Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert
ML111671096
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/04/1982
From: Mathews E
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111671095 List:
References
CON-NRC-82-73 NUDOCS 8205240053
Download: ML111671096 (2)


Text

NRC-82-73 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 May 4, 1982 MA 711 1982,,

Dr. Harold R. Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR Appendix E, Wisconsin Public Service Corporation hereby submits ten copies of the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan implementing procedures listed below. By copy of this letter, three copies of these procedures are hereby submitted to Mr. James G. Keppler, Director, U. S. NRC, Region III, Glen Ellyn, Illinois.

EP-AD-7 (Rev.

C)

EP-AD-8 (Rev. C)

EP-AD-9 (Rev. C)

EP-AD-10 (Rev.

C)

EP-AD-12 (Rev. B)

EP-AD-17 (Rev. A)

EP-ENV-3A (Rev. D)

EP-ENV-3C (Rev. A)

EP-ENV-3D (Rev.

A) 8205240053 820526 PDR ADOCK 05000305 F

PDR Notification of Unusual Event Notification of Alert Notification of Site Emergency Notification of General Emergency Personnel Assembly and Accountability Communications Environmental Protection Director Actions and Directives Primary Determination of X/Q Alternate Determination of X/Q I0

p.

Dr. Harold R. Denton May 4, 1982 Page 2 EP-EOF-l (Rev. D)

EP-EOF-3 EP-EOF-4 EP-EOF-5 EP-EOF-6 EP-EOF-9 EP-OSF-4 EP-SEC-3 (Rev.

(Rev.

(Rev.

(Rev.

(Rev.

(Rev.

(Rev.

These revised procedures Very truly yours, D)

D)

D)

D)

C)

A)

B) supersede Corporate Staff Emergency Response Organization Corporate Response to an Unusual Event Corporate Response to an Alert Corporate Response to a Site Emergency Corporate Response to a General Emergency Interface with Support Organizations OSF Communications Personnel Accountability (Initial and Maintaining) those previously submitted.

E. R. Mathews Senior Vice President Power Supply & Engineering snf Enc.

cc -

Mr. J. G. Keppler, US NRC -

Region III (3)

Mr. J. Pagliaro, US NRC Mr. Robert Nelson, US NRC Mr.

C. F. Riederer, PSCW