Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures EP-AD-7 Re Notification of Unusual Event & EP-AD-8 Re Notification of Alert
ML111671096
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/04/1982
From: Mathews E
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111671095 List:
References
CON-NRC-82-73 NUDOCS 8205240053
Download: ML111671096 (2)


Text

NRC-82-73 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 May 4, 1982 MA 711 1982,,

Dr. Harold R. Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR Appendix E, Wisconsin Public Service Corporation hereby submits ten copies of the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan implementing procedures listed below. By copy of this letter, three copies of these procedures are hereby submitted to Mr. James G. Keppler, Director, U. S. NRC, Region III, Glen Ellyn, Illinois.

EP-AD-7 (Rev. C) Notification of Unusual Event EP-AD-8 (Rev. C) Notification of Alert EP-AD-9 (Rev. C) Notification of Site Emergency EP-AD-10 (Rev. C) Notification of General Emergency EP-AD-12 (Rev. B) Personnel Assembly and Accountability EP-AD-17 (Rev. A) Communications EP-ENV-3A (Rev. D) Environmental Protection Director Actions and Directives EP-ENV-3C (Rev. A) Primary Determination of X/Q EP-ENV-3D (Rev. A) Alternate Determination of X/Q 8205240053 820526 PDR ADOCK 05000305 I0 F PDR

p.

Dr. Harold R. Denton May 4, 1982 Page 2 EP-EOF-l (Rev. D) Corporate Staff Emergency Response Organization EP-EOF-3 (Rev. D) Corporate Response to an Unusual Event EP-EOF-4 (Rev. D) Corporate Response to an Alert EP-EOF-5 (Rev. D) Corporate Response to a Site Emergency EP-EOF-6 (Rev. D) Corporate Response to a General Emergency EP-EOF-9 (Rev. C) Interface with Support Organizations EP-OSF-4 (Rev. A) OSF Communications EP-SEC-3 (Rev. B) Personnel Accountability (Initial and Maintaining)

These revised procedures supersede those previously submitted.

Very truly yours, E. R. Mathews Senior Vice President Power Supply & Engineering snf Enc.

cc - Mr. J. G. Keppler, US NRC - Region III (3)

Mr. J. Pagliaro, US NRC Mr. Robert Nelson, US NRC Mr. C. F. Riederer, PSCW