTE TO NRC AND/OR LOCAL PUBLIC 0OCUMENT ROOMS The following item submitted with letter dated------
from --
is being withheld from public disclosure in accordance with Section 2.790.
PROPRIETARY INFORMATION
- ct4*ek & D ,4sx~wseA Distribution Services Branch