 Issue dateTitleTopic
AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 15 October 1984Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1
AECM-85-0045, Final Part 21 & Deficiency Rept Re Possible Failure of Polycarbonate Bowls on Air Filters for Tdi Engine Control Panels.Initially Reported on 850213.Polycarbonate Bowls Replaced W/Metal Bowls18 February 1985Final Part 21 & Deficiency Rept Re Possible Failure of Polycarbonate Bowls on Air Filters for Tdi Engine Control Panels.Initially Reported on 850213.Polycarbonate Bowls Replaced W/Metal Bowls
AECM-85-0094, Part 21 & Interim Deficiency Rept 85/02 Re Tdi Air Start Valve for Emergency Diesel Generator Engine.Initially Reported on 850319.Valves on Both Diesel Generators Replaced & 800 H Limit Placed on Use.Updated Rept by 85042625 March 1985Part 21 & Interim Deficiency Rept 85/02 Re Tdi Air Start Valve for Emergency Diesel Generator Engine.Initially Reported on 850319.Valves on Both Diesel Generators Replaced & 800 H Limit Placed on Use.Updated Rept by 850426
AECM-85-0096, Part 21 & Interim Deficiency Rept 85/30 Re MSIV Failure to Remain in Closed Position Due to Failure of Automatic Switch Co Dual Solenoid.Initially Reported on 850321.Listed Matl Nonconformance Rept Issued.Updated Rept Expected by 85043026 March 1985Part 21 & Interim Deficiency Rept 85/30 Re MSIV Failure to Remain in Closed Position Due to Failure of Automatic Switch Co Dual Solenoid.Initially Reported on 850321.Listed Matl Nonconformance Rept Issued.Updated Rept Expected by 850430
AECM-85-0133, Part 21 & Final Deficiency Rept 85-02 Re Tdi Diesel Generator Air Start Header Check Valve Failure.Design Change Initiated to Replace Eight Existing Check Valves on Div I & II W/Appropriate Check Valves Suitable for Design26 April 1985Part 21 & Final Deficiency Rept 85-02 Re Tdi Diesel Generator Air Start Header Check Valve Failure.Design Change Initiated to Replace Eight Existing Check Valves on Div I & II W/Appropriate Check Valves Suitable for Design
AECM-85-0142, Part 21 & Second Interim Deficiency Rept RD-85/03 Re MSIV Failure to Remain Closed Due to Failure of Automatic Switch Co Dual Solenoid to Transfer When Deenergized.Initially Reported on 850321.Next Rept by 85063030 April 1985Part 21 & Second Interim Deficiency Rept RD-85/03 Re MSIV Failure to Remain Closed Due to Failure of Automatic Switch Co Dual Solenoid to Transfer When Deenergized.Initially Reported on 850321.Next Rept by 850630
AECM-86-0050, Final Part 21 & Deficiency Rept RD-85/04 Re Inadequate Cooling in Tdi Diesel Generator Control Panels.Initially Reported on 850429.Linear Reactors on Panels Replaced & Cooling Air Supply Installed14 February 1986Final Part 21 & Deficiency Rept RD-85/04 Re Inadequate Cooling in Tdi Diesel Generator Control Panels.Initially Reported on 850429.Linear Reactors on Panels Replaced & Cooling Air Supply Installed
AECM-86-0376, Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,Issued25 November 1986Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,IssuedUltimate heat sink
AECM-86-0400, Deficiency Rept Re Wiring in Environmentally Qualified Actuators on air-operated Valves.Initially Reported on 861117.Matl Analysis of Wiring Samples Underway. Reportability Determination Will Be Completed in Jan 198718 December 1986Deficiency Rept Re Wiring in Environmentally Qualified Actuators on air-operated Valves.Initially Reported on 861117.Matl Analysis of Wiring Samples Underway. Reportability Determination Will Be Completed in Jan 1987
AECM-86-0409, Informs That Testing Program for Final Reportability Determination on as-found Conditions of Sealed Splices Delayed Until Feb 1987,per 861212 Telcon.Program Includes Raychem Tube Configurations Found in BWR & PWR Applications19 December 1986Informs That Testing Program for Final Reportability Determination on as-found Conditions of Sealed Splices Delayed Until Feb 1987,per 861212 Telcon.Program Includes Raychem Tube Configurations Found in BWR & PWR Applications
AECM-88-0190, Part 21 Rept Re Diesel Generator Left Bank Intercooler Tubes,Mfg by Imo Delaval.Leaks Initiated When Tubes Ruptured by Diffuser Plate in Inlet Adaptor.Initially Reported on 880930.Intercooler Replaced30 September 1988Part 21 Rept Re Diesel Generator Left Bank Intercooler Tubes,Mfg by Imo Delaval.Leaks Initiated When Tubes Ruptured by Diffuser Plate in Inlet Adaptor.Initially Reported on 880930.Intercooler Replaced
AECM-89-0175, Part 21 Rept Re Failure of MSIV to Close Due to Malfunction of Valve.Initially Reported on 890914.Dual Solenoid Valves on All MSIVs Replaced or Refurbished Prior to Restart.Update to Be Submitted by Startup from Fourth Refueling Outage18 September 1989Part 21 Rept Re Failure of MSIV to Close Due to Malfunction of Valve.Initially Reported on 890914.Dual Solenoid Valves on All MSIVs Replaced or Refurbished Prior to Restart.Update to Be Submitted by Startup from Fourth Refueling Outage
AECM-89-175, Part 21 Rept Re Failure of MSIV to Close Due to Malfunction of Valve.Initially Reported on 890914.Dual Solenoid Valves on All MSIVs Replaced or Refurbished Prior to Restart.Update to Be Submitted by Startup from Fourth Refueling Outage18 September 1989Part 21 Rept Re Failure of MSIV to Close Due to Malfunction of Valve.Initially Reported on 890914.Dual Solenoid Valves on All MSIVs Replaced or Refurbished Prior to Restart.Update to Be Submitted by Startup from Fourth Refueling Outage
AECM-90-0196, Final Part 21 Rept Re Automatic Switch Co MSIVs Failing to Close Upon Demand from Automatic & Remote Manual Actuation Signals.Initially Reported on 890914.Dual Solenoid Valves Replaced W/Two Single Solenoid Valves21 November 1990Final Part 21 Rept Re Automatic Switch Co MSIVs Failing to Close Upon Demand from Automatic & Remote Manual Actuation Signals.Initially Reported on 890914.Dual Solenoid Valves Replaced W/Two Single Solenoid Valves
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
L-91-002, Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl4 January 1991Supplemental Part 21 Rept Re GE Reactor Trip Breakers Used in safety-grade Equipment.Initially Reported on 901228.List of Plants Supplied w/C-E Breakers Encl
LD-93-139, Part 21 Rept Re Error in Input to Large Break LOCA Analysis. Paint Thickness Factor of Ten Larger than Intended Used for One of Walls in Containment.Caused by Wrong Value Transcribed & Used in LOCA Analysis24 September 1993Part 21 Rept Re Error in Input to Large Break LOCA Analysis. Paint Thickness Factor of Ten Larger than Intended Used for One of Walls in Containment.Caused by Wrong Value Transcribed & Used in LOCA Analysis
LD-96-009, Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power15 April 1996Part 21 Rept Re Potential Instrumentation Decalibr at Low Power.Affected Utils Should Ensure That Log Power Channels Properly Calibr & cross-correlated to Linear Power Channels at 100% Reactor Power
LD-97-002, Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns17 January 1997Part 21 Rept Re Piping Line Loss Between SG & MSIV Inlet When MSSVs Area Activated.Recommends That Utils Confirm Proper Adjustment of MSSV Blowdown Settings So as to Preclude Valve Chatter & Related Structural Concerns
LD-97-024, Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-00414 August 1997Part 21 Rept Re Error in Energy Redistribution Factor Used in LOCA Analysis for Listed Plants for Which ABB-CE Performed Analysis.Issued Recommendations Info Bulletin 97-004
LD-97-028, Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys13 October 1997Part 21 Rept Re Contamination of Lubricant Which Has Led to Hardening of Lubricant in Certain Potter & Brumfield Mdr Relay Models 170-1 & 7032.Will Distribute Copy of Rept to Utils Having ABB-CE Designed Nuclear Steam Supply Sys
LD-97-033, Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 97120120 November 1997Part 21 Rept Re Defect in Potter & Brumfield Mdr Relays, Models 170-1 & 7032.Extended Problem to Include All Mdr Relay Models W/Date Codes 93XX-95XX.Root Cause Analysis, Written Rept & Recommended Corrective Actions Due by 971201
ML17223A5949 March 1990Errata to 900126 Part 21 Rept Re Anchor/Darling Actuators Incorporating Use of Teldyne-Republic four-way Valves.Lists Plants Inadvertently Left Out in Original Rept
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML17289A69726 June 1992Amend 1 to Part 21 Rept 158 Re gear-wear Induced Failures in engine-driven Jacket Water Pump in DSRV-16-4 Standby DG Sys. Initially Reported on 911029.Grand Gulf Station Observed Wear Characteristics in as Little as 500 Operating Hours
ML17309A62129 September 1997Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga
ML17348B5069 October 1990Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML18036A0796 May 1980Part 21 Rept Re Workmanship & Design Defects of Some Wiring Connections Supplied by American Warming & Ventilating,Inc (Awv).Crimping Tools Under Evaluation.Awv Will Institute 100% Insp
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18065B01118 October 1996Part 21 Rept Re Application of Certain Aspects of ABB-CE Safety Analysis Methodology
ML18065B1356 January 1998Part 21 Rept Re Use of Deltstrat Code for RCS Flow Rate Determination.Code Corrects for Temps to Determine Hot Leg Bulk Coolant Temp
ML18066A27713 August 1998Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency
ML18079A95228 October 1978Deficiency Rept:On 780928,during Routine Design Review, Undersizing of Refueling Water Storage Tank Was Discovered. Tank Storage Capacity Has Been Increased.Design Drawings for Tank Piping & Foundation Will Be Modified
ML18081A3755 October 1979Significant Deficiency Rept Re Containment Purge & pressure- Vacuum Relief Valves.Actuator Torque Values Were Insufficient to Move Valves from Open to Closed Positions W/ Design Differential Pressure of 60 Psi.Design Reviewed
ML18081A3785 October 1979Significant Deficiency Rept 79-06 Re Steam Generator Water Level Instrumentation.Pipe Breaks in Containment Could Lead to Elevated Temp Readings Which Could Result in Delayed Protection Sys Actuation.Setpoints to Be Changed
ML18081A7554 October 1979Interim Deficiency Rept Re Max Flow of RHR Pump During post- LOCA Mode.Caused by Low Sys Resistance to Pump Runout Conditions.Sys Resistance Increased by Placement of Resized Orifices
ML18081B04821 December 1979Final Deficiency Rept Re Undetectable Failure in Engineered Safety Features Actuation Sys.Testing Procedures Revised to Include Testing of Permissive Circuitry P4 on Periodic Basis.Unit Will Be Tested Prior to Operation
ML18081B0603 December 1979Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility
ML18082A14215 February 1980Final Deficiency Rept:Check Valve 2DR-7 Failed to Meet Applicable Seismic Class I Loading.Caused by Design Defect. Addl Support Will Be Completed by 800228
ML18093A47223 October 1987Part 21 Rept Re Calibr Gas Leakage Problem in Exo-Sensors, Inc Containment Hydrogen Analyzer Sys.Caused by Design Deficiency Associated W/Calibr Gas Subassembly.Monitoring Program to Be Maintained for Period After Sys Mods
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML18094A44216 May 1989Part 21 Rept Re Defect in Solid State Protection Sys. During Mods in Solid State Protection Sys Cabinets,Noted That Two Wires Became Dislodged from Circuit Board.Visual Insp & Complete Pull Test Performed
ML18094B44627 April 1990Part 21 Rept Re shaft-to-pinion Key Failures in Limitorque Actuators.Initially Reported on 900424.Caused by Reduction of cross-sectional Area & Ultimate Propagation of Cracks. Util Intends to Replace Keys in Actuators W/Keys of Steel
ML18095A22522 May 1990Part 21 Rept Re Insufficient Welds on Pedestal Support Alignment Lug & Slide Shoe for 11,12,21 & 22 Charging/Safety Injection Pumps.Initially Reported on 900516.Windows Cut in Support Pedestals to Gain Access to Affected Areas
ML18095A23224 May 1990Part 21 Rept Re Discrepancies Identified in ECCS Flow Orifice K Factors Supplied by Westinghouse.Initially Reported on 900518.Util Fabricated New Orifice Plates to Original SpecsUnanalyzed Condition
ML18095A4032 August 1990Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency
ML18096B2421 February 1993Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl
ML18100A76813 December 1993Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced