Forwards Public Version of Original & Revision a to Emergency Plan Implementing Procedure EP-AD-2 Re Emergency Class Determination.Original Was Misdated,Through Administrative Error,As 810822
ML111671011
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/22/1981
From: Mathews E
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111671010 List:
References
CON-NRC-81-173 NUDOCS 8111040518
Download: ML111671011 (2)


Text

N,)

NRC-81-173 PubliO WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 October 22, 1981 Dr. Harold R. Denton, Director OCT 2 Nuclear Reactor Regulation u U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Emergency Action Level Procedure

Reference:

Immediate Action Letter from James G. Keppler to E. R. Mathews dated June 22, 1981 Pursuant to 10 CFR 50 - Appendix E, Wisconsin Public Service Corporation hereby submits ten copies of the Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedures, attached. By copy of this letter, three copies of these procedures are hereby submitted to Mr. James G. Keppler, Director, US NRC, Region III, Glen Ellyn, Illinois.

As a result of our NRC Emergency Preparedness Inspection, we had committed to develop and implement a procedure for determining Emergency Action Levels; see referenced letter item 8. The attached procedures meet this commitment.

The original procedure (Attachment 1) was misdated, through administrative error, as August 22. The procedure was reviewed and approved by the Plant Operation Review Committee (PORC) on September 22 and is indicated in the PORC meeting minutes. This submittal is, therefore, within the required 30 days following implementation.

86 PDR ADOCK 05000305 F PDR

Dr. Harold Denton October 22, 1981 Page 2 As a result of our continuing effort to upgrade emergency response planning, a revision (Attachment 1) was prepared and implemented. Since the revision was implemented prior to the required submittal date for the original procedure, both procedures are being submitted at this time. Revision A (Attachment 1) will supersede the original (Attachment 2).

Very truly yours, E. R. Mathews, Senior Vice President Power Supply & Engineering snf cc - Mr. Robert Nelson, NRC Resident Inspector Mr. James G. Keppler, NRC - Region III Mr. Jesse Pagliaro, NRC - Region III