Responds to NRC 791121 Ltr Re Violations Noted in IE Insp Rept 50-305/79-18.Corrective Actions Withheld (Ref 10CFR2.790)
ML19262C081
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/14/1979
From: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
To: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19262C080 List:
References
NUDOCS 8001280257
Download: ML19262C081 (2)


Text

[.

Ali ACH:Gii C%IAINS

/ 10 CFR 2.750 (d) llif 01I.1ATIZI WISCONSIN PU BLIC S ERVICE CORPOR ATIO N P.O. Box 1200, Green Bay, Wisconsin 54305 December 14, 1979 Mr. J. A. Hind, Chief Safeguards Branch U. S. Nuclear Regulatory Commission Region III 199 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Hind:

Docket 50-305 Operating License DPR-43 IE Inspection Report No. 79-18 The subject report was issued following an inspection of security measures at the Kewaunee Nuclear Power Plant conducted by Messrs. J. R. Creed and C. A.

Schwan on October 15-19, 1979. Two items identified as infractions and one item identified as a deficiency are cited by this report. My attachment provides our response to these items.

The attachment to this letter is considered exempt from public disclosure according to 10 CFR Section 2.790. It is requested that this document not be placed in the Public Document Room.

Very truly yours, A

E. R. Mathews, Vice President Power Supply & Engineering snf 1816 054 Enc.

.2 ua, 10 CFR 2.M (g) tagg y;37;

-pO@

800128025 7

ryy; 9,' ~ ~ ~ '.y, 10 CFR 2.790(d) Information Exempt From Public Eisclosure Attachment Response to IE Inspection Report No. 79-18 Following the date of this inspection by Messrs. J. R. Creed and C. A. Schwan, Wisconsin Public Service Corporation contracted with a new security services contractor for security activities at the Kewaunee Nuclear Power Plant. The r.cw security contractor has more experience at nuclear power plants and better management and training capabilities than the previous agency.

Although many members of the Kewaunce Plant security guard force transferred companies and remain on the force at Kewaunee, all personnel have received medical examinations from the new contractor that satisfy all requirements.

~

Additionally, the re-emphasis placed on job performance, that comes with such a enange in contractors, is expected to improve the overall guard force p erformance.

The deficiency item on E-field operational checks has been corrected by incorporating a daily E-field zone walk-up into the normal protected area patrol scheduling.