Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML111670757 | 20 July 1978 | Comments on IE Insp Rept 50-305/79-09 Re Reactor Cavity Radiation Exposure Incident.Operational Personnel Followed Procedures Found Acceptable by NRC & Too Much Emphasis Placed on Dose Received | |
ML111670887 | 15 August 1978 | Responds to IE Insp Rept 78-07 of Subj Facility Oper Lic DPR -43 Reactor Vessel Cavity Exposure Incident 780502 Rejects Reported Lack of Procedural Control & Supervisor Intimidation, Claiming Personnel Error | |
ML111671011 | 22 October 1981 | Forwards Public Version of Original & Revision a to Emergency Plan Implementing Procedure EP-AD-2 Re Emergency Class Determination.Original Was Misdated,Through Administrative Error,As 810822 | |
ML111671014 | 31 July 1981 | Forwards Public Version of Implementing Procedures for Emergency Plan W/Private & Proprietary Matl Deleted Per NRC Generic Ltr 81-27.Public Info Emergency Response Plan Should Be Withheld | |
ML111671021 | 2 July 1981 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & ECD 16.2 Re Emergency Operations Facility Activation | |
ML111671024 | 27 February 1981 | Forwards Public Version of Radiological Emergency Response Plan Implementing Procedures,Description of Meteorological Monitoring Sys Implementation,Public Info & Revised Evacuation Time Estimates | |
ML111671028 | 3 June 1981 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure | |
ML111671056 | 28 January 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures EP-OSF-1 Re Operational Support Facility Emergency Organization & EP-OSF-3 Re Work Requests During Emergency | |
ML111671064 | 18 February 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-AD-1 Re Plant Emergency organization,EP-ENV-5C Re Sam II Operation & EP-EOF-4 Re Corporate Response to Alert | |
ML111671073 | 3 March 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation | |
ML111671090 | 15 April 1982 | Forwards Public Version of Revision a to Emergency Plan Implementing Procedures EP-RET-2F, Personnel Decontamination. | |
ML111671096 | 4 May 1982 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert | |
ML111671100 | 26 May 1982 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-ENV-3B Re Environ Monitoring Team Actions & EP-ENV-4A Re Sample Acquisition,Portable Instrument Use | |
ML111671108 | 30 June 1982 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-17 Re Communications & EP-RET-3C Re post-accident Operation of High Radiation Sample Room | |
ML111671113 | 26 July 1982 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Revision E to Procedure EP-ENV-3A, Environ Protection Director Actions & Directives. | |
ML111671146 | 10 January 1983 | Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-1, Plant Emergency Organization & EP-OP-3, Control Room Communications. | |
ML111750539 | 19 October 1979 | Forwards Proposed Tech Spec Amend 40 Re Fire Protection | Fire Barrier Hydrostatic Fire Watch Hourly Fire Watch |
ML111750718 | 21 July 1982 | Forwards Updated FSAR for Kewaunee Nuclear Power Plant,Vols 1-6 | |
ML17230A366 | 18 March 1999 | Forwards Listed Nelia Insurance Policy Endorsements for Kewaunee Nuclear Power Plant,Per Requirements of 10CFR140.15 | |
ML18065B008 | 14 October 1996 | Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld | |
ML19211C434 | 4 January 1980 | Forwards Addl Info Re Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790) | |
ML19225C455 | 26 July 1979 | Forwards Modified Physical Security Plan.Plan Withheld (Ref 10CFR2.790) | |
ML19247A756 | 11 June 1979 | Responds to NRC 790518 Ltr Re Violations Noted in IE Insp Rept 50-305/79-04.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML19256A910 | 19 December 1978 | Responds to Noncompliance Noted in Insp Rept 50-305/78-21 Re Inservice Insp Program.Corrective Action:Establishment of Pump Vibration Reference Values for Routinely Operated Pumps, & Revision of Tech Spec Re Full Pump Stroke Values | Stroke time |
ML19257A356 | 19 November 1979 | Requests Background Info & Procedure Re NRC Generic Proceeding to Reassess Radwaste Disposal | |
ML19257C316 | 20 November 1979 | Submits Comments on NUREG-0553, Beyond Defense-In-Depth. Inappropriate to Expect Nuclear Industry to Completely Fund State & Local Govt Emergency Planning Efforts | |
ML19261B642 | 23 February 1979 | Util Has Not Received Approval of Proposed Security Plan But Has Proceeded W/Major Mod & Procedure Development Effort. Attachment Addresses Status of Plant Re Security Requirements.Plan Withheld (Ref 10CFR2.790) | |
ML19262C081 | 14 December 1979 | Responds to NRC 791121 Ltr Re Violations Noted in IE Insp Rept 50-305/79-18.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML19263C630 | 26 December 1978 | Forwards State of Wi Answers to Licensee'S First Set of Interrogatories | |
ML19289C351 | 6 December 1978 | Requests Info Re Reliability of Neutron Absorber Plate Proposed for Use at Facility & Why This Info Has Been Classified Proprietary.Questions Licensee'S Request for Payment for Documents | |
ML19289C866 | 5 January 1979 | Reaffirms Intentions of co-intervenors Lakeshore Citizens & Safe Haven to Expedite Proceedings Re Storage of Spent Fuel. Intervenors Are Prepared to Negotiate Settlement Agreement | |
ML19289D129 | 23 January 1979 | Informs of Wi Public Svc Corp'S Opposition to NRC Motion for Extension of Time for Response to Pending Motion Due to Desire for Timely Consideration of Merits | |
ML19289D130 | 22 January 1979 | Informs of Wi Public Svc Corp'S Opposition to Extension of Time Requested by co-intervenors on 790118 | |
ML19289D148 | 18 January 1979 | Co-intervenors' Request for 30-day Extension of Time to Respond to Applicant'S Motion for Summary Disposition.Svc List Encl | |
ML19290C497 | 21 December 1979 | Comments on Proposed Rule 10CFR73:improper to Use Sabotage Threat as Basis for Applying Reporting Requirements to Facility Security Systems | Safe Shutdown |
ML19294A319 | 9 August 1978 | Response to IE Inspec Rept#50-305/78-10 During Which 2 Items of Noncompliance Were Noted:Ultra Sonic Testing Couplant Matl Used for UT Exam Was Only Couplant Matl Available & Insvc Records Were Avail | |
ML19294C031 | 29 February 1980 | Forwards LER 80-005/03X-1 | |
ML19309D511 | 11 March 1980 | Responds to IE Bulletin 79-01B.Consistent W/Intent of IE Circular 78-08,IE Bulletin 79-01 & 79-01A,review of Class IE Instrumentation Comparing Qualifications W/Design Specs or FSAR Requirements Shows Addl Requirements Were Met | |
ML19309G148 | 10 April 1980 | Responds to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Forwards Master List of All Equipment Required to Function Under Postulated Accident Conditions | |
ML19323B610 | 22 April 1980 | Responds to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Evaluation of IE Equipment Will Be Completed by Sept | |
ML19323H988 | 11 June 1980 | Informs NRC of Proposed Mod to Limit Containment Purge & Vent Valve Opening to 65 Degrees.Util Is Proceeding W/Mod W/Understanding That NRC Concurs Unless Informed to Contrary by 800612 | |
ML19327A472 | 30 July 1980 | Forwards Revision to Industrial Sabotage Security Manual. Revision Withheld (Ref 10CFR2.790) | |
ML19332A443 | 9 September 1980 | Submits Info Re Status of Evaluation & Mods of Diesel Generator Status Annunciator Sys.Licensee Should Verify That Annunciators Located in Control Room.Diesel Generator Output Breaker Should Be Annunciated in Control Room | |
ML19332E609 | 4 December 1989 | Forwards Rev 1 to Security Manual.Rev Withheld (Ref 10CFR73.21) | |
ML19341B268 | 7 January 1981 | Responds to NRC 801212 Ltr Re Violations Noted in IE Insp Rept 50-305/80-25.Corrective Actions Withheld (Ref 10CFR2.790) | |
ML19345G888 | 13 April 1981 | Forwards LER 81-010/01T-0 | |
ML19346A346 | 26 May 1981 | Responds to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Corbicula & Mytilus Are Not in Vicinity.Methods of Detecting Flow Blockage Will Continue | |
ML19347F577 | 18 May 1981 | Forwards Info Re Security Plan.Info Withheld (Ref 10CFR2.790) | |
ML19347F588 | 8 May 1981 | Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. Investigation of Subj Valves Indicates No Such Valves Used in safety-related Sys or as Spares | |
ML19350B785 | 16 March 1981 | Forwards Revised Security Force Training & Qualification Manual & Responses to Request for Addl Info.Encl Withheld (10CFR2.790) |